home
Home
code
Code
Code
Index
law
Laws (10)
New Laws (10)
help_center
Help
Help
About Us
ecode
ecode
search
Login
City of Evanston, WY
chevron_right
2022-10-18
info
chevron_right
The Code
chevron_right
Chapter 7 Buildings
chevron_right
Part 7 Storm Water Runoff Control
The Code
Ch 1
General Provisions
Ch 2
Administration
Ch 3
(Reserved)
Ch 4
Alcoholic Beverages
Ch 5
Animals and Fowl
Ch 6
Bicycles
Ch 7
Buildings
Ch 7 Pt 7
Storm Water Runoff Control
Ch 7 Pt 7 Art XIV
Introduction
§ 7-94
Title.
§ 7-95
General purpose.
§ 7-96
Definitions.
§ 7-97
General requirements.
Ch 7 Pt 7 Art XV
Review and Approval Procedures
§ 7-98
Control authority.
§ 7-99
Preliminary drainage plan.
§ 7-100
Final drainage plan.
§ 7-101
Record drawings.
Ch 7 Pt 7 Art XVI
Hydrologic Design
§ 7-102
Hydrologic design—General.
§ 7-103
Major waterways.
§ 7-104
Minor waterways.
Ch 7 Pt 7 Art XVII
General Hydraulic Design
§ 7-105
General hydraulic design— General.
§ 7-106
Closed conduit systems.
§ 7-107
Open channels.
§ 7-108
Channels and ditches.
§ 7-109
Bridges.
Ch 7 Pt 7 Art XVIII
Maintenance of Facilities
§ 7-110
Maintenance.
Ch 7 Pt 7 Art XIX
Storm Water Drainage Fees
§ 7-111
Plan review fee—Special building permits.
§ 7-112
Plan review fee—Land development.
§ 7-113
Drainage water fee.
§ 7-114
Drainage water fund.
Ch 7 Pt 7 Art XX
Construction and Materials' Standards
§ 7-115
Construction requirements.
§ 7-116
Inspection requirements.
§ 7-117
Materials' standards.
Ch 7 Pt 7 Art XXI
Bonds
§ 7-118
Liability insurance.
§ 7-119
Construction bond.
§ 7-120
Violations and penalties.
§ 7-121
Effective date.
Ch 8
Cemeteries
Ch 9
Fire Prevention
Ch 10
Smoking in Public Places
Ch 11
Licenses Generally
Ch 12
Motor Vehicles and Traffic
Ch 13
Municipal Court
Ch 14
Nuisances Generally
Ch 15
Offenses—Miscellaneous
Ch 16
Oil and Gas Wells
Ch 17
Parks and Recreation
Ch 18
Police
Ch 19
(Reserved)
Ch 20
Solar Access
Ch 21
Streets and Sidewalks
Ch 22
Subdivision of Land
Ch 23
Utilities
Ch 24
Zoning
Ch 25
Taxicabs and Taxicab Drivers
Ch 26
(Reserved)
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Part 7
Storm Water Runoff Control
[Added by
Ord. No. 82-116
]
Article XIV
Introduction
chevron_right
§ 7-94
Title.
chevron_right
§ 7-95
General purpose.
chevron_right
§ 7-96
Definitions.
chevron_right
§ 7-97
General requirements.
chevron_right
Article XV
Review and Approval Procedures
chevron_right
§ 7-98
Control authority.
chevron_right
§ 7-99
Preliminary drainage plan.
chevron_right
§ 7-100
Final drainage plan.
chevron_right
§ 7-101
Record drawings.
chevron_right
Article XVI
Hydrologic Design
chevron_right
§ 7-102
Hydrologic design—General.
chevron_right
§ 7-103
Major waterways.
chevron_right
§ 7-104
Minor waterways.
chevron_right
Article XVII
General Hydraulic Design
chevron_right
§ 7-105
General hydraulic design— General.
chevron_right
§ 7-106
Closed conduit systems.
chevron_right
§ 7-107
Open channels.
chevron_right
§ 7-108
Channels and ditches.
chevron_right
§ 7-109
Bridges.
chevron_right
Article XVIII
Maintenance of Facilities
chevron_right
§ 7-110
Maintenance.
chevron_right
Article XIX
Storm Water Drainage Fees
chevron_right
§ 7-111
Plan review fee—Special building permits.
chevron_right
§ 7-112
Plan review fee—Land development.
chevron_right
§ 7-113
Drainage water fee.
chevron_right
§ 7-114
Drainage water fund.
chevron_right
Article XX
Construction and Materials' Standards
chevron_right
§ 7-115
Construction requirements.
chevron_right
§ 7-116
Inspection requirements.
chevron_right
§ 7-117
Materials' standards.
chevron_right
Article XXI
Bonds
chevron_right
§ 7-118
Liability insurance.
chevron_right
§ 7-119
Construction bond.
chevron_right
§ 7-120
Violations and penalties.
chevron_right
§ 7-121
Effective date.
chevron_right