Before final approval of a plat, the subdivider shall install street
and utility improvements as hereinafter provided. If such improvements are
not installed as required at the time that the final plat is submitted for
approval, the subdivider shall, before the approval of the plat, enter into
a development agreement with Elm Grove agreeing to install the required improvements
and file, as a condition of execution of said developer's agreement,
a bond in the amount of 110% of the estimated cost of the improvements and
in form meeting the approval of the Village Attorney or a certified check
in an amount equal to 110% of the estimated cost of the improvements. This
estimate is to be made by the Village Engineer, as a guaranty that such improvements
will be completed by the subdivider or his subcontractors not later than one
year from the date of recording of the plat and as a further guaranty that
all obligations to subcontractors for work on the development are satisfied.
Contractors and subcontractors who are to be engaged in the construction
of street and utility improvements on dedicated street rights-of-way shall
be subject to the approval of the Village Engineer.
The subdivision shall be monumented as required by Section 236.15 of
the Wisconsin Statutes which is hereby adopted by reference.
Within 10 days of final approval of a final plat or certified survey
map, subdividers shall provide the Village Engineer with an electronic file
of the final plat or certified survey map in a format compatible with the
village's digital parcel mapping and Geographic Information System (GIS)
as specified by the Village Engineer.