Exciting enhancements are coming soon to eCode360! Learn more 🡪
Green Lake County, WI
 
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
Unless specifically defined below, words and phrases used in this chapter shall have the same meaning as they have in common law and to give this chapter its most reasonable application. This section is intended to clarify word usage and not to establish standards for this chapter. Words used in the present tense include the future; the singular number includes the plural, and the plural number includes the singular. The word "may" is permissive, and the word "shall" is mandatory and not discretionary. For terms not found in this section, other sources may be utilized to establish an applicable definition. Certain words and phrases have different meanings when used in different ordinances. Refer to specific ordinances for word usage and definition.
ALTERNATIVE REQUIREMENT
An alternative to the reclamation standards of this chapter provided through a written authorization granted by Green Lake County.
APPLICABLE RECLAMATION ORDINANCE
A nonmetallic mining reclamation ordinance, including this chapter, that applies to a particular nonmetallic mining site and complies with the requirements of Ch. NR 135, Wis. Adm. Code, and Subchapter I of Ch. 295, Wis. Stats., unless the Wisconsin Department of Natural Resources is the regulatory authority. If the Wisconsin Department of Natural Resources is the regulatory authority, "applicable reclamation ordinance" means the relevant and applicable provisions of Ch. NR 135, Wis. Adm. Code.
BORROW SITE
An area outside of a transportation project site from which stone, soil, sand or gravel is excavated for use at the project site, except the term does not include commercial sources.
CONTEMPORANEOUS RECLAMATION
The sequential or progressive reclamation of portions of the nonmetallic mining site affected by mining operations that is performed in advance of final site reclamation, but which may or may not be final reclamation, performed to minimize the area exposed to erosion, at any one time, by nonmetallic mining activities.
DEPARTMENT
The Wisconsin Department of Natural Resources.
ENVIRONMENTAL POLLUTION
Has the meaning in § 295.11(2), Wis. Stats.
FINANCIAL ASSURANCE
A commitment of funds or resources by an operator to a regulatory authority that satisfies the requirements and is sufficient to pay for reclamation activities required by this chapter.
HIGHWALL
The vertical or nearly vertical face in solid rock or a slope of consolidated or unconsolidated material that exceeds 3:1.
LANDOWNER
The person who has title to land in fee simple or who holds a land contract for the land. A landowner is not a person who owns nonmetallic mineral rights to land, if a different person possesses title to that land in fee simple or holds a land contract for that land.
LICENSED PROFESSIONAL GEOLOGIST
An individual person who is licensed as a professional geologist pursuant to Ch. 470, Wis. Stats.
MUNICIPALITY
Any city, town or village.
NONMETALLIC MINERAL
A product, commodity or material consisting principally of naturally occurring, organic or inorganic, nonmetallic, nonrenewable material. Nonmetallic minerals include, but are not limited to, stone, sand, gravel, asbestos, beryl, diamond, clay, coal, feldspar, peat, talc and topsoil.
NONMETALLIC MINING OR MINING
All of following:
A. 
Operations or activities at a nonmetallic mining site for the extraction from the earth of mineral aggregates or nonmetallic minerals for sale or use by the operator. "Nonmetallic mining" includes use of mining equipment or techniques to remove materials from the in-place nonmetallic mineral deposit, including drilling and blasting, as well as associated activities such as excavation, grading and dredging. "Nonmetallic mining" does not include removal from the earth of products or commodities that contain only minor or incidental amounts of nonmetallic minerals, such as commercial sod, agricultural crops, ornamental or garden plants, forest products, Christmas trees or plant nursery stock.
B. 
Processes carried out at a nonmetallic mining site that are related to the preparation or processing of the mineral aggregates or nonmetallic minerals obtained from the nonmetallic mining site. These processes include, but are not limited to, the stockpiling of materials, blending mineral aggregates or nonmetallic minerals with other mineral aggregates or nonmetallic minerals, blasting, grading, crushing, screening, scalping and dewatering.
NONMETALLIC MINING RECLAMATION or RECLAMATION
The rehabilitation of a nonmetallic mining site to achieve a land use specified in a nonmetallic mining reclamation plan approved under this chapter, including removal or reuse of nonmetallic mining refuse, grading of the nonmetallic mining site, removal, storage and replacement of topsoil, stabilization of soil conditions, reestablishment of vegetative cover, control of surface water and groundwater, prevention of environmental pollution and, if practicable, the restoration of plant, fish and wildlife habitat.
NONMETALLIC MINING REFUSE
Waste soil, rock and mineral, as well as other natural site material resulting from nonmetallic mining. "Nonmetallic mining refuse" does not include marketable by-products resulting directly from or displaced by the nonmetallic mining that are scheduled to be removed from the nonmetallic mining site within a reasonable period of time after extraction.
NONMETALLIC MINING SITE or SITE
All contiguous areas of present or proposed mining described in Subsection A, subject to the qualifications in Subsection B:
A. 
"Nonmetallic mining site" means the following:
(1) 
The location where nonmetallic mining is proposed or conducted.
(2) 
Storage and processing areas that are in or contiguous to areas excavated for nonmetallic mining.
(3) 
Areas where nonmetallic mining refuse is deposited.
(4) 
Areas affected by activities such as the construction or improvement of private roads or haulage ways for nonmetallic mining.
(5) 
Areas where grading or regrading is necessary.
(6) 
Areas where nonmetallic mining reclamation activities are carried out or structures needed for nonmetallic mining reclamation, such as topsoil stockpile areas, revegetation test plots, or channels for surface water diversion, are located.
B. 
"Nonmetallic mining site" does not include any of the following areas:
(1) 
Those portions of sites listed in Subsection A not used for nonmetallic mining or purposes related to nonmetallic mining after August 1, 2001.
(2) 
Separate, previously mined areas that are not used for nonmetallic mineral extraction after August 1, 2001, and are not contiguous to mine sites, including separate areas that are connected to active mine sites by public or private roads.
(3) 
Areas previously mined but used after August 1, 2001, for a nonmining activity, such as stockpiles of materials used for an industrial process unrelated to nonmetallic mining.
OPERATOR
Any person who is engaged in, or who has applied for a permit to engage in, nonmetallic mining, whether individually, jointly or through subsidiaries, agents, employees, contractors or subcontractors.
PERSON
An individual, owner, operator, corporation, limited liability company, partnership, association, county, municipality, interstate agency, state agency or federal agency.
REGISTERED PROFESSIONAL ENGINEER
A person who is registered as a professional engineer pursuant to § 443.04, Wis. Stats.
REGULATORY AUTHORITY
One of the following:
A. 
A county in which the nonmetallic mining site is located, that has an applicable reclamation ordinance under § 295.13, Wis. Stats., except where a municipality has adopted an applicable reclamation ordinance pursuant to Subsection B below.
B. 
The municipality in which the nonmetallic mining site is located and which has adopted an applicable reclamation ordinance under § 295.14, Wis. Stats.
C. 
The Department, in cases where a county mining reclamation program is no longer in effect under § 295.14, Wis. Stats., but only if there is no applicable reclamation ordinance enacted by the municipality in which the nonmetallic mining site is located.
REPLACEMENT OF TOPSOIL
The replacement or redistribution of topsoil or topsoil substitute material to all areas where topsoil was actually removed or affected by nonmetallic mining for the purposes of providing adequate vegetative cover and stabilization of soil conditions needed to achieve the approved post-mining land use and as required by the reclamation plan approved pursuant to this chapter.
SOLID WASTE
Any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant or air pollution control facility and other discarded or salvageable materials, including solid, liquid, semisolid or contained gaseous materials resulting from industrial, commercial, mining and agricultural operations and from community activities, but does not include solids or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges which are point sources subject to permits under Ch. 283, Wis. Stats., or source material, special nuclear material or by-product material, as defined in § 254.31 (1), Wis. Stats.
TOPSOIL
The surface layer of soil which is generally more fertile than the underlying soil layers, which is the natural medium for plant growth and which can provide the plant growth, soil stability and other attributes necessary to meet the success standards approved in the reclamation plan.
TOPSOIL SUBSTITUTE MATERIAL
Soil or other unconsolidated material either used alone or mixed with other beneficial materials and which can provide the plant growth, site stability and other attributes necessary to meet the success standards approved in the reclamation plan.
UNRECLAIMED ACRE or UNRECLAIMED ACRES
A. 
Those unreclaimed areas in which nonmetallic mining has occurred after August 1, 2001, and areas where nonmetallic mining reclamation has been completed but is not yet certified as reclaimed under § 232-31. However the term does not include any areas described in Subsection B below.
B. 
"Unreclaimed acre" or "unreclaimed acres" does not include:
(1) 
Those areas where reclamation has been completed and certified as reclaimed under § 323-31.
(2) 
Those areas previously affected by nonmetallic mining but which are not used for nonmetallic mining after August 1, 2001.
(3) 
Those portions of nonmetallic mining sites which are included in a nonmetallic mining reclamation plan approved pursuant to this chapter but are not yet affected by nonmetallic mining.
(4) 
Areas previously mined but used after August 1, 2001, for nonmining activity, such as the stockpiling of materials used for an industrial activity such as an asphalt plant, concrete batch plant, block and tile operation or other industry that uses products produced from nonmetallic mining.
(5) 
For purposes of fees under § 323-29, those areas within a nonmetallic mining site which Green Lake County has determined to have been successfully reclaimed on an interim basis in accordance with § 323-31.