This article shall be known as the "Heating/Ventilation/Air
Conditioning Code of the Village of Atlantic Beach."
As used in this article, the following terms
shall have the meanings indicated:
It shall be the duty of the Building Inspector,
and he is hereby given the power and authority, to enforce the provisions
of this article.
The Building Inspector shall examine applications for permits, and, if the same are found to comply with the provisions of this article, a permit for the work specified shall be issued. All applications and permits shall comply with the same requirements of Article
I and
II in this chapter.
[Added 8-8-2005 by L.L. No. 1-2005]
A. HVAC equipment shall be permitted in one of the required
side yards, provided that said side yard shall not be diminished
thereby to a width of less than four feet or as permitted by a notarized
release form in Residence A Districts.
B. HVAC equipment shall be permitted in one of the required
side yards, provided that said side yard shall not be diminished
thereby to a width of less than five feet or as permitted by a notarized
release form in Residence C Districts.
[Added 11-14-2011 by L.L. No. 2-2011]
A. Generators
(permanent or portable) shall be permitted in one of the required
side or rear yards, provided that said side yard shall not be diminished
thereby to a width of less than four feet and the rear yard shall
not be diminished thereby to a distance less than five feet from the
rear property line in Residence A Districts.
B. Generators
(permanent or portable) shall be permitted in one of the required
side or rear yards, provided that said side yard shall not be diminished
thereby to a width of less than five feet and the rear yard shall
not be diminished thereby to a distance less than five feet from the
rear property line in Residence C Districts.
C. Generators
shall not be permitted in the front yard setback.
[Added 11-14-2011 by L.L. No. 2-2011]
Every application shall be examined as soon as practicable after
filing, and, if it conforms to this article, a permit for the work
shall be issued.
A. Every
such permit shall be signed by the Building Inspector.
B. Fees.
The fee to be charged for applications, permits and inspection conducted
pursuant to this chapter shall be established by resolution of the
Board of Trustees. The current License Fee and Fee Schedule are on
file in the Village Clerk’s office.