A. 
General requirements. The final stormwater management plan shall be prepared using the general performance and technical standards and requirements for plan format contained in Part 1, the Subdivision and Land Development Ordinance, and in this article with the following additions:
(1) 
All information pertaining to stormwater management from the preliminary plan along with any changes.
(2) 
Final maps showing the exact nature and location of all temporary and permanent stormwater management controls along with design and construction specifications. Details for the construction of all facilities shall be included as part of the construction drawings.
(3) 
A schedule for the installation of all temporary and permanent stormwater control measures and devices.
(4) 
An accurate survey showing all current and proposed easements and rights-of-way and copies of all proposed deed restrictions.
(5) 
A maintenance program establishing ownership and maintenance responsibilities for all stormwater control facilities (identify specific person or entity) and detailing financial requirements and sources of funding. Submit any legal agreements required to implement the maintenance program and copies of the maintenance agreement as specified by this article.
(6) 
Financial guaranties, to ensure that all stormwater controls are installed properly and functioning satisfactorily.
(7) 
Anything else within reason that might be required by the Borough Engineer and/or Borough of Baldwin to effectuate the purposes of this Part 2.
(8) 
Appendix B. The final stormwater management plan checklist must be competed and submitted.[1]
[1]
Editor's Note: Appendix B is included at the end of this chapter.
(9) 
Notification of adjacent property owners.
B. 
Additional information. The information requested in Appendixes A, B and C must be submitted.[2]
[2]
Editor's Note: Said Appendixes are included at the end of this chapter.