Skip to content
home
Home
code
Code
Code
law
Laws (4)
New Laws (4)
Law Ledger (0)
help_center
Help
Help
About Us
ecode
search
Login
City of Evanston, WY
chevron_right
chevron_right
The Code
chevron_right
Chapter 7 Buildings
chevron_right
Part 7 Storm Water Runoff Control
Part 7
Storm Water Runoff Control
[Added by
Ord. No. 82-116
]
Article XIV
Introduction
§ 7-94
Title.
§ 7-95
General purpose.
§ 7-96
Definitions.
§ 7-97
General requirements.
Article XV
Review and Approval Procedures
§ 7-98
Control authority.
§ 7-99
Preliminary drainage plan.
§ 7-100
Final drainage plan.
§ 7-101
Record drawings.
Article XVI
Hydrologic Design
§ 7-102
Hydrologic design—General.
§ 7-103
Major waterways.
§ 7-104
Minor waterways.
Article XVII
General Hydraulic Design
§ 7-105
General hydraulic design— General.
§ 7-106
Closed conduit systems.
§ 7-107
Open channels.
§ 7-108
Channels and ditches.
§ 7-109
Bridges.
Article XVIII
Maintenance of Facilities
§ 7-110
Maintenance.
Article XIX
Storm Water Drainage Fees
§ 7-111
Plan review fee—Special building permits.
§ 7-112
Plan review fee—Land development.
§ 7-113
Drainage water fee.
§ 7-114
Drainage water fund.
Article XX
Construction and Materials' Standards
§ 7-115
Construction requirements.
§ 7-116
Inspection requirements.
§ 7-117
Materials' standards.
Article XXI
Bonds
§ 7-118
Liability insurance.
§ 7-119
Construction bond.
§ 7-120
Violations and penalties.
§ 7-121
Effective date.