home
Home
code
Code
Code
Index
map
Zoning
Zoning
Zoning Map
law
Laws (5)
New Laws (5)
note
Notes (14)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of East Hempfield, PA
chevron_right
2023-06-07
info
chevron_right
Index: S
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
§ 1-7 — Interpretation of provisions.
§ 20-12 — Duties and responsibilities.
§ 82-3 — Powers.
§ 120-3 — Regulations.
§ 120-4 — Enforcement orders.
§ 136-2 — Legislative intent.
§ 150-1 — Purpose.
§ 170-1 — Findings; purpose.
§ 170-6 — Purpose.
170-7{9} — NOISE DISTURBANCE
§ 170-8 — Prohibited acts; violations.
§ 170-10 — Variances.
§ 180-8 — Background and purpose.
§ 180-19 — Guest parking permit.
§ 193-1 — Purposes.
§ 197-5 — Standards of service.
§ 200-11 — Declaration of purpose.
§ 200-33 — Declaration of nuisance.
§ 200-41 — Purpose.
§ 222-1.6 — Safety requirements.
§ 222-3.5 — Excavation specifications.
§ 222-5.5 — Pavement sections and widening.
§ 222-5.9 — Location restrictions for streets and driveways.
§ 222-5.11 — Driveway design standards.
§ 222-6.3 — Permittee responsibilities.
§ 222-6.5 — Work to conform to township standards.
§ 222-6.8 — Maintenance and protection of traffic.
§ 222-6.19 — Additional restrictions.
§ 222-7.10 — Appeals and requests for modifications.
§ 250-1 — Authority.
§ 250-2 — Intent.
§ 250-8 — Duties and responsibilities of Floodplain Administrator.
§ 250-31 — Special technical requirements.
§ 250-35 — Variance procedures and conditions.
250-37{22} — MINOR REPAIR
250-37{29} — REGULATORY FLOOD ELEVATION
250-37{36} — SUBSTANTIAL IMPROVEMENT
§ 260-2 — Statement of findings.
§ 260-3 — Purpose.
§ 260-10 — Township liability.
§ 260-11 — Duty of persons engaged in the development of land.
260-17{14} — CHAPTER 105
260-17{22} — DAM
260-17{33} — DRAINAGE EASEMENT
260-17{71} — MAXIMUM EXTENT PRACTICABLE (MEP)
260-17{72} — MEMORANDUM OF UNDERSTANDING
§ 260-18 — General requirements.
§ 260-24 — Stormwater management facility design standards.
§ 260-39 — Exemption from plan submission requirements.
§ 260-58 — Modification of ordinance provisions.
§ 265-1.2 — Purpose.
§ 265-1.3 — Community development goals and objectives.
§ 265-1.7 — Interpretation, conflict and severability.
§ 265-1.10 — Amendments.
265-2.2{48} — IMPROVEMENT, REQUIRED
265-2.2{87} — PUBLIC USE
§ 265-3.1 — Modifications.
§ 265-4.3 — Preliminary plans.
§ 265-7.1 — General.
§ 265-7.6 — Parks and open space.
§ 265-8.7 — Landscaping.
§ 265-8.8 — Lighting.
§ 270-1.2 — Purpose.
§ 270-1.3 — Community development goals and objectives.
§ 270-1.7 — Interpretation, conflict and severability.
§ 270-1.9 — Uses not provided for or uses prohibited.
270-2.2{51} — DWELLING UNIT TERMS AND PHRASES
270-2.2{103} — MINOR REPAIR
270-2.2{141} — PUBLIC USE
270-2.2{147} — REGULATORY FLOOD ELEVATION
270-2.2{180} — SUBSTANTIAL IMPROVEMENT
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.16 — Airport Hazard Area Overlay Zone (AHO).
§ 270-4.13 — Visual screening/landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-7.3 — General regulations.
§ 270-8.6 — On-site loading space requirements.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.3 — Permits.
add
Salaries and compensation
§ 1-4 — Legislation saved from repeal; matters not affected by repeal.
§ 30-5 — Manager's compensation.
37-2{3} — CONTRIBUTION
37-2{6} — PARTICIPANT
37-2{8} — SALARY
§ 37-4 — Retirement requirements and benefits.
37-13{3} — CONTRIBUTION
37-13{10} — PARTICIPANT
37-13{12} — SALARY
§ 37-15 — Retirement requirements and benefits.
§ 37-16 — Contributions.
§ 37-23 — Deferred retirement option plan (DROP).
237-28A{2} — COMPENSATION
§ 237-32 — Employer collection.
add
Sales
§ 1-4 — Legislation saved from repeal; matters not affected by repeal.
§ 37-4 — Retirement requirements and benefits.
§ 37-15 — Retirement requirements and benefits.
100-1{1} — ALARM AGENT
100-1{2} — ALARM BUSINESS
§ 106-1 — Application information.
120-2{1} — AGRICULTURAL
§ 170-8 — Prohibited acts; violations.
§ 183-3 — Regulations.
§ 193-4 — Reports by persons upon becoming landlords.
197-2A{9} — GROSS REVENUE
210-1A{10} — RECYCLING
210-14{27} — RECYCLING
§ 222-6.16 — Use of street right-of-way prohibited.
237-3{12} — VALUE
§ 237-7 — Excluded transactions.
§ 237-10 — Credits against tax.
§ 237-15 — Proceeds of judicial sale.
250-37{21} — MANUFACTURED HOME PARK OR SUBDIVISION
260-17{55} — HIGH TUNNEL
§ 265-4.4 — Final plans.
270-2.2{6} — ADULT BUSINESS
270-2.2{8} — AGRICULTURAL WHOLESALE OPERATION
270-2.2{9} — AGRITOURISM
270-2.2{18} — AUCTION, AUTOMOBILE
270-2.2{19} — AUCTION, RETAIL
270-2.2{20} — AUCTION, WHOLESALE
270-2.2{21} — BAR/TAVERN
270-2.2{27} — CAMPS and CAMPGROUNDS
270-2.2{39} — CONVENIENCE STORE
270-2.2{74} — HEAVY EQUIPMENT SALES, SERVICE AND REPAIR
270-2.2{86} — JUNKYARD
270-2.2{107} — MOTOR VEHICLE SALES, LEASING, AND SERVICE
270-2.2{113} — NIGHTCLUB
270-2.2{118} — OFFICE
270-2.2{128} — PERSONAL CARE SERVICES
270-2.2{150} — RETAIL FLOOR/SALES AREA
270-2.2{151} — RETAIL SALES AREA
270-2.2{152} — RETAIL SALES, SERVICE AND REPAIR
270-2.2{165} — SIGNS TERMS AND PHRASES
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-4.11 — Temporary use.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-8.5 — Uses of parking lots.
add
Sanitary facilities
200-1{15} — SANITARY FACILITIES
§ 200-2 — Required connections; prohibitions on disposition of wastes; right to refuse permission for connection.
§ 250-22 — Elevation and floodproofing requirements.
250-37{14} — FLOODPROOFING
265-2.2{86} — PUBLIC SEWER
270-2.2{63} — FLOODPROOFING
270-2.2{140} — PUBLIC SEWER
add
Sanitation
270-2.2{51} — DWELLING UNIT TERMS AND PHRASES
add
Schools
§ 8-2 — Execution of Articles of Incorporation.
§ 66-2 — Finances.
§ 66-4 — Facilities.
§ 66-5 — Terms of agreement.
§ 66-6 — Joinder of Hempfield School District.
§ 106-1 — Application information.
§ 136-4 — Unlawful conduct of minor.
§ 170-9 — Exceptions.
180-9{2} — RESIDENTIAL DISTRICT
§ 193-3 — Reports by landlords.
§ 193-4 — Reports by persons upon becoming landlords.
§ 193-5 — Reports of changes in use or occupancy.
§ 193-6 — Duties of the School District.
222-2.1B{34} — PUBLIC AGENCY
§ 222-5.10 — Driveway classifications.
§ 237-7 — Excluded transactions.
§ 237-20 — Imposition of tax; rate.
§ 237-21 — Exemption.
§ 237-32 — Employer collection.
§ 237-41 — Earned income tax credit.
§ 265-8.6 — Parking and loading facilities.
§ 265-8.8 — Lighting.
270-2.2{28} — CAMPUS
270-2.2{51} — DWELLING UNIT TERMS AND PHRASES
270-2.2{154} — SCHOOL
270-2.2{165} — SIGNS TERMS AND PHRASES
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.6 — Conditional uses.
add
Screens and screening
§ 250-22 — Elevation and floodproofing requirements.
§ 260-59 — References.
265-2.2{94} — SCREENING
§ 265-6.2 — Improvements required.
§ 265-8.6 — Parking and loading facilities.
§ 265-8.7 — Landscaping.
§ 265-8.8 — Lighting.
270-2.2{117} — NONCONFORMITY, DIMENSIONAL
270-2.2{196} — VISUAL SCREEN
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-4.3 — Business operation standards.
§ 270-4.4 — Dumpsters and waste products.
§ 270-4.7 — Outdoor storage.
§ 270-4.13 — Visual screening/landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.6 — Expansion or alteration of nonconforming use.
§ 270-7.3 — General regulations.
§ 270-7.4 — Specific regulations.
§ 270-9.3 — Permits.
add
Security standards
§ 12-1 — Background; agreement.
§ 16-6 — Investments.
§ 20-12 — Duties and responsibilities.
§ 30-6 — Powers and duties of Manager.
§ 37-4 — Retirement requirements and benefits.
§ 37-15 — Retirement requirements and benefits.
§ 37-16 — Contributions.
§ 100-9 — Confidentiality.
§ 150-1 — Purpose.
§ 180-14 — Permit issuance, application and fee.
§ 197-7 — Insurance; indemnification; bonds or other surety.
§ 200-2 — Required connections; prohibitions on disposition of wastes; right to refuse permission for connection.
§ 200-22 — Permit requirements for nonstandard OLDS.
§ 200-46 — Holding Tank agreement.
§ 210-30 — Authorization of Township.
§ 222-1.5 — Other requirements.
§ 222-3.7 — Fees and bonding.
§ 222-4.1 — General rule.
§ 222-5.17 — Auxiliary lanes.
§ 222-7.2 — Assurance for completion and maintenance of improvements.
§ 222-7.3 — Release of funds.
§ 222-7.9 — Scope of permit.
§ 222-7.10 — Appeals and requests for modifications.
237-3{3} — DOCUMENT
§ 237-7 — Excluded transactions.
§ 250-23 — Design and construction standards.
§ 260-8 — Compatibility with other requirements.
§ 260-12 — Financial security.
§ 260-37 — Certificate of completion.
§ 260-39 — Exemption from plan submission requirements.
§ 260-41 — Additional provisions for small projects.
§ 260-56 — Penalties.
§ 260-58 — Modification of ordinance provisions.
§ 265-1.2 — Purpose.
265-2.2{117} — SUBSTANTIALLY COMPLETED
§ 265-3.1 — Modifications.
§ 265-4.3 — Preliminary plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-6.2 — Improvements required.
§ 265-6.3 — Plan improvements.
§ 265-6.4 — Improvement construction guarantee.
§ 265-6.5 — Inspection of improvements.
§ 265-6.6 — Release of funds.
§ 265-6.7 — Dedication of improvements.
§ 265-6.8 — Maintenance guarantee.
§ 265-7.3 — Hillside development.
§ 265-7.6 — Parks and open space.
§ 265-8.8 — Lighting.
§ 270-1.2 — Purpose.
§ 270-1.7 — Interpretation, conflict and severability.
270-2.2{73} — HABITAT
270-2.2{156} — RETAINING WALL
270-2.2{181} — SUBSTANTIALLY COMPLETED
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-7.3 — General regulations.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.2 — Administration and enforcement; violations and penalties.
add
Septic systems
§ 200-20 — Permit required for all lots.
§ 270-4.5 — On-lot sewage disposal systems.
add
Septic tanks
200-1{16} — SANITARY SEWAGE
§ 200-2 — Required connections; prohibitions on disposition of wastes; right to refuse permission for connection.
§ 260-30 — Supplemental information.
add
Service stations
§ 222-5.10 — Driveway classifications.
add
Setbacks
265-2.2{64} — LOT WIDTH
265-2.2{96} — SETBACK LINE
§ 265-5.2 — Sketch plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-8.5 — Blocks and lots.
§ 265-8.10 — Easements.
270-2.2{97} — LOT TERMS AND PHRASES
270-2.2{117} — NONCONFORMITY, DIMENSIONAL
270-2.2{158} — SETBACK
270-2.2{159} — SETBACK LINE
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.13 — Recreation/Open Space Zone (ROS).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-4.2 — Height limit exceptions.
§ 270-4.6 — Operations and performance standards.
§ 270-4.7 — Outdoor storage.
§ 270-4.10 — Dimensional modifications.
§ 270-4.13 — Visual screening/landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.5 — Nonconforming lots.
§ 270-7.4 — Specific regulations.
§ 270-8.6 — On-site loading space requirements.
add
Sewage disposal, private
§ 250-23 — Design and construction standards.
add
Shade trees
265-2.2{55} — LANDSCAPING
§ 265-6.2 — Improvements required.
§ 265-8.7 — Landscaping.
270-2.2{91} — LANDSCAPING
§ 270-5.2 — Additional use regulations for specific uses.
add
Sheds
§ 250-13 — Start of construction.
250-37{32} — START OF CONSTRUCTION
265-2.2{114} — STRUCTURE
§ 265-8.6 — Parking and loading facilities.
270-2.2{161} — SHED
270-2.2{177} — STRUCTURE
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
270-2.2{200} — YARD WASTE COMPOSTING FACILITY
§ 270-5.2 — Additional use regulations for specific uses.
add
Shopping centers
§ 222-5.10 — Driveway classifications.
§ 265-8.8 — Lighting.
270-2.2{165} — SIGNS TERMS AND PHRASES
§ 270-5.2 — Additional use regulations for specific uses.
add
Shrubs
§ 183-3 — Regulations.
260-17{113} — RIPARIAN FOREST BUFFER
260-17{163} — WOODLAND
§ 260-23 — Riparian corridors.
265-2.2{6} — AGRICULTURAL LAND/AREAS
265-2.2{94} — SCREENING
§ 265-8.7 — Landscaping.
270-2.2{192} — VEGETATION
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
§ 270-4.10 — Dimensional modifications.
§ 270-4.13 — Visual screening/landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
add
Signs
§ 37-23 — Deferred retirement option plan (DROP).
§ 82-3 — Powers.
§ 100-3 — Applications for permits.
§ 130-1 — Adoption of codes.
§ 130-12 — Uniform code adopted.
§ 136-4 — Unlawful conduct of minor.
§ 170-8 — Prohibited acts; violations.
§ 180-2 — Violations.
§ 180-13 — Posting of permit area signs.
§ 180-21 — Withdrawal of permit area designation.
§ 180-23 — Violations and penalties.
§ 183-3 — Regulations.
§ 200-23 — Proper operation and maintenance of OLDS required.
§ 200-44 — Construction of Holding Tank.
222-2.1B{45} — TRAFFIC CONTROL DEVICE
§ 222-3.2 — Application procedures.
§ 222-4.3 — Application forms and required information.
§ 222-4.4 — Plan requirements.
§ 222-5.6 — Street intersections.
§ 222-5.9 — Location restrictions for streets and driveways.
§ 222-5.19 — Utilities, structures and other items in the right-of-way.
§ 222-6.8 — Maintenance and protection of traffic.
§ 222-6.9 — Traffic control devices.
§ 222-6.16 — Use of street right-of-way prohibited.
§ 222-6.20 — As-built plan.
§ 237-40 — Volunteer Service Credit Program.
§ 237-41 — Earned income tax credit.
§ 237-42 — Real property tax credit.
§ 250-12 — Placards.
§ 260-28 — SWM site plan information.
§ 260-43 — Responsibilities of developers and landowners.
§ 260-44 — Operation and maintenance agreements.
265-2.2{35} — ENVIRONMENTAL COVENANT
265-2.2{114} — STRUCTURE
§ 265-4.4 — Final plans.
§ 265-4.5 — Minor plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-6.3 — Plan improvements.
§ 265-6.9 — As-built plan.
§ 265-8.2 — Streets, access drives and driveways.
§ 265-8.7 — Landscaping.
§ 265-8.8 — Lighting.
§ 270-1.5 — Applicability.
270-2.2{115} — NONCONFORMING STRUCTURE
270-2.2{165} — SIGNS TERMS AND PHRASES
270-2.2{177} — STRUCTURE
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.13 — Recreation/Open Space Zone (ROS).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-4.11 — Temporary use.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.6 — Expansion or alteration of nonconforming use.
§ 270-6.9 — Previously expanded nonconforming uses and structures.
Ch 270 Art 7 — Sign Regulations
§ 270-7.1 — Introduction.
§ 270-7.2 — Sign area and height.
§ 270-7.3 — General regulations.
§ 270-7.4 — Specific regulations.
§ 270-7.5 — Permitting procedures and fees.
§ 270-7.6 — Nonconforming signs.
§ 270-7.7 — Order sign removal.
§ 270-9.3 — Permits.
§ 270-9.5 — Amendments.
add
Single-family dwellings
§ 222-5.10 — Driveway classifications.
265-2.2{30} — DRIVEWAY
270-2.2{49} — DRIVEWAY
270-2.2{51} — DWELLING UNIT TERMS AND PHRASES
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.13 — Recreation/Open Space Zone (ROS).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-5.2 — Additional use regulations for specific uses.
add
Site plan approval
§ 260-12 — Financial security.
§ 260-18 — General requirements.
§ 260-30 — Supplemental information.
§ 270-9.6 — Conditional uses.
add
Site plan review
§ 260-50 — Expenses covered by fees.
add
Site plans
§ 260-5 — Applicability.
§ 260-12 — Financial security.
§ 260-15 — Waivers.
§ 260-16 — Interpretation and word usage.
260-17{34} — DRAINAGE PERMIT
260-17{101} — RECORD PLAN
260-17{141} — STORMWATER MANAGEMENT SITE PLAN (SWM SITE PLAN)
260-17{150} — SWM SITE PLAN
§ 260-18 — General requirements.
§ 260-21 — Stormwater management performance standards.
§ 260-22 — Calculation methodology.
§ 260-24 — Stormwater management facility design standards.
Ch 260 Art IV — Information to Be Included on or with Stormwater Management Site Plans
§ 260-26 — General requirements.
§ 260-27 — Drafting standards.
§ 260-28 — SWM site plan information.
§ 260-30 — Supplemental information.
§ 260-32 — Stormwater management site plan submission.
§ 260-33 — Municipal review.
§ 260-34 — Revision of plans.
§ 260-36 — Authorization to construct and term of validity.
§ 260-38 — Record plans.
§ 260-39 — Exemption from plan submission requirements.
§ 260-50 — Expenses covered by fees.
§ 260-55 — Enforcement.
§ 265-4.2 — Sketch plans.
§ 265-4.3 — Preliminary plans.
§ 265-7.4 — Historic and cultural resources.
§ 270-3.1 — Introduction.
§ 270-3.11 — Campus Zone (C).
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-8.6 — On-site loading space requirements.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.6 — Conditional uses.
add
Skateboards
§ 183-3 — Regulations.
add
Sketch plans
222-2.1B{32} — PLANS
§ 260-40 — Small projects.
265-2.2{80} — PLAN
§ 265-3.1 — Modifications.
§ 265-4.1 — Overview of plan processing.
§ 265-4.2 — Sketch plans.
§ 265-4.3 — Preliminary plans.
§ 265-5.2 — Sketch plans.
§ 265-7.6 — Parks and open space.
§ 265-8.5 — Blocks and lots.
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.11 — Campus Zone (C).
add
Smoke
100-1{4} — AUTOMATIC PROTECTION DEVICE
§ 120-4 — Enforcement orders.
§ 183-3 — Regulations.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.7 — Substitution or replacement.
§ 270-7.3 — General regulations.
§ 270-9.3 — Permits.
add
Smoking
100-1{4} — AUTOMATIC PROTECTION DEVICE
§ 120-4 — Enforcement orders.
§ 183-3 — Regulations.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.7 — Substitution or replacement.
§ 270-7.3 — General regulations.
§ 270-9.3 — Permits.
add
Snow and ice removal
§ 222-5.2 — General arrangement.
§ 222-7.1 — Dedication.
add
Social security
§ 12-1 — Background; agreement.
§ 37-4 — Retirement requirements and benefits.
§ 37-15 — Retirement requirements and benefits.
§ 37-16 — Contributions.
add
Soil erosion and sediment control
260-17{72} — MEMORANDUM OF UNDERSTANDING
§ 265-8.7 — Landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
add
Solar collectors
§ 270-4.3 — Business operation standards.
add
Solar energy systems
270-2.2{12} — ALTERNATIVE ENERGY SYSTEMS SPECIFIC TERMS AND PHRASES
§ 270-5.2 — Additional use regulations for specific uses.
add
Special exceptions
§ 265-4.2 — Sketch plans.
§ 265-4.3 — Preliminary plans.
§ 265-4.4 — Final plans.
§ 265-4.5 — Minor plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-7.4 — Historic and cultural resources.
§ 265-8.1 — General.
§ 270-1.9 — Uses not provided for or uses prohibited.
270-2.2{168} — SPECIAL EXCEPTION
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.13 — Recreation/Open Space Zone (ROS).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-4.11 — Temporary use.
§ 270-5.1 — Application of use regulations.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-6.6 — Expansion or alteration of nonconforming use.
§ 270-6.7 — Substitution or replacement.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.2 — Administration and enforcement; violations and penalties.
§ 270-9.3 — Permits.
add
Special exception uses
§ 265-7.4 — Historic and cultural resources.
270-2.2{168} — SPECIAL EXCEPTION
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
add
Special permits
§ 200-5 — Special permit application for installation in developments.
Ch 250 Art VI — Activities Requiring Special Permits
§ 250-28 — General.
§ 250-29 — Application requirements for special permits.
§ 250-30 — Application review procedures.
§ 250-31 — Special technical requirements.
§ 250-35 — Variance procedures and conditions.
250-37{31} — SPECIAL PERMIT
270-2.2{169} — SPECIAL PERMIT
add
Special uses
Ch 270 Art 5 — Special Use Regulations
add
Speed limits
§ 82-3 — Powers.
§ 183-3 — Regulations.
§ 270-7.3 — General regulations.
add
Steep slopes
§ 260-24 — Stormwater management facility design standards.
§ 260-28 — SWM site plan information.
§ 270-5.2 — Additional use regulations for specific uses.
add
Stop work orders
§ 200-20 — Permit required for all lots.
add
Storage
§ 66-4 — Facilities.
§ 197-4 — Compliance; exemptions.
§ 210-4 — Regulations.
210-14{13} — EXISTING CONTRACT
210-14{16} — FACILITY
210-14{21} — MUNICIPALITY'S POLICIES AND PROCEDURES
210-14{30} — REFUSE CONTAINER
§ 210-20 — Approved haulers.
§ 210-24 — Existing contracts.
§ 222-5.11 — Driveway design standards.
§ 250-9 — Application procedures and requirements.
§ 250-22 — Elevation and floodproofing requirements.
§ 250-23 — Design and construction standards.
§ 250-24 — Development which may endanger human life.
250-37{7} — DEVELOPMENT
250-37{19} — LOWEST FLOOR
250-37{33} — STRUCTURE
260-17{46} — FLOODPLAIN
260-17{55} — HIGH TUNNEL
260-17{90} — PARKING LOT STORAGE
260-17{131} — STORAGE
260-17{132} — STORAGE INDICATION METHOD
§ 260-18 — General requirements.
§ 260-19 — Volume controls.
§ 260-20 — Rate controls.
§ 260-24 — Stormwater management facility design standards.
§ 260-28 — SWM site plan information.
§ 260-46 — Maintenance of facilities accepted by the Township.
265-2.2{114} — STRUCTURE
§ 265-7.2 — Environmental impact study.
§ 265-8.7 — Landscaping.
§ 270-1.10 — Agricultural provisions and Pennsylvania law.
270-2.2{10} — AIRPORT HAZARD AREA OVERLAY (AHO) ZONE TERMS AND PHRASES
270-2.2{12} — ALTERNATIVE ENERGY SYSTEMS SPECIFIC TERMS AND PHRASES
270-2.2{38} — CONTRACTOR BUSINESS AND STORAGE
270-2.2{46} — DEVELOPMENT
270-2.2{56} — FARM
270-2.2{76} — HELICOPTER PAD
270-2.2{86} — JUNKYARD
270-2.2{98} — LOWEST FLOOR
270-2.2{102} — MINERAL EXTRACTION
270-2.2{108} — MOTOR VEHICLE STORAGE
270-2.2{118} — OFFICE
270-2.2{157} — SELF-STORAGE FACILITY
270-2.2{161} — SHED
270-2.2{177} — STRUCTURE
270-2.2{197} — WIRELESS FACILITIES DEFINITIONS AND PHRASES
§ 270-3.2 — Agriculture Zone (A).
§ 270-3.3 — Rural Business Zone (RB).
§ 270-3.4 — Mineral Extraction Zone (ME).
§ 270-3.5 — Low-Density Residential Zone (RL).
§ 270-3.6 — Medium-Density Residential Zone (RM).
§ 270-3.7 — Village Residential Zone (VR).
§ 270-3.8 — Village Center Zone (VC).
§ 270-3.9 — Community Business Center Zone (CBC).
§ 270-3.10 — Regional Commerce Center Zone (RCC).
§ 270-3.11 — Campus Zone (C).
§ 270-3.12 — Enterprise Zone (E).
§ 270-3.13 — Recreation/Open Space Zone (ROS).
§ 270-3.14 — Agriculture Holding Zone (AH).
§ 270-4.2 — Height limit exceptions.
§ 270-4.3 — Business operation standards.
§ 270-4.7 — Outdoor storage.
§ 270-4.13 — Visual screening/landscaping.
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-8.5 — Uses of parking lots.
add
Stormwater
Ch 200 — Sewers and Sewage Disposal
200-1{16} — SANITARY SEWAGE
200-1{17} — SANITARY SEWER
200-1{22} — STORM SEWER or STORM DRAIN
§ 200-6 — Restrictions on use of sewer system.
§ 200-23 — Proper operation and maintenance of OLDS required.
Ch 222 — Streets and Sidewalks
§ 222-1.3 — Purpose.
§ 222-1.7 — Compatibility with other requirements.
§ 222-1.8 — Permit required prior to initiation of construction.
§ 222-5.1 — Streets.
§ 222-5.5 — Pavement sections and widening.
§ 222-5.14 — Driveway grade.
§ 222-6.3 — Permittee responsibilities.
§ 222-6.7 — Drainage control plan.
§ 222-6.20 — As-built plan.
§ 222-7.1 — Dedication.
§ 222-7.2 — Assurance for completion and maintenance of improvements.
§ 222-7.12 — Inconsistent regulations.
Ch 250 — Floodplain Management
§ 250-23 — Design and construction standards.
Ch 260 — Stormwater Management
§ 260-1 — Short title.
§ 260-2 — Statement of findings.
§ 260-3 — Purpose.
§ 260-4 — Statutory authority.
§ 260-5 — Applicability.
§ 260-6 — Repealer.
§ 260-10 — Township liability.
§ 260-11 — Duty of persons engaged in the development of land.
§ 260-12 — Financial security.
§ 260-14 — Reduction of pollutants in stormwater.
§ 260-15 — Waivers.
260-17{3} — ACT 167 PLAN
260-17{8} — BMP (BEST MANAGEMENT PRACTICE)
260-17{9} — BMP MANUAL
260-17{26} — DETENTION BASIN
260-17{32} — DRAINAGE CONVEYANCE FACILITY
260-17{33} — DRAINAGE EASEMENT
260-17{34} — DRAINAGE PERMIT
260-17{58} — IMPOUNDMENT
260-17{72} — MEMORANDUM OF UNDERSTANDING
260-17{74} — MUNICIPAL SEPARATE STORM SEWER
260-17{81} — NONSTRUCTURAL BMPs
260-17{84} — OPEN CHANNEL
260-17{91} — PEAK DISCHARGE
260-17{93} — PIPE
260-17{95} — PLANS
260-17{101} — RECORD PLAN
260-17{103} — REGIONAL STORMWATER MANAGEMENT PLAN
260-17{104} — REGULATED ACTIVITIES
260-17{107} — RETENTION BASIN
260-17{115} — ROOFTOP DETENTION
260-17{118} — SEDIMENT
260-17{131} — STORAGE
260-17{135} — STORM SEWER
260-17{136} — STORMWATER
260-17{137} — STORMWATER MANAGEMENT ACT
260-17{138} — STORMWATER MANAGEMENT BEST MANAGEMENT PRACTICES (SWM BMP)
260-17{139} — STORMWATER MANAGEMENT FACILITY (SWM FACILITY)
260-17{140} — STORMWATER MANAGEMENT OPERATION AND MAINTENANCE PLAN (O&M PLAN)
260-17{141} — STORMWATER MANAGEMENT SITE PLAN (SWM SITE PLAN)
260-17{144} — STRUCTURAL BMPs
260-17{147} — SUBWATERSHED AREA
260-17{149} — SWM
260-17{150} — SWM SITE PLAN
260-17{156} — TREATMENT TRAIN
Ch 260 Art III — Design Criteria for Stormwater Management Facilities
§ 260-18 — General requirements.
§ 260-21 — Stormwater management performance standards.
§ 260-22 — Calculation methodology.
§ 260-24 — Stormwater management facility design standards.
Ch 260 Art IV — Information to Be Included on or with Stormwater Management Site Plans
§ 260-26 — General requirements.
§ 260-28 — SWM site plan information.
§ 260-29 — Additional information.
§ 260-30 — Supplemental information.
§ 260-31 — Pre-application meeting.
§ 260-32 — Stormwater management site plan submission.
§ 260-35 — Pre-construction meeting and plan recordation.
§ 260-37 — Certificate of completion.
§ 260-38 — Record plans.
§ 260-39 — Exemption from plan submission requirements.
§ 260-40 — Small projects.
§ 260-41 — Additional provisions for small projects.
§ 260-42 — Development sites containing agricultural activities with conservation plan.
§ 260-43 — Responsibilities of developers and landowners.
§ 260-45 — Operation and maintenance (O&M) plan contents.
§ 260-46 — Maintenance of facilities accepted by the Township.
§ 260-48 — O&M verification forms.
§ 260-50 — Expenses covered by fees.
§ 260-51 — Prohibited discharges and connections.
§ 260-56 — Penalties.
§ 260-59 — References.
Ch 265 — Subdivision and Land Development
§ 265-1.2 — Purpose.
§ 265-1.5 — Applicability.
265-2.2{26} — DETENTION BASIN
265-2.2{90} — RETENTION BASIN
265-2.2{102} — STORMWATER
265-2.2{103} — STORMWATER MANAGEMENT FACILITIES
§ 265-4.3 — Preliminary plans.
§ 265-4.4 — Final plans.
§ 265-4.5 — Minor plans.
§ 265-5.2 — Sketch plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-6.2 — Improvements required.
§ 265-6.9 — As-built plan.
§ 265-7.3 — Hillside development.
§ 265-7.5 — Hydrogeologic study.
§ 265-7.6 — Parks and open space.
§ 265-8.1 — General.
§ 265-8.7 — Landscaping.
§ 265-8.10 — Easements.
§ 265-8.14 — Stormwater management facilities.
§ 265-8.15 — Hazards associated with carbonate rocks.
Ch 270 — Zoning
§ 270-1.2 — Purpose.
270-2.2{160} — SHARED FACILITY
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-7.3 — General regulations.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ 270-9.3 — Permits.
§ DL-1 — Disposition of legislation.
add
Stormwater control
§ 260-2 — Statement of findings.
§ 260-18 — General requirements.
add
Stormwater management
Ch 200 — Sewers and Sewage Disposal
Ch 222 — Streets and Sidewalks
§ 222-1.3 — Purpose.
§ 222-1.7 — Compatibility with other requirements.
§ 222-1.8 — Permit required prior to initiation of construction.
§ 222-5.1 — Streets.
§ 222-5.5 — Pavement sections and widening.
§ 222-5.14 — Driveway grade.
§ 222-6.3 — Permittee responsibilities.
§ 222-6.7 — Drainage control plan.
§ 222-6.20 — As-built plan.
§ 222-7.1 — Dedication.
§ 222-7.2 — Assurance for completion and maintenance of improvements.
§ 222-7.12 — Inconsistent regulations.
Ch 250 — Floodplain Management
Ch 260 — Stormwater Management
§ 260-1 — Short title.
§ 260-3 — Purpose.
§ 260-5 — Applicability.
§ 260-15 — Waivers.
260-17{3} — ACT 167 PLAN
260-17{32} — DRAINAGE CONVEYANCE FACILITY
260-17{33} — DRAINAGE EASEMENT
260-17{34} — DRAINAGE PERMIT
260-17{95} — PLANS
260-17{101} — RECORD PLAN
260-17{103} — REGIONAL STORMWATER MANAGEMENT PLAN
260-17{104} — REGULATED ACTIVITIES
260-17{137} — STORMWATER MANAGEMENT ACT
260-17{138} — STORMWATER MANAGEMENT BEST MANAGEMENT PRACTICES (SWM BMP)
260-17{139} — STORMWATER MANAGEMENT FACILITY (SWM FACILITY)
260-17{140} — STORMWATER MANAGEMENT OPERATION AND MAINTENANCE PLAN (O&M PLAN)
260-17{141} — STORMWATER MANAGEMENT SITE PLAN (SWM SITE PLAN)
260-17{147} — SUBWATERSHED AREA
260-17{149} — SWM
260-17{150} — SWM SITE PLAN
Ch 260 Art III — Design Criteria for Stormwater Management Facilities
§ 260-18 — General requirements.
§ 260-21 — Stormwater management performance standards.
§ 260-22 — Calculation methodology.
§ 260-24 — Stormwater management facility design standards.
Ch 260 Art IV — Information to Be Included on or with Stormwater Management Site Plans
§ 260-26 — General requirements.
§ 260-28 — SWM site plan information.
§ 260-29 — Additional information.
§ 260-30 — Supplemental information.
§ 260-31 — Pre-application meeting.
§ 260-32 — Stormwater management site plan submission.
§ 260-35 — Pre-construction meeting and plan recordation.
§ 260-37 — Certificate of completion.
§ 260-38 — Record plans.
§ 260-39 — Exemption from plan submission requirements.
§ 260-40 — Small projects.
§ 260-41 — Additional provisions for small projects.
§ 260-43 — Responsibilities of developers and landowners.
§ 260-45 — Operation and maintenance (O&M) plan contents.
§ 260-48 — O&M verification forms.
§ 260-56 — Penalties.
Ch 265 — Subdivision and Land Development
§ 265-1.5 — Applicability.
265-2.2{103} — STORMWATER MANAGEMENT FACILITIES
§ 265-4.3 — Preliminary plans.
§ 265-4.4 — Final plans.
§ 265-4.5 — Minor plans.
§ 265-5.3 — Preliminary plans.
§ 265-5.4 — Final plans.
§ 265-5.5 — Minor plans.
§ 265-6.9 — As-built plan.
§ 265-7.3 — Hillside development.
§ 265-7.6 — Parks and open space.
§ 265-8.1 — General.
§ 265-8.7 — Landscaping.
§ 265-8.10 — Easements.
§ 265-8.14 — Stormwater management facilities.
§ 265-8.15 — Hazards associated with carbonate rocks.
Ch 270 — Zoning
§ 270-5.2 — Additional use regulations for specific uses.
§ 270-9.1 — Zoning Hearing Board (ZHB).
§ DL-1 — Disposition of legislation.
add
Streetlighting
§ 270-5.2 — Additional use regulations for specific uses.
add
Street openings
§ 200-3 — Permits to make connections.
Ch 222 Art III — Permit Procedures for Street Opening and Excavation
§ 222-3.3 — Permit exemptions.
§ 222-3.4 — Emergency excavations.
§ 222-3.5 — Excavation specifications.
§ 222-3.6 — Moratorium on street openings.
§ 222-3.7 — Fees and bonding.
add
Swimming pools
§ 130-1 — Adoption of codes.
§ 130-12 — Uniform code adopted.
183-2{2} — PARK
§ 183-3 — Regulations.
§ 260-51 — Prohibited discharges and connections.
265-2.2{114} — STRUCTURE
270-2.2{177} — STRUCTURE
§ 270-5.2 — Additional use regulations for specific uses.