This chapter shall be known as the "Birmingham Township Stormwater
Management Ordinance."
The Board of Supervisors of Birmingham Township finds that:
A. Inadequate management of accelerated stormwater runoff resulting
from land disturbance and development throughout a watershed increases
flooding, flows and velocities, contributes to erosion and sedimentation,
overtaxes the capacity of streams and storm sewers, greatly increases
the cost of public facilities to convey and manage stormwater, undermines
floodplain management and flood reduction efforts in upstream and
downstream communities, reduces infiltration and groundwater recharge,
increases nonpoint source pollution to waterways, and threatens public
health and safety.
B. Inadequate planning and management of stormwater runoff resulting
from land disturbance and development throughout a watershed can harm
surface water resources by changing the natural hydrologic patterns,
accelerating stream flows (which increase scour and erosion of stream
beds and stream banks, thereby elevating sedimentation), destroying
aquatic habitat, and elevating aquatic pollutant concentrations and
loadings such as sediments, nutrients, heavy metals, and pathogens.
Groundwater resources are also impacted through loss of recharge.
C. A comprehensive program of stormwater management, including minimization
of impacts of new development, redevelopment, and other earth disturbance
activities causing accelerated runoff and erosion and loss of natural
infiltration, is fundamental to the public health, safety, and general
welfare of the people of the municipality and all of the people of
the commonwealth, their resources, and the environment.
D. Stormwater is an important water resource that provides infiltration
and groundwater recharge for water supplies and baseflow of streams,
which also protects and maintains surface water quality.
E. Impacts from stormwater runoff can be minimized by reducing the volume
of stormwater generated and by using project designs that maintain
the natural hydrologic regime and sustain high water quality, infiltration,
stream baseflow, and aquatic ecosystems. Cost-effective and environmentally
sensitive stormwater management can be achieved through the use of
nonstructural site design techniques that minimize impervious surfaces,
reduce disturbance of land and natural resources, avoid sensitive
areas (i.e., riparian buffers, floodplains, steep slopes, wetlands,
etc.), and consider topography and soils to maintain the natural hydrologic
regime.
F. Public education on the control of pollution from stormwater is an
essential component in successfully addressing stormwater.
G. Federal and state regulations require the municipality to implement
a program of stormwater controls. The municipality is required to
obtain a permit and comply with its provisions for stormwater discharges
from its separate storm sewer system under the National Pollutant
Discharge Elimination System (NPDES).
H. Nonstormwater discharges to municipal or other storm sewer systems
can contribute to pollution of the waters of the commonwealth.
I. The use of green infrastructure, low impact development (LID), and
conservation design (CD) are intended to address the root cause of
water quality impairment by using systems and practices which use
or mimic natural processes to: 1) infiltrate and recharge, 2) evapotranspire,
and/or 3) harvest and use precipitation near where it falls to earth.
Green infrastructure practices, LID, and CD contribute to the restoration
or maintenance of predevelopment hydrology.
The purpose of this chapter is to protect public health, safety
and general welfare, property and water quality by implementing drainage
and stormwater management practices, criteria, and provisions included
herein for land development, construction and earth disturbance activities,
to achieve the following throughout the municipality:
A. Reduce the frequency and magnitude of flooding and stormwater impacts
affecting people, property, infrastructure and public services.
B. Sustain or improve the natural hydrologic characteristics and water
quality of groundwater and surface waters.
C. Protect natural resources, including riparian and aquatic living
resources and habitats.
D. Maintain the natural hydrologic regime of land development sites
and their receiving watersheds.
E. Minimize land disturbance and protect and incorporate natural hydrologic
features, drainage patterns, infiltration, and flow conditions within
land development site designs.
F. Reduce and minimize the volume of stormwater generated, and manage
and release stormwater as close to the source of runoff as possible.
G. Provide infiltration and maintain natural groundwater recharge to
protect groundwater supplies and stream baseflows, prevent degradation
of surface water and groundwater quality, and to otherwise protect
water resources.
H. Reduce stormwater pollutant loads to protect and improve the chemical,
physical, and biological quality of ground and surface waters.
I. Reduce scour, erosion and sedimentation of stream channels.
J. Reduce flooding impacts and preserve and restore the natural flood-carrying
capacity of streams and their floodplains.
K. Protect adjacent and downgradient lands from adverse impacts of direct
stormwater discharges.
L. Minimize impervious surfaces and connected impervious surfaces to
promote infiltration and reduce the volume and impacts of stormwater
runoff.
M. Provide proper long-term operation and maintenance of all permanent
stormwater management facilities, BMPs and conveyances that are implemented
within the municipality.
N. Reduce the impacts of runoff from existing developed land undergoing
redevelopment while encouraging new development and redevelopment
in urban areas and areas designated for growth.
O. Implement an illicit discharge detection and elimination program
that addresses nonstormwater discharges.
P. Provide stormwater management performance standards and design criteria
on a watershed basis.
Q. Provide standards to meet certain NPDES stormwater permit requirements.
R. Meet legal water quality requirements under state law, including
regulations at 25 Pa. Code Chapter 93, to protect, maintain, reclaim
and restore the existing and designated uses of the waters of the
commonwealth.
S. Implement the requirements of total maximum daily load (TMDLs) where
applicable to waters within or impacted by the municipality.
T. Provide review procedures and performance standards for stormwater
planning and management.
U. Fulfill the purpose and requirements of PA Act 167 (PA Act 167, Section
3):
(1)
Encourage planning and management of stormwater runoff in each
watershed which is consistent with sound water and land use practices.
(2)
Authorize a comprehensive program of stormwater management designated
to preserve and restore the flood-carrying capacity of commonwealth
streams; to preserve to the maximum extent practicable natural stormwater
runoff regimes and natural course, current and cross-section of water
of the commonwealth; and to protect and conserve ground waters and
groundwater recharge areas.
(3)
Encourage local administration and management of stormwater
consistent with the commonwealth's duty as trustee of natural
resources and the people's constitutional right to the preservation
of natural, economic, scenic, aesthetic, recreational and historic
values of the environment.
The municipality is empowered or required to regulate land use
activities that affect runoff and surface and groundwater quality
and quantity by the authority of:
A. Act of October 4, 1978, P.L. 864 (Act 167) 32 P.S. § 680.1
et seq., as amended, the "Stormwater Management Act" (hereinafter
referred to as "the Act");
B. Second Class Township Code, 53 P.S. § 65101 et seq.;
C. Act of July 31, 1968, P.L. 805, No. 247, 53 P.S. § 10101
et seq., as amended, the Pennsylvania Municipalities Planning Code,
Act 247 hereinafter referred to as the "MPC").
The Birmingham Township Stormwater Management Ordinance that was adopted by the Board of Supervisors on December 4, 2013, effective January 1, 2014, as Ordinance No. 13-01, as amended, which is codified in Chapter
101 of the Birmingham Township Code, is hereby repealed in its entirety and replaced with this chapter. Any other ordinance or ordinance provision of the municipality inconsistent with any of the provisions of this chapter are hereby repealed to the extent of the inconsistency only.
For all activities requiring submittal of a stormwater management
(SWM) site plan that involve subdivision or land development, the
applicant shall post financial security to the municipality for the
timely installation and proper construction of all stormwater management
facilities as required by the approved SWM site plan and this chapter,
and such financial security shall:
A. Be equal to or greater than the full construction cost of the required
facilities except to the extent that financial security for the cost
of any of such improvements is required to be and is posted with the
Pennsylvania Department of Transportation in connection with a highway
occupancy permit application; and
B. Be determined, collected, applied and enforced in accordance with
§§ 509 through 511 of the MPC and the provisions of Chapter
103, Subdivision and Land Development Ordinance (SALDO), of the Code of the Township of Birmingham.
Any permit or authorization issued or approved based on false,
misleading or erroneous information provided by an applicant is void
without the necessity of any proceedings for revocation. Any work
undertaken or use established pursuant to such permit or other authorization
is unlawful. No action may be taken by a board, agency, or employee
of the municipality purporting to validate such a violation.