An application to lay out and construct a Town highway may be filed by six or more resident freeholders of the Town. Said application must in writing and it may be delivered to any Supervisor or the Town Administrator. The application shall contain a complete description and a survey map of the property in question. New streets and roads in subdivisions and plats shall be constructed pursuant to Chapter
184, Land Division, of this Code.
Appeals from highway orders shall be pursuant
to § 82.15, Wis. Stats.
All expenses involved in the preparation, construction
and dedication involved in highway construction under this article
shall be borne by the applicant(s).
Prior to the design, preparation and construction
of any roadway to be dedicated to the Town of Cedarburg, the applicant
shall notify the Town Chairperson, Town Administrator or Clerk. Plans
must be provided in order for the Town Director of Public Works to
check the design and the drainage. Location of the roadway(s) shall
be in agreement with a preliminary plan or land use study approved
by the Town Plan Commission.
Upon completion of the proposed highway, the
Town Board may and the Town Director of Public Works will proceed
to make final inspection, accepting or rejecting the road as the case
may be. If the road is rejected, corrections shall be made as recommended
by Town Board before final inspection can then be made again. If final
acceptance is then made, the owner or owners shall turn over to the
Town the deed of all land necessary for the road as previously mentioned.