[Amended 12-16-2003 by Ord. No. 6387-03]
As required by state statute, City ordinance
and/or other law, the City Engineer shall be required to provide plan
reviews for actions before the Zoning Board of Adjustment and the
Planning Board. The fee for said plan review shall be $100 to be paid
by the applicant; however, plan reviews for one- and two-family homes
shall be excluded from this section.
[Amended 12-16-2003 by Ord. No. 6387-03]
The City Engineer shall appear before the Zoning
Board of Adjustment and the Planning Board on an as-required basis.
The fee to be paid by the applicant for said appearance shall be $100;
however, appearances on matters involving one- or two-family homes
shall be excluded from this section.
[Amended 12-16-2003 by Ord. No. 6387-03; 2-20-2007 by Ord. No. 6646-07; 6-19-2007 by Ord. No. 6669-07]
From time to time, personnel of the City of
Clifton Engineering Department shall be required to perform on-site
inspections for various reasons. The fees for such inspections shall
be as follows:
A. For application to the Planning Board and/or Zoning
Board of Adjustment. The fee for such on-site inspections shall be
$200 per inspection, to be paid by the applicant. However, such inspections
for one- and two-family homes shall be excluded from this section.
B. For sidewalk construction permit, the fee shall be
$25 per inspection.
C. For curb construction permit, the fee shall be $25
per inspection.
[Added 3-4-1997 by Ord. No. 5875-97; amended 1-2-2008 by Ord. No. 6711-08]
The fee for each storm sewer connection shall
be $75 per connection.