Where a public sewer is not available, under the provisions of §
193-16, the building lateral shall be connected to a private wastewater disposal system complying with the provisions of the rules and regulations of the New York State Department of Health (NYSDOH), to be enforced by the Superintendent and/or the County Health Department.
No two separate permanent buildings, where the
intended use for either is for a distinct and separate business or
a dwelling place for a private family or families, shall be connected
to the same individual septic tank and tile absorption field.
A completed application form, containing results of percolation tests, computations and a plot plan, including the design and cross-section of the wastewater disposal system in relation to lot lines, adjacent and on-site well or water supply, and buildings, shall be submitted to the Village. A fee, established by Article
XIII, shall accompany the application. The wastewater disposal system shall be designed by a professional engineer and shall be in accordance with the NYSDOH Standards for Waste Treatment Works, or NYSDEC Standards for Commercial and Institutional Facilities, as appropriate.
A written construction permit shall be obtained
from the Superintendent before construction commencement. The Superintendent,
or his designated representative, shall be permitted to inspect the
construction work at any stage, without prior notice.
When the liquid or liquid-borne effluent from
a private wastewater disposal system enters any watercourse, ditch,
storm sewer or water supply system located in the Village, the owner
of the premises upon which such wastewater disposal system is located,
upon receiving written notice from the Superintendent to do so, shall
within 90 days after receipt of such notice repair, rebuild or relocate
such wastewater disposal system for the purpose of eliminating such
hazardous, offensive or objectionable conditions. The repair, rebuilding
or relocation of the system shall be accomplished in accordance with
the rules and regulations of the NYSDOH and the County Health Department,
at the owner's expense.
The owner shall operate and maintain the private
wastewater disposal system in a satisfactory manner at all times,
at the owner's expense.
Where a private wastewater disposal system utilizes
a cesspool or a septic tank, septage shall be removed from the cesspool
or septic tank, by a licensed hauler of trucked and hauled wastes,
at three-year intervals or more frequently.
At such time that a public sewer becomes available
to a property, a direct connection shall be made to the public sewer,
in compliance with this Part 2, and any cesspool, septic tank and
similar wastewater disposal facilities shall be cleaned of septage
by a licensed septage hauler and finally either filled with clean
sand, bank-run gravel or other inert material, or removed and properly
disposed. When the connection is made to the public sewer, the connection
to the private wastewater disposal facility shall be broken and both
ends of the break shall be plugged, as appropriate. Alternatively,
the septic tank effluent may be piped or pumped to the sewer; the
owner shall provide an easement to the septic tank for septage removal.
No statement in this article shall be construed
to prevent or interfere with any additional requirements that may
be deemed necessary by the Superintendent to protect public health
and public welfare.