The following general requirements shall be followed for all
plan submissions:
A. No final subdivision or land development plan shall be approved,
no permit authorizing construction issued, or any earthmoving or land
disturbance activity initiated until the final stormwater management
plan for the development site is approved in accordance with the provisions
of this Part 2.
B. A development of a single lot for a single family home or estate
must submit a simplified stormwater management plan. This plan must
include a site location map, a soils map, the runoff calculations
and the routing computations through the stormwater detention system.
A site plan must be submitted with contours at two foot intervals
and all natural features including any natural watercourse.
C. The Borough Engineer shall review the proposed provisions for stormwater
management for a single lot for a single family home or estate. Where
the applicant is proposing to connect to an existing storm sewer,
the applicant shall demonstrate that sufficient capacity exists in
the storm sewer from the point of connection to the point of outlet
in the natural drainage system. The Borough Engineer shall determine
if the proposed development site is part of a larger parcel or tract
for which a stormwater management plan was approved previously and,
therefore, subject to any specific stormwater management control contained
in the prior plan.
D. At the time of the submission of an application by a developer for
stormwater management review, the developer shall also submit a fee,
which will be established from time to time by resolution of the Borough
Council of the Borough of Baldwin. Such fees shall be in payment of
the costs incurred by the Borough for the review by the Borough Engineer
of the development plan, for any legal fees incurred in preparation
of development plan agreements, and other services, which shall be
established by resolution of the Borough Council from time to time,
and the cost of issuing permits related to the plan.
E. Techniques described in Appendix E (Low Impact Development) of this chapter are encouraged, because they reduce the costs of complying with the requirements of this Part
2 and the state water quality requirements.
F. In conjunction with meeting the requirements of this Part 2, the
applicant shall refer to and meet all conditions and requirements
set forth in the Borough of Baldwin Municipal Separate Storm Sewer
System (MS4) Prohibited Discharge Ordinance.
G. In conjunction with meeting the requirements of this Part 2, the
Applicant shall refer to and meet all conditions and requirements
set forth in the Borough of Baldwin Total Maximum Daily Load (TMDL)
Plan as adopted and revised.
In conjunction with meeting the requirements of this Part 2,
the applicant shall refer to and meet all conditions and requirements
set forth in the Borough of Baldwin's Municipal Separate Storm
Sewer System (MS4) Prohibited Discharge Ordinance.