home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Rosendale, NY
chevron_right
2024-03-07
info
chevron_right
Part II: General Legislation
chevron_right
Chapter 75 Zoning
Part I: Administrative Legislation
Ch 1
General Provisions
Ch 3
Assessor
Ch 7
Conservation of the Environment, Commission for
Ch 8
Defense and Indemnification
Ch 8A
Drug and Alcohol Policy
Ch 8B
Drug-Free School Zones
Ch 9
Ethics, Board of
Ch 10
Ethics, Code of
Ch 12
Industrial Commission
Ch 12A
Mutual Assistance Agreements
Ch 13
Personal Vehicles, Use of
Ch 14
Pensions
Ch 15
Planning Board
Ch 16
Police Department
Ch 17
Procurement Policy
Ch 18
Recreation Commission
Ch 19
Salaries and Compensation
Ch 20
Terms of Office
Ch 21
Youth Commission
Ch 23
Zoning Board of Appeals
Part II: General Legislation
Ch 25
Bingo
Ch 27
Building Code Administration and Enforcement
Ch 28
Buildings, Unsafe
Ch 30
Curfew
Ch 32
Dogs and Other Animals
Ch 34
(Reserved)
Ch 36
Environmental Impact Statement
Ch 36A
Fair Housing
Ch 37
Fire Prevention
Ch 38
(Reserved)
Ch 41
Games of Chance
Ch 42
Handicapped Parking Enforcement
Ch 43
Heating Appliances
Ch 44
Junk Dealers
Ch 45
Mass Gatherings
Ch 47
Noise
Ch 50
Peddling and Soliciting
Ch 55
Racetracks
Ch 56
Records Retention
Ch 58
Sewers
Ch 58A
Solid Waste
Ch 59
Streets and Sidewalks
Ch 60
Subdivision of Land
Ch 63
Taxation
Ch 66
Trees
Ch 70
Vehicles, Abandoned and Illegally Parked
Ch 73
Water
Ch 74
Stormwater Management
Ch 75
Zoning
Ch 75 Art I
Title and Scope
§ 75-1
Scope.
§ 75-2
Title.
§ 75-3
Authority and purpose.
Ch 75 Art II
Zoning Districts
§ 75-4
Enumeration.
§ 75-5
Zoning Map.
§ 75-6
Interpretation of boundaries.
§ 75-7
Application of regulations.
Ch 75 Art III
Use Regulations
§ 75-8
Schedule of permitted uses.
§ 75-9
Prohibited uses.
Ch 75 Art IV
Area and Bulk Regulations
§ 75-10
Purpose.
§ 75-11
Density control regulations.
§ 75-12
Corner lots.
§ 75-13
Projections into required yards.
§ 75-14
Height exceptions.
§ 75-15
Supplemental lot area requirements.
§ 75-16
Side yards for semidetached and attached dwellings.
§ 75-17
Distance between principal buildings.
Ch 75 Art V
Supplementary Regulations
§ 75-18
General provisions.
§ 75-19
Purpose; provisions for off-street parking and loading.
§ 75-20
Light Industrial District.
§ 75-21
Gasoline filling stations.
§ 75-22
Signs.
§ 75-23
Mobile homes.
§ 75-24
Cemeteries and crematories.
§ 75-25
Sanitary disposal.
§ 75-26
Residential cluster development.
§ 75-27
Flood damage prevention regulations.
§ 75-28
Conditional uses allowed by special use permit.
§ 75-28.1
Stormwater control.
§ 75-28.2
Economic Enterprise Overlay Zone.
§ 75-28.3
Accessory dwelling units.
§ 75-28.4
Short-term transient rentals (STR).
§ 75-28.5
Adult-use cannabis-related businesses.
Ch 75 Art VI
Nonconforming Buildings, Uses and Lots
§ 75-29
Continuation.
§ 75-30
Discontinuance.
§ 75-31
Extension, alteration and restoration.
§ 75-32
Maintenance and repairs.
§ 75-33
Change to other nonconforming use.
§ 75-34
Construction started prior to chapter.
§ 75-35
Existing undersized lots.
§ 75-36
Reduction in lot area.
§ 75-37
Exemption of lots on approved subdivision plats.
Ch 75 Art VII
Administration
§ 75-38
Enforcement.
§ 75-39
Building permit and certificate of occupancy.
§ 75-40
Planning Board: site plan review; special permits; advisory opinions.
Ch 75 Art VIII
Zoning Board of Appeals
§ 75-41
Establishment and duties.
§ 75-42
Procedure and hearing.
§ 75-43
Appeals.
§ 75-44
Variances.
§ 75-45
Interpretation.
§ 75-46
Relief from decisions.
Ch 75 Art IX
Amendments
§ 75-47
Procedure.
§ 75-48
Referral to Planning Boards.
§ 75-49
Public notice and hearing.
§ 75-50
Protest by owners.
§ 75-51
Changes by Planning Board.
§ 75-52
Publication and posting.
Ch 75 Art X
Interpretation and Application
§ 75-53
Legislative intent.
§ 75-54
Noninterference, precedence and separability.
§ 75-55
Penalties for offenses.
Ch 75 Art XI
Definitions
§ 75-56
Definitions and word usage.
Ch 75 Art XII
Professional Review Expenses
§ 75-57
Professional review expense reimbursement.
Ch 75 Art XIII
Binnewater Lakes Conservation Planned Development Area
§ 75-58
Standards and design guidelines; permitted uses; bulk requirements; application requirements and approval.
Ch 75 Art XIV
Solar Photovoltaic (PV) Systems
§ 75-59
Definitions; minor and major solar collection systems; safety; fees.
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Chapter 75
Zoning
[HISTORY: Adopted by the Town Board of the Town of Rosendale 2-14-1990 by L.L. No. 1-1990
[1]
; amended in its entirety 2-8-1995 by L.L. No. 3-1995. Subsequent amendments noted where applicable.]
ATTACHMENTS
Attachment 1 - Schedule of Permitted Uses
Attachment 2 - Density Control Schedule
Attachment 3 - Riverine Setting
Attachment 4 - Special Flood Hazard Area
Attachment 5 - Schedule A
Attachment 6 - Schedule B
[1]
Editor's Note: This local law repealed former Ch. 75, Zoning, adopted 12-12-1969 by L.L. No. 1-1969, as amended.
Article I
Title and Scope
chevron_right
§ 75-1
Scope.
chevron_right
§ 75-2
Title.
chevron_right
§ 75-3
Authority and purpose.
chevron_right
Article II
Zoning Districts
chevron_right
§ 75-4
Enumeration.
chevron_right
§ 75-5
Zoning Map.
chevron_right
§ 75-6
Interpretation of boundaries.
chevron_right
§ 75-7
Application of regulations.
chevron_right
Article III
Use Regulations
chevron_right
§ 75-8
Schedule of permitted uses.
chevron_right
§ 75-9
Prohibited uses.
chevron_right
Article IV
Area and Bulk Regulations
chevron_right
§ 75-10
Purpose.
chevron_right
§ 75-11
Density control regulations.
chevron_right
§ 75-12
Corner lots.
chevron_right
§ 75-13
Projections into required yards.
chevron_right
§ 75-14
Height exceptions.
chevron_right
§ 75-15
Supplemental lot area requirements.
chevron_right
§ 75-16
Side yards for semidetached and attached dwellings.
chevron_right
§ 75-17
Distance between principal buildings.
chevron_right
Article V
Supplementary Regulations
chevron_right
§ 75-18
General provisions.
chevron_right
§ 75-19
Purpose; provisions for off-street parking and loading.
chevron_right
§ 75-20
Light Industrial District.
chevron_right
§ 75-21
Gasoline filling stations.
chevron_right
§ 75-22
Signs.
chevron_right
§ 75-23
Mobile homes.
chevron_right
§ 75-24
Cemeteries and crematories.
chevron_right
§ 75-25
Sanitary disposal.
chevron_right
§ 75-26
Residential cluster development.
chevron_right
§ 75-27
Flood damage prevention regulations.
chevron_right
§ 75-28
Conditional uses allowed by special use permit.
chevron_right
§ 75-28.1
Stormwater control.
chevron_right
§ 75-28.2
Economic Enterprise Overlay Zone.
chevron_right
§ 75-28.3
Accessory dwelling units.
chevron_right
§ 75-28.4
Short-term transient rentals (STR).
chevron_right
§ 75-28.5
Adult-use cannabis-related businesses.
chevron_right
Article VI
Nonconforming Buildings, Uses and Lots
chevron_right
§ 75-29
Continuation.
chevron_right
§ 75-30
Discontinuance.
chevron_right
§ 75-31
Extension, alteration and restoration.
chevron_right
§ 75-32
Maintenance and repairs.
chevron_right
§ 75-33
Change to other nonconforming use.
chevron_right
§ 75-34
Construction started prior to chapter.
chevron_right
§ 75-35
Existing undersized lots.
chevron_right
§ 75-36
Reduction in lot area.
chevron_right
§ 75-37
Exemption of lots on approved subdivision plats.
chevron_right
Article VII
Administration
chevron_right
§ 75-38
Enforcement.
chevron_right
§ 75-39
Building permit and certificate of occupancy.
chevron_right
§ 75-40
Planning Board: site plan review; special permits; advisory opinions.
chevron_right
Article VIII
Zoning Board of Appeals
chevron_right
§ 75-41
Establishment and duties.
chevron_right
§ 75-42
Procedure and hearing.
chevron_right
§ 75-43
Appeals.
chevron_right
§ 75-44
Variances.
chevron_right
§ 75-45
Interpretation.
chevron_right
§ 75-46
Relief from decisions.
chevron_right
Article IX
Amendments
chevron_right
§ 75-47
Procedure.
chevron_right
§ 75-48
Referral to Planning Boards.
chevron_right
§ 75-49
Public notice and hearing.
chevron_right
§ 75-50
Protest by owners.
chevron_right
§ 75-51
Changes by Planning Board.
chevron_right
§ 75-52
Publication and posting.
chevron_right
Article X
Interpretation and Application
chevron_right
§ 75-53
Legislative intent.
chevron_right
§ 75-54
Noninterference, precedence and separability.
chevron_right
§ 75-55
Penalties for offenses.
chevron_right
Article XI
Definitions
chevron_right
§ 75-56
Definitions and word usage.
chevron_right
Article XII
Professional Review Expenses
chevron_right
§ 75-57
Professional review expense reimbursement.
chevron_right
Article XIII
Binnewater Lakes Conservation Planned Development Area
chevron_right
§ 75-58
Standards and design guidelines; permitted uses; bulk requirements; application requirements and approval.
chevron_right
Article XIV
Solar Photovoltaic (PV) Systems
chevron_right
§ 75-59
Definitions; minor and major solar collection systems; safety; fees.
chevron_right