No unauthorized person shall uncover, make any connection with or openings into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Sewer Commission as explained in Article
VII; and such person shall make good any defects which may appear in any sewer, street, drain or work done by him and remunerate the commonwealth or town or any person for loss or damage occurring in consequence of any work done under any permit granted him.
All costs and expense incident to the installation
and connection of the building sewer shall be borne by the owners.
The owner shall indemnify the town from any loss or damage that may
directly or indirectly be occasioned by the installation of the building
sewer from the inside foundation wall to the public sewer.
A separate and independent building sewer shall
be provided for each building which connects to the public sewer.
The Sewer Commission may allow an exception to the requirement for
separate connections if, in its opinion, there is no alternative method
of making a connection from the building to the public sewer. Old
building sewers may be used in connection with new buildings only
when they are found, on examination and test by the Sewer Commission,
to meet all requirements of these rules and regulations.
All excavations in existing public ways shall
be subject to the requirements of the rules and regulations of the
Town of Barre Highway Department or the Commonwealth of Massachusetts
depending on the location of the work.
Any legal entity which desire to connect to
the public sewer from a property or properties which require approval
by the Planning Board or subdivision of the property shall be required
to execute a Tripartite Bond Agreement with the Board and an escrow
agent, who is approved by the Board. The Tripartite Bond Agreement
shall secure the performance of the developer's obligation to complete
the installation and testing of the sanitary sewers and appurtenances
and the restoration of all areas affected by the developer's operations.