Whenever in accordance with the Building and
Housing Codes of the City of Trenton, including such standard, state-wide
codes as shall be adopted by the City, it shall be required to secure
windows, doorways and other entrances to buildings, residential, commercial
or otherwise, by the use of boards or other temporary closing materials,
it shall be the responsibility of the owner of such property, and
of his/her agents for the custody and management of such property,
to maintain such property in full compliance with such codes and to
paint such materials, using colors matching the color of the trim
of the rest of the building.
Owners of automobile service station facilities
which cease operation for more than one year shall be required to
removal all underground tanks used for the storage of gasoline, oil
and other combustible liquids.
The hearing fee for appeals to the Construction
Board of Appeals shall be $250.
[9-5-2002 by Ord. No. 02-67; 2-5-2009 by Ord. No. 09-03; 10-17-2013 by Ord. No. 13-43; amended 9-21-2023 by Ord. No. 23-55]
A. Construction fees.
(1) Fees for new construction and additions shall be based upon the volume
of the structure. Volume shall be computed in accordance with N.J.A.C.
5:23-2.28.
(a)
For new construction for Use Groups B, E, H-1, H-2, H-3, H-4,
I-1, I-2, I-3, M, R-1, R-2, R-3, R-4, R-5, T and U, the fee shall
be $0.07 per cubic foot of volume; and
(b)
For new construction for Use Groups A-1, A-2, A-3, A-4, F-1,
F-2, S-1 and S-2, the fee shall be $0.04 per cubic foot of volume.
(2) Other work.
(a)
For all other work, fees shall be as based on estimated cost
as follows:
$50,000 or less
|
$54 per $1,000
|
$50,001 to $100,000
|
$48 per $1,000
|
$100,001 and above
|
$39 per $1,000
|
(b)
For the purposes of determining estimated cost of the work,
the applicant shall submit such cost data as may be available as produced
by the architect or engineer of record, by a recognized estimating
firm or by the contract. The Construction Official shall make the
final decision regarding estimated cost.
(c)
The minimum fee for a permit for alteration, renovation and
minor work shall be $45.
(3) For additions, the fee shall be computed on the same basis as for
new construction for the added portion.
(4) For a combination of renovations and additions, the fee shall be
computed as the sum of the fees compounded separately.
(5) For modular homes, the fee shall be a flat rate of $648 plus $0.07
per cubic foot for foundations and attached garages.
B. Plumbing fixtures and equipment.
(1) For a all fixtures and appliances, except as listed below, the fee
shall be $68 for the first three fixtures. Thereafter, each additional
fixture shall be #32 for residential uses and $45 for commercial uses,
except for water heaters, which shall be $103 for residential uses
and $129 for commercial uses ($32 for new homes).
(2) For active solar systems, backflow preventers, gas piping, grease
traps, hot water boilers (excluding those for domestic water heating),
interceptors and fuel oil piping, oil separators, refrigeration units,
sewer pumps, steam boilers, utility services connections, LP gas tanks
and water-cooled air-conditioning units, the fee shall be $147 per
special device. There shall be no inspection fee for gas service entrances.
C. Electric fixtures and devices.
(1) For one to 20 receptacles or fixtures, the fee shall be $75, and
$13 for each additional 20 receptacles or fixtures. For the purpose
of computing this fee, receptacles or fixtures and motors or devices
of one horsepower or one kilowatt or less.
(2) For each motor or electrical device:
(a)
Greater than one horsepower and less than or equal to 10 horsepower,
and for transformers and generators greater than on kilowatt and less
than or equal to 10 kilowatts: $32.
(b)
Greater than 10 horsepower and less than or equal to 50 horsepower,
for each service entrance or subpanel less than or equal to 200 amperes,
and for all transformers and generators greater than 10 kilowatts
and less than or equal to 45 kilowatts: $116.
(c)
Greater than 50 horsepower and less than or equal to 100 horsepower,
for each service panel, service entrance or subpanel greater than
200 amperes and less than or equal to 1,000 amperes, and for each
transformer or generator greater than 45 kilowatts and less than or
equal to 112.5 kilowatts: $226.
(d)
Greater than 100 horsepower, for each service panel, service
entrance or subpanel greater than 1,000 amperes, and for each transformer
or generator greater than 112.5 kilowatts: $1,058.
(3) For the purposes of computing these fees, all motors, except those
in plug-in appliances, shall be counted, including control equipment,
generators, transformers and all heating, cooking or other devices
consuming or generating electrical current.
D. Fire protection and hazardous equipment. The minimum fee for items
in this section shall be $100.
(1) Detectors.
(a)
For detectors (smoke, heat and sprinkler heads), the fees shall
be as follows:
Heads or Detectors
|
Fee
|
---|
20 or fewer
|
$175
|
21 to 100
|
$322
|
101 to 200
|
$606
|
201 to 400
|
$1,419
|
401 to 999
|
$2,000
|
1,000 to 1,999
|
$3,386
|
2,000 to 2,999
|
$5,645
|
3,000 or greater
|
$6,773
|
(b)
In computing these fees, the number of each shall be counted
separately, and two separate fees shall be charged.
(2) For each standpipe: $517.
(3) For each independent pre-engineered system: $208.
(4) For each gas or oil fired appliance that is not connected to the
plumbing system: $104.
(5) For each kitchen exhaust system: $105.
(7) For each crematorium: $471.
(8) For fire pump installation, the fees shall be set forth in Subsection
A(2)(a) of this §
42-12.
(10)
Underground water service: $400.
(11)
Underground water storage: $200.
(13)
Fire Extinguishers.
(b)
21-50 extinguishers: $100.
(c)
51-100 extinguishers: $175.
(14)
Fire Alarm Control Panel (FACP): $200.
(15)
Air sampling smoke detector: $450.
(16)
Smoke control system: $450.
(17)
Solar Systems.
(a)
R3/R5 solar system: $125.
(b)
All other solar systems: $250.
E. Other permits.
(1) For a demolition permit for Use Group R-3:
(a)
For a structure of less than 5,000 square feet and less than
30 feet in height for one- or two-family residences: $170, plus $250
for each sidewall repair.
(b)
For all other use groups: $312.
(2) For permit for the removal of a building or structure from one lot
to another or to a new location on the same lot, the fee shall be
$31 per $1,000 of the estimated cost of the work. For new foundation
placement in a completed condition in the new location, the fee shall
be based on the cubic content.
(3) For a permit to construct a sign, the fee shall be $3.12 per square
foot of surface area of the sign, computed on one side only for double-faced
signs.
(4) The minimum fee shall be: $105.
F. Certificates and other fees.
(1) For certificate of occupancy.
(a)
For all use groups, except those listed below, the fee shall
be 10% of the new construction permit fee that would be charged pursuant
to these regulations. The minimum fee shall be $155. For Use Group
R-2 there will be an additional charge of $32 per unit.
(b)
For Use Group R-3 of less than 5,000 square feet in area and
less than 30 feet in height, the fee shall be 10% of the new construction
permit fee that would be charged pursuant to these regulations. The
minimum fee shall be $84.
(2) For a certificate of occupancy granted pursuant to a change of use
group, the fee shall be $225. For Use Group R-2, there will be an
additional charge $32 per unit.
(3) The fee for the renewal of a temporary certificate of occupancy shall
be $39 each time that it is renewed. There shall be no fee for the
initial issuance of a temporary certificate of occupancy.
(4) For a plan review of a building for compliance under the alternate
systems and nondepletable energy source provisions of the energy subcode,
for one- and two-family homes (Uses Group R-3), and for light commercial
structures which have the indoor temperature controlled from a single
point, the fee shall be $353. For all other structures, the fee shall
be $1,766.
(5) For application for a variation in accordance with N.J.A.C. 5:23-2.10,
the fee shall be:
(a)
Class I structures: $708.
(b)
Class II and III structures: $155.
(6) For resubmission of an application for a variation:
(a)
Class I structures: $295.
(b)
Class II and III structures: $84.
(7) For cross connections and backflow preventers subject to testing
and which require reinspection every 12 months, the feel shall be:
(a)
For each device when tested annually: $59.
(b)
For each device when broken down tested annually: $26.
(8) For asbestos hazard abatement projects and the certificate of occupancy,
the fee shall be a flat fee schedule:
(a)
An administrative fee for each construction permit issued for
an asbestos hazard abatement project: $129.
(b)
An administrative fee for each certificate of occupancy issued
following the successful completion of an asbestos hazard abatement
project: $26.
G. Elevators.
(1) For witnessing acceptance tests and performing inspections, the fees
shall be:
(a)
For elevator devices in structures not in Use Groups R-3 or
R-4 or in an exempted Use Group R-2 structure, the fee shall be as
follows:
Structure
|
Fee
|
---|
Traction and winding drum elevator
|
|
One to 10 floors
|
$313
|
Over 10 floors
|
$522
|
Hydraulic elevators
|
$279
|
Roped hydraulic elevators
|
$313
|
Escalators, moving walks
|
$279
|
Dumbwaiters
|
$70
|
Stairway chairlifts, inclined and vertical wheelchair lifts
|
$70
|
(b)
For devices equipped with the following features, the additional
fees shall be as follows:
Feature
|
Fee
|
---|
Oil buffers, charge per oil buffer
|
$55
|
Counterweight governor and safeties
|
$139
|
Auxiliary power generator
|
$104
|
(c)
For elevator devices in structures in Use Group R-3 or Use Group
R-4: $209.
(d)
For witnessing acceptance tests of, and performing inspection
of, alterations: $70.
(2) For routine and periodic tests and inspections for elevator devices
in structures not in Use Groups R-3 or R-4 or otherwise exempt devices
in Use Groups R-2 structures, the fees shall be as follows:
(a)
For the six-month routine inspection of elevator devices the
fee shall be:
Device
|
Fee
|
---|
Traction and winding drum elevator
|
|
One to 10 floors
|
$195
|
Over 10 floors
|
$250
|
Hydraulic elevators
|
$137
|
Roped hydraulic elevators
|
$195
|
Escalators, moving walks
|
$195
|
(b)
For the one-year periodic inspection and witnessing of tests
of elevator devices, which shall include a six-month routine inspection,
the fee shall be:
Device
|
Fee
|
---|
Traction and winding drum elevator
|
|
One to 10 floors
|
$279
|
Over 10 floors
|
$384
|
Hydraulic elevators
|
$209
|
Dumbwaiters
|
$111
|
Manlifts, stairway chairlifts, inclined and vertical wheelchair
lifts
|
$168
|
(c)
For the yearly periodic inspection of elevator devices equipped
with the following features, the additional fees shall be:
Device
|
Fee
|
---|
Oil buffers, charge per oil buffer
|
$55
|
Counterweight governor and safeties
|
$111
|
Auxiliary power generator
|
$70
|
(d)
For the three-year or five-year inspection of elevator devices
the fee shall be as follows:
[1]
Traction and winding drum elevators, five-year inspection:
[2]
Hydraulic and roped hydraulic elevators:
[a] Three-year inspection: $345.
[b] Five-year inspection: $209.
(3) The fee for inspection of elevators used for construction shall be
as follows:
(a)
Witnessing acceptance and test:
[2]
Hydraulic elevators: $279.
(b)
Additional charges for devices equipped with the following features
shall be as follows:
[1]
Oil buffers, charge per oil buffer: $55.
(c)
The fee for the ninety-day inspection shall be as follows:
[2]
Hydraulic elevators: $139.
(d)
The fee for one-year periodic inspection and witnessing of test
shall be as follows:
[2]
Hydraulic elevators: $209.
(e)
The fee for the inspection and witnessing of the five-year test
shall be as follows:
[2]
Hydraulic elevators: $209.
(f)
Additional charges for elevators equipped with the following
features shall be as follows:
[1]
Oil buffers, charge per oil buffer: $55.
H. Solar panels.
(1) For solar panels from 1 kw to 10 kw: $125.
(2) For each additional 5 kw: $125.
(3) For each solar panel disconnect:
(5) For each inverter over 50 kw: $125.
(6) For each microinverter: $10.
I. Miscellaneous permit fees:
(1) Registration of contractors. The annual fee for registration of contractors
shall be $250.
(2) Fence construction. The fee for a permit to construct a fence shall
be $45 per $1,000 of estimated cost of the work. A plot plan, survey
and/or other documentation detailing the location of the fence shall
accompany all applications.
(3) Change of contractor. For each change of contractor, the fee shall
be $75.
(4) Annual pool inspection. The annual pool inspection fee shall be $150.
(5) Oil tank removal. The above-ground oil tank removal fee shall be
$129. The below ground oil tank removal fee shall be $181.
J. Surcharge to state, In order to provide for the training, certification
and technical support programs required by the Uniform Construction
Code Act and the applicable regulations, the City shall collect in
addition to the fees specified above, a surcharge fee of $0.00334
per cubic foot of volume of new construction and $0.00170 times the
estimated cost of construction for alterations. Such surcharge fee
shall be remitted to the Bureau of Construction Code Enforcement,
New Jersey Department of Community Affairs, on a quarterly basis for
the fiscal quarter ending September 30, December 31, March 31 and
June 30, and no later than one month next succeeding the end of the
quarter for which it is due.