No sewage disposal system shall be constructed, repaired or installed
in the City until a permit has been obtained from the Director of Health or
his authorized representative.
A report shall be filed with the Director of Health within 48 hours
of pumping/cleaning a septic tank. The report must be made by the septic tank
cleaner on forms approved by the Director of Health.
[Amended 1-5-1998]
A fee of $100 for each report issued by the Director of Health shall
be required from an applicant that requests information concerning the functioning
of a sewage disposal system.