A.
All subdivision and/or resubdivision of land within the Township, as defined in § 60-4, shall be reviewed by the Planning Board in accordance with the provisions of this chapter. Every residential major subdivision within an A Agricultural or RR Rural Residence Zoning District that creates three or more new lots in addition to the remainder or reserved parcel must be a planned residential cluster development as set forth in § 60-97.
[Amended 3-14-2006 by Ord. No. 3-2006]
B.
Except as otherwise provided, no zoning or construction permit shall be issued for any building or use or any enlargement or alteration of any building or use unless a site plan for said building or use is first submitted to and approved by the Land Use Board, and no zoning permit shall be given or remain valid unless all construction and site utilization conforms to an approved site plan. This requirement shall pertain to all uses and structures in all zoning districts, except that:
(1)
Site plans shall not be required for:
(a)
Any single-family dwelling; for permitted accessory uses to a single-family dwelling such as a private garage or swimming pool, but excluding home occupations;
(b)
Agricultural uses;
(c)
A farm or any permitted accessory use thereto such as barn, silo, storage shed or related structure; or
(d)
Any Township-owned principal and accessory uses.
(2)
Site plan review and approval will not be required in connection with the alteration and repair of an existing structure or use, when the Zoning Officer determines that the alteration or repair:
(3)
The Land Use Board may waive the requirement of this subsection if the proposed development has secured previous site plan approval or when the Land Use Board is convinced that the development will not affect existing circulation, drainage, building arrangement, landscaping, buffering, lighting and other consideration of site plan review on the property of the proposed development, and that the proposed development will not create an additional or new need for said considerations of site plan. Such waiver of site plan review shall require notice as per § 60-28.