No person shall develop any land for residential, commercial, industrial, or institutional uses without providing stormwater management measures that control or manage runoff from such developments, except as provided within this section. Stormwater management measures must be designed consistent with the Design Manual and constructed according to an approved plan for new development or the policies stated in §
213-9 of this chapter for redevelopment.
The City Engineer may grant a written variance from any requirement of Article
IV, Stormwater Management Criteria, if there are exceptional circumstances applicable to the site such that strict adherence will result in unnecessary hardship and not fulfill the intent of this chapter. A written request for variance shall be provided to the City Engineer and shall state the specific variances sought and reasons for their granting. The City Engineer shall not grant a variance unless and until sufficient justification is provided by the person developing land that the implementation of ESD to the MEP has been investigated thoroughly.