home
Home
code
Code
Code
Index
law
Laws (2)
New Laws (2)
pubdocs
Public Documents
Public Documents
Budgets (9)
Comprehensive Plans (2)
Minutes (1610)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Berne, NY
chevron_right
2023-04-12
info
chevron_right
Index: B
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
B
add
Batteries
157-16{20} — STORAGE BATTERY
Ch 158 — Small-Scale Battery Energy Storage Systems
§ 158-1 — Title.
§ 158-3 — Purpose.
158-4{2} — BATTERY
158-4{3} — BATTERY ENERGY STORAGE MANAGEMENT SYSTEM
158-4{4} — BATTERY ENERGY STORAGE SYSTEM
158-4{5} — COMMISSIONING
158-4{6} — DEDICATED-USE BUILDING
158-4{10} — FLOW BATTERY
158-4{11} — LEAD-ACID BATTERY
158-4{12} — LITHIUM-ION BATTERY
158-4{16} — NICKEL-BASED BATTERY
158-4{17} — NON-DEDICATED-USE BUILDING
158-4{21} — PARTICIPATING PROPERTY
158-4{22} — SMALL-SCALE BATTERY ENERGY STORAGE SYSTEM
§ 158-5 — Applicability.
§ 158-6 — General requirements.
§ 158-7 — Permitting requirements for Tier 1 battery energy storage systems.
§ 158-8 — Permitting requirements for Tier 2 battery energy storage systems.
§ 158-9 — Safety.
§ 158-10 — Permit time frame and abandonment.
§ 158-11 — Enforcement.
§ 164-4 — Prohibited disposal.
164-17{1} — BATTERIES, DRY-CELL
164-17{2} — BATTERIES, LEAD-ACID
164-17{15} — RECYCLABLE MATERIALS
190-75{15} — AUTOMOBILE SERVICE
§ DL-1 — Disposition of legislation.
add
Bed and breakfast
§ 190-19 — Signs.
190-75{19} — BED-AND-BREAKFAST
add
Bingo
Ch 83 — Bingo
§ 83-1 — Definitions.
§ 83-2 — License required.
§ 83-3 — Rental based on percentage of profits prohibited.
§ 83-4 — Lease by other than licensee prohibited.
§ 83-5 — Number of games per week limited.
§ 83-6 — Maximum rent.
§ 83-7 — Authorized games.
§ 83-12 — Identification cards.
§ 83-14 — Authority of Town Clerk; Sunday games.
add
Blasting
§ 190-8 — Prohibited uses.
add
Blocks
164-1{4} — CONSTRUCTION AND DEMOLITION DEBRIS
§ 170-1 — Declaration of policy.
170-2{19} — SUBDIVISION
§ 170-14 — Street layout.
§ 170-15 — Street design.
§ 170-17 — Lots.
§ 170-21 — Sketch plan.
§ 170-24 — Major subdivision final plat and accompanying data.
§ 171-8 — Sketch plan.
§ 171-9 — Preliminary plat.
187-20{23} — MEASUREMENT POINT (MP)
§ 190-17 — General provisions.
§ 190-22 — Traditional Neighborhood/Mixed Use Districts 1 and 2 design standards and guidelines.
§ 190-32 — Excavation for soil mining.
§ 190-38 — Mobile homes and house trailers.
§ 190-51 — Lot area.
§ 190-58 — Site plan approval.
add
Board of Appeals
Ch 3 — Alternate Board Members
Ch 3 Art I — Zoning Board of Appeals
3-1{1} — ALTERNATE MEMBER
3-1{2} — MEMBER
3-1{4} — ZONING BOARD OF APPEALS
§ 3-2 — Purpose; appointment, designation and term of office.
§ 16-9 — Additional powers and duties.
§ 109-19 — Appeals board.
§ 157-19 — Tier 3 permit and conformance provisions.
§ 157-21 — Application review process.
§ 157-23 — Tier 3 special use permit requirements.
§ 171-11 — Procedural waivers.
§ 190-17 — General provisions.
§ 190-18 — Off-street parking and loading regulations.
§ 190-20 — Industrial District regulations.
§ 190-21 — Historic Districts.
§ 190-22 — Traditional Neighborhood/Mixed Use Districts 1 and 2 design standards and guidelines.
§ 190-26 — Protection of agriculture from potentially incompatible uses.
§ 190-27 — Aircraft landing fields.
§ 190-32 — Excavation for soil mining.
§ 190-33 — Gasoline filling stations.
§ 190-38 — Mobile homes and house trailers.
§ 190-42 — Swimming pools.
§ 190-49 — Alterations.
§ 190-54 — Restoration.
Ch 190 Art IX — Zoning Board of Appeals
§ 190-60 — Establishment and duties.
§ 190-61 — Public notice and hearing.
§ 190-62 — Appeals.
§ 190-63 — Variances.
§ 190-64 — Special use permits.
§ 190-65 — Relief from decisions.
190-75{1} — ABANDONMENT
190-75{10} — AREA VARIANCE
190-75{154} — USE VARIANCE
§ DL-1 — Disposition of legislation.
add
Boats and Boating
§ 190-17 — General provisions.
§ 190-38 — Mobile homes and house trailers.
add
Bonds
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 79-5 — Conditions for issuance of permit.
§ 153-51 — Liability insurance coverage.
§ 153-57 — Final acceptance and warranty/surety.
§ 157-27 — Security.
§ 157-28 — Permit time frame and abandonment.
164-17{13} — PAPER
§ 170-6 — Preliminary plat for major subdivision.
§ 170-8 — Required improvements.
§ 170-14 — Street layout.
§ 187-26 — Roads and traffic.
§ 187-30 — General requirements.
§ 190-32 — Excavation for soil mining.
§ 190-33 — Gasoline filling stations.
add
Brush, grass and weeds
§ 135-6 — Preservation of plant life.
§ 135-15 — Traffic control.
§ 153-63 — General prohibitions.
157-16{11} — NATIVE PERENNIAL VEGETATION
§ 190-38 — Mobile homes and house trailers.
add
Buffers
157-16{14} — PROJECT SITE
§ 187-19 — Findings.
§ 190-20 — Industrial District regulations.
§ 190-22 — Traditional Neighborhood/Mixed Use Districts 1 and 2 design standards and guidelines.
§ 190-26 — Protection of agriculture from potentially incompatible uses.
§ 190-38 — Mobile homes and house trailers.
add
Building construction
Ch 87 — Building Code Administration
§ 87-3 — Code Enforcement Officer; inspectors.
Ch 91 — Buildings, Unsafe
Ch 109 — Flood Damage Prevention
add
Building Inspector
§ 22-4 — Responsibilities and functions.
§ 91-2 — Inspection and report of enforcement officer.
109-4B{24} — LOCAL ADMINISTRATOR
§ 153-4 — Building Inspector.
§ 153-5 — Applications.
§ 153-6 — Duties of Building Inspector.
§ 153-8 — Appeals.
§ 153-11 — Septic tanks.
§ 153-12 — Subsurface tile systems.
§ 153-13 — Seepage pits.
§ 153-15 — Watertight systems.
§ 153-16 — Construction.
§ 157-10 — Planning Board action on modified site plan.
§ 157-21 — Application review process.
§ 170-8 — Required improvements.
§ 170-11 — Applicability of Town Law § 278 (cluster developments).
§ 190-41 — Telecommunications towers.
add
Building permits
87-2{1} — BUILDING PERMIT
87-2{9} — PERMIT HOLDER
§ 87-3 — Code Enforcement Officer; inspectors.
§ 87-4 — Building permits.
§ 87-5 — Construction inspections.
§ 87-6 — Stop-work orders.
§ 87-7 — Certificates of occupancy/certificates of compliance.
§ 87-13 — Recordkeeping.
§ 87-15 — Enforcement; penalties for offenses.
§ 87-16 — Fees.
§ 153-2 — Building permit required.
§ 153-5 — Applications.
§ 153-6 — Duties of Building Inspector.
§ 153-8 — Appeals.
§ 153-28 — Approved wastewater disposal required for issuance of building permit.
§ 153-36 — Building permit application.
§ 157-10 — Planning Board action on modified site plan.
§ 157-19 — Tier 3 permit and conformance provisions.
§ 157-24 — Site plan approval.
§ 157-27 — Security.
§ 157-28 — Permit time frame and abandonment.
§ 158-6 — General requirements.
§ 158-10 — Permit time frame and abandonment.
187-20{7} — BUILDABLE LOT
187-20{30} — RESIDENCE
§ 187-26 — Roads and traffic.
§ 187-30 — General requirements.
§ 187-31 — Fees.
§ 190-17 — General provisions.
§ 190-18 — Off-street parking and loading regulations.
§ 190-21 — Historic Districts.
§ 190-41 — Telecommunications towers.
Ch 190 Art VIII — Building Permits, Site Plan Approval and Certificates of Occupancy
§ 190-57 — Building permit.
§ 190-59 — Certificate of occupancy.
add
Burning
§ 164-4 — Prohibited disposal.
190-75{16} — AUTO WRECKING YARD
190-75{50} — DUMP/LANDFILL
add
Business districts
§ 170-15 — Street design.