No application for approval of a land development
activity shall be reviewed until the appropriate board has received
a stormwater pollution prevention plan (SWPPP) prepared in accordance
with the specifications in this article.
The SWPPP shall be prepared by a landscape architect,
certified professional or professional engineer and must be signed
by the professional preparing the plan, who shall certify that the
design of all stormwater management practices meets the requirements
in this article.
The applicant shall assure that all other applicable
environmental permits have been or will be acquired for the land development
activity prior to approval of the final stormwater design plan.
A copy of the SWPPP shall be retained at the
site of the land development activity during construction from the
date of initiation of construction activities to the date of final
stabilization.
All land development activities shall be subject
to the following performance and design criteria:
A. Technical standards. For the purpose of this article,
the following documents shall serve as the official guide and specifications
for stormwater management. Stormwater management practices that are
designed and constructed in accordance with these technical documents
shall be presumed to meet the standards imposed by this article:
(1) The New York State Stormwater Management Design Manual
(New York State Department of Environmental Conservation, most current
version or its successor, hereafter referred to as the "Design Manual");
and
(2) New York Standards and Specifications for Erosion
and Sediment Control (Empire State Chapter of the Soil and Water Conservation
Society, 2004, most current version or its successor, hereafter referred
to as the "Erosion Control Manual").
B. Water quality standards. Any land development activity
shall not cause an increase in turbidity that will result in substantial
visible contrast to natural conditions in surface waters of the state
of New York.