[Adopted 8-20-1991 by Ord. No. 163]
The purpose of a model setback ordinance set out in this article is to increase public safety by requiring that new development be set back from pipeline locations.
This article applies to new residential and other development. It does not apply to development that has occurred or for which development permits have been issued before the effective date of this article.
Buildings and places of public assembly subject to this article shall not be constructed closer to the pipeline than the boundary of the pipeline easement.
Amended 7-20-2021 by Ord. No. 763]
Variance procedures adopted by the City of Isanti under Minn. Stat. §§ 462.351 to 462.365 shall apply.