The contractor shall construct a two-course bituminous
concrete pavement laid to conform to the required grade, thickness
and cross section shown on the plans and in the specifications. The
top course shall not be placed until construction has been substantially
completed as determined by the Town Highway Superintendent. No heavy
equipment shall be allowed to travel on the top course.