The following fees shall be applicable:
A. 
Site plans; accompanying variance or conditional use requests; filing fees.
(1) 
Informal review, concept plan: $100. The amount of any fees shall be credited toward fee for review of the application for development.
(2) 
Minor site plan: $100.
(3) 
Preliminary site plan: $100.
(4) 
Final site plan: $100.
(5) 
Consolidated submission: $200.
(6) 
Variance: $50 for each.
(7) 
Use: $200.
(8) 
A request for a variance or conditional use accompanying a site plan will require filing of a separate application and the appropriate fee, in addition to the site plan application and fee.
B. 
Escrows (professional review fee).
(1) 
Informal review; concept plan: $200. The amount of escrow charge for informal review shall be credited toward the applicant's escrow account to be applied to the application for development.
(2) 
Minor site plan: $200 or $50 per acre, whichever is greater.
(3) 
Preliminary site plan: $500, plus $50 per acre.
(4) 
Final site plan: $200, plus $50 per acre.
(5) 
Consolidated submission: $700, plus $100 per acre.
(6) 
Escrow for inspection: 6% of the bonded amount.
C. 
Sums not utilized for review and in the inspection process shall be returned to the applicant. If additional sums are deemed necessary, the applicant shall be notified of the required additional amount and shall add such sum to the escrow.
D. 
Site plan waiver. A fee of $25 shall be submitted with each application for site plan waiver. Said fee shall be applied toward the fee required for site plan in the event that the waiver is not granted.
[Amended 4-26-2018 by Ord. No. 651]
For the purpose of assuring the installation and maintenance of bondable land development improvements, as a condition of all final site plan, subdivision, and/or zoning permit approvals, the Board and/or Zoning Officer shall require, as appropriate, and the Borough Council shall accept, in accordance with the standards adopted hereinafter:
A. 
The furnishing of a performance guarantee in favor of the Borough in an amount not to exceed 120% of the cost of the improvement, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in N.J.S.A. 40:55D-53.4 for any and all bondable items as permitted therein. The Borough Engineer shall prepare an itemized cost estimate of the improvements covered by the performance guarantee, which itemized cost estimate shall be appended to each performance guarantee posted by the obligor.
B. 
The furnishing of a maintenance guarantee in favor of the Borough in an amount not to exceed 15% of the cost of the improvement, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in N.J.S.A. 40:55D-53.4 for any and all bondable items as permitted therein.
C. 
The furnishing of a temporary certificate of occupancy guarantee in the amount of 120% of the cost of installing the remaining improvements required to be completed before the issuance of a permanent certificate of occupancy. The scope and amount of such a guarantee will be determined by the Borough Engineer.
D. 
The furnishing of a safety and stabilization guarantee to return the property to a safe and stable condition or to otherwise implement measures to protect the public from access to an unsafe or unstable condition. The amount of such a guarantee shall be $5,000 where the overall bonded improvements are $100,000 or less. Where the overall bonded improvements are $100,000 or more, then the Borough Engineer shall calculate the bond amount in accord with the following: $5,000 for the first $100,000 of bonded improvement costs, plus 2.5% of bonded improvement costs in excess of $100,000 up to $1,000,000, plus 1% of bonded improvement costs in excess of $1,000,000.
[Added 4-26-2018 by Ord. No. 651]
In the event that other governmental agencies or public utilities will automatically own the utilities to be installed or the improvements are covered by a performance or maintenance guarantee to another governmental agency, no performance or maintenance guarantee, as the case may be, shall be required by the Borough for such utilities or improvements.
[Added 4-26-2018 by Ord. No. 651]
If the required improvements are not completed or corrected in accordance with the performance guarantee, the obligor and surety, if any, shall be liable thereon to the Borough for the reasonable cost of the improvements not completed or corrected, and the Borough may, either prior to or after the receipt of the proceeds thereof, complete such improvements. Such completion or correction of improvements shall be subject to the public bidding requirements of the Local Public Contracts Law, N.J.S.A. 40A:11-1, et seq.
[Added 4-26-2018 by Ord. No. 651]
All improvements shall be in accordance with the design standards of the Borough Code or as authorized by a design exception granted by the reviewing board and shall be subject to inspection and approval by the Borough Engineer. The Borough Engineer shall be notified 24 hours prior to the start of the various phases of the work and, if discontinued, shall again be notified when the work will be continued.
[Added 4-26-2018 by Ord. No. 651]
A. 
Upon substantial completion of all required improvements, the obligor may request of the governing body, in writing, by certified mail addressed in care of the Borough Clerk, that the Borough Engineer prepare, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to this chapter, a list of all uncompleted or unsatisfactorily completed improvements. If such a request is made, the obligor shall send a copy of the request to the Borough Engineer. The request shall indicate which improvements have been completed and which improvements remain uncompleted in the judgment of the obligor. Thereupon, the Borough Engineer shall inspect all improvements covered by the obligor's request and shall file a detailed list and report, in writing, to the Borough Council, and shall simultaneously send a copy thereof to the obligor not later than 45 days after receipt of the obligor's request.
B. 
The list prepared by the Borough Engineer shall state, in detail with respect to each improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of, and remedy for, the unsatisfactory state of each completed improvement determined to be unsatisfactory. The report prepared by the Borough Engineer shall identify each improvement determined to be complete and satisfactory, together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory improvement, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to this chapter.
C. 
The Borough Council, by resolution, shall either accept the improvements determined to be complete and satisfactory by the Borough Engineer, or reject any or all of these improvements upon the establishment in the resolution of cause for rejection, and shall approve and authorize the amount of reduction or release to be made in the performance guarantee relating to the improvements accepted, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to this chapter. This resolution shall be adopted not later than 45 days after receipt of the list and report prepared by the Borough Engineer. Upon adoption of the resolution by the Borough Council, the obligor shall be released from all liability pursuant to its performance guarantee, with respect to those accepted improvements, except for that portion sufficient to secure completion or correction of the improvements not yet accepted, provided that 30% of the amount of the performance guarantee posted may be retained to ensure completion and acceptability of all improvements. If any portion of the required improvements is rejected, the Borough shall require the obligor to complete or correct such improvements; and upon completion or correction, the same procedure of notification, as set forth in this section, shall be followed.
[Added 4-26-2018 by Ord. No. 651]
The obligor shall reimburse the Borough for all reasonable inspection fees paid to the Borough Engineer for the foregoing inspection of improvements, provided that the municipality may require of the developer a deposit for the inspection fees in an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of improvements, which cost shall be determined pursuant to N.J.S.A. 40:55D-53.4.
[Added 4-26-2018 by Ord. No. 651]
In the event that final approval is by stages or sections of development pursuant to Subsection a of Section 29 of P.L. 1975, c. 291 (N.J.S.A. 40:55D-38), the provisions of this section shall be applied by stage or section.
[Added 4-26-2018 by Ord. No. 651]
To the extent that any of the improvements have been dedicated to the Borough on the subdivision plat, site plan and/or zoning permit, the municipality shall be deemed, upon the release of any performance guarantee required hereunder, to accept dedication for public use of any improvements made thereunder, provided that such improvements have been inspected and have received final approval by the Borough Engineer.