Inspection
|
Timing
|
Purpose
|
---|---|---|
One
|
Prepared site Open trenches
|
Correct materials Proper site preparation
|
Two
|
Installed drains, water mains, sewers and utilities
Open trenches
|
Correct installation of lines
|
Three
|
After compaction of roadway before paving
|
For correct placement of fill and compacting
|
Four
|
After street construction
|
For correct construction of pavement, curb,
and sidewalk
|
Five
|
After cleaning up
|
For installation of grass plots, street signs,
and for cleaning up
|