During the construction of the required improvements
covered under the terms of the performance bond, existing Town roads,
streets and adjoining private property shall be kept free of debris
caused by the construction operation or by stormwater runoff from
the development site. Any damage so caused shall be immediately repaired
by the developer at his own expense. If, after due notice by the Planning
Board, the developer does not proceed to make the necessary repairs
or to remove the debris caused by his operations, the Town Board may
take necessary measures to correct the situation, and the costs shall
be paid by the developer.