[Amended 11-19-2003 by Ord. No. 3-2003]
Within 30 days after completion and approval by the Township of public and private improvements required by this chapter or Chapter
250, Zoning, as a condition of final plan approval and before the release of financial security for and acceptance of dedication of such public improvements or approval of the private improvements, the applicant or developer shall submit to the Board of Supervisors a corrected copy of said final plans in hard copy and on a computer disk (e.g., AutoCAD or such other system as may be compatible with the system used by the Township and its Engineer) or other electronic storage media with global positioning system (GPS) verified locations and dimensions of the public and private improvements including:
A. Wastewater sewerage lines, manholes, pump stations,
treatment facilities, and irrigation fields.
B. All water supply wells, pump stations or storage facilities
and water lines.
C. All storm sewers, storm sewer inlets and discharge
points, subsurface recharge beds, infiltrator and storage tanks or
pipes and all downspout connections to such facilities, and all permanent
detention or retention basins, diversion berms and drainage swales.
D. All public or private trails, bikeways, recreational
fields or structures and associated infrastructure improvements; and
any public or private buildings for postal facilities or rest rooms
or other purposes.