Skip to content
home Home
code Code
Code
law Laws (4)
New Laws (4)
Law Ledger (0)
help_center Help
Help
About Us
ecode
Login
City of Evanston, WY chevron_right chevron_right The Code chevron_right Chapter 7 Buildings chevron_right Part 7 Storm Water Runoff Control

Part 7 Storm Water Runoff Control

[Added by Ord. No. 82-116]
Article XIV Introduction
§ 7-94 Title.
§ 7-95 General purpose.
§ 7-96 Definitions.
§ 7-97 General requirements.
Article XV Review and Approval Procedures
§ 7-98 Control authority.
§ 7-99 Preliminary drainage plan.
§ 7-100 Final drainage plan.
§ 7-101 Record drawings.
Article XVI Hydrologic Design
§ 7-102 Hydrologic design—General.
§ 7-103 Major waterways.
§ 7-104 Minor waterways.
Article XVII General Hydraulic Design
§ 7-105 General hydraulic design— General.
§ 7-106 Closed conduit systems.
§ 7-107 Open channels.
§ 7-108 Channels and ditches.
§ 7-109 Bridges.
Article XVIII Maintenance of Facilities
§ 7-110 Maintenance.
Article XIX Storm Water Drainage Fees
§ 7-111 Plan review fee—Special building permits.
§ 7-112 Plan review fee—Land development.
§ 7-113 Drainage water fee.
§ 7-114 Drainage water fund.
Article XX Construction and Materials' Standards
§ 7-115 Construction requirements.
§ 7-116 Inspection requirements.
§ 7-117 Materials' standards.
Article XXI Bonds
§ 7-118 Liability insurance.
§ 7-119 Construction bond.
§ 7-120 Violations and penalties.
§ 7-121 Effective date.
By using eCode360 you agree to be legally bound by the Terms of Use and Privacy Policy.
eCode360: Get a Professional Subscription