Trenches in unpaved streets shall be refilled
with moist, damp earth or by means of water tamping. When water tamping
is used, the water shall be turned into the trench after the first
12 inches of backfill has been placed and then the trench shall be
kept flooded until the remainder of the backfill has been put in.