[Approved 12-6-1990 by Ch. No. 2170; amended in its entirety 10-6-2005 by Ch. No. 2784]
[Amended 8-25-2010 by Ch. No. 2946; 2-25-2016 by Ch. No. 3091; 7-10-2025 by Ch. No. 3321]
Pursuant to RIGL § 23-27.3-100.1.1(4) building, electrical, plumbing and mechanical fees are set by the Rhode Island Building Code Commissioner.
[Amended 8-25-2010 by Ch. No. 2946; 7-10-2025 by Ch. No. 3321]
The following flat fees and other fees shall be charged:
Type
Fee
Certificate of completion
$100
Certificate of occupancy (including temporary certificate of occupancy):
Commercial/industrial, single tenants
$100
Residential (per unit)
$100
Certificate of zoning compliance:
Commercial-rental unit space, per rental unit
$50
Residential property, flat fee
$50
Late permit application fee
Two times the cost of the permit or $250, whichever is more
Annual permit fee
$100
[Amended 10-25-2007 by Ch. No. 2877; 8-25-2010 by Ch. No. 2946; 7-10-2025 by Ch. No. 3321]
Any person, firm, corporation or other entity who erects, enlarges or alters a structure, or installs or alters any equipment. the installation of which is regulated by an applicable code, without first obtaining a building permit or permits for plumbing, electrical and mechanical from the City, or who removes or destroys without authority a cease and desist or stop work order. shall be subject to punishment as provided in § 202-2. The responsibility for paying the fines or penalties shall rest with the owner of the real estate. These fines or penalties are in addition to such other remedies as the City may have.
A. 
Any person found in violation of the provisions of this section shall have the right to appeal to the municipal court any finding of violation or assessment of fines. fees or penalties within 15 days of issuance of citation thereof.
[Amended 7-10-2025 by Ch. No. 3321]
In the event of a failed inspection, a second inspection will be scheduled once the deficiencies addressed in the failed inspection are corrected. If the second inspection is failed a fee of $150 shall be charged for the necessary reinspection of the corrected work. The failed inspection fee shall be paid prior to the approval of the final reinspection.