home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Elma, NY
chevron_right
2023-02-22
info
chevron_right
Index: L
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
L
add
Landfills
50-3B{33} — SOLID WASTE MANAGEMENT FACILITY
50-3B{41} — WASTE-TO-ENERGY FACILITY
§ 144-89 — Prohibited and permitted uses.
add
Landlords
§ 118-2 — Findings; legislative intent.
§ 118-3 — Purpose.
118-4{9} — RESPONSIBLE PERSON
add
Landscape plans
§ 59A-4 — Tower special use permits application materials.
§ 117-3 — Application for preliminary site plan approval.
§ 123-21 — Major subdivision final plat.
§ 144-90 — District regulations.
§ 144-93.8 — Submission requirements.
§ 144-142.6 — Submission requirements.
§ 144-142.13 — Submission requirements.
§ 144-142.20 — Submission requirements.
§ 144-142.27 — Submission requirements.
add
Landscaping
§ 50-8 — Town Board action.
§ 59A-4 — Tower special use permits application materials.
§ 59A-5 — Communications facility standards.
§ 97-11 — Landscaping.
§ 115-167 — Discharge prohibitions.
§ 117-3 — Application for preliminary site plan approval.
§ 117-4 — Planning Board review of preliminary site plan.
§ 118A-10 — Large utility-scale solar energy systems.
119-3{39} — YARD WASTE
120-1{17} — LICENSED PROFESSIONAL
§ 120-3 — General provisions.
§ 120-8 — Administration and enforcement; penalties for offenses.
§ 123-17 — Design standards.
§ 123-20 — Major subdivision preliminary plat.
§ 123-21 — Major subdivision final plat.
§ 144-23 — Cemeteries.
§ 144-79 — Design standards.
§ 144-80 — Maintenance bond as condition of site plan approval.
§ 144-86.3 — Design standards.
§ 144-86.4 — Maintenance bond as condition of site plan approval.
§ 144-86.13 — Design standards.
§ 144-86.14 — Maintenance bond as condition of site plan approval.
§ 144-88 — Purpose; intent.
§ 144-90 — District regulations.
§ 144-93 — Site plan review; enforcement; compliance.
§ 144-93.5 — Objectives.
§ 144-93.8 — Submission requirements.
§ 144-93.9 — Design standards.
§ 144-135 — Special use permits.
§ 144-142 — Guidelines to be considered.
§ 144-142.4 — Objectives.
§ 144-142.6 — Submission requirements.
§ 144-142.7 — Other zoning requirements and design standards.
§ 144-142.11 — Objectives.
§ 144-142.13 — Submission requirements.
§ 144-142.14 — Other zoning requirements and design standards.
§ 144-142.18 — Objectives.
§ 144-142.20 — Submission requirements.
§ 144-142.21 — Other zoning requirements and design standards.
§ 144-142.25 — Objectives.
§ 144-142.27 — Submission requirements.
§ 144-142.28 — Other zoning requirements and design standards.
add
Leashing
65-4{1} — AT LARGE
§ 65-5 — Restrictions.
add
Liability
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 50-9 — Bonds and insurance.
§ 50-12 — Penalties for offenses.
52-27A{5} — RESPONSIBLE PROFESSIONAL ENGINEER
§ 52-31 — Remedies; appearance tickets; penalties for offenses; injunctive relief.
§ 65-11 — Liability of Town officials.
§ 75-6 — Bond or deposit required; certificate of completion.
§ 82-10 — Warning and disclaimer of liability.
§ 87-12 — Penalties for offenses.
§ 105-3 — Registration and permit requirements.
§ 115-46 — Liability insurance coverage during construction period.
§ 115-66 — Building lateral/street lateral connection.
§ 115-74 — Costs borne by owner.
§ 115-119 — Liability of property owner.
§ 115-122 — Notification of violation.
§ 115-133 — Civil actions for penalties.
§ 115-134 — Court orders.
§ 115-137 — Summary abatement.
§ 115-140 — Liability insurance.
Ch 118 — Social Host Liability
§ 118-1 — Title.
§ 118-2 — Findings; legislative intent.
118-4{9} — RESPONSIBLE PERSON
§ 118-6 — Recovery of response costs.
§ 118-7 — Billing and collection.
§ 118A-3 — Applicability.
§ 119-12 — Authorized collectors; license required.
§ 120-8 — Administration and enforcement; penalties for offenses.
§ 123-9 — Major subdivision final plat.
§ 123-14 — General liability insurance.
§ 140-32 — Water used for construction purposes.
§ 140-46 — Responsibility for certain types of damage.
§ 144-89 — Prohibited and permitted uses.
§ 144-154 — Penalties for offenses.
§ DL-1 — Disposition of legislation.
add
Libraries
§ 116-3 — Residency restrictions.
§ 144-21 — Public buildings and utilities.
§ 144-38 — Places of assembly.
§ 144-58 — Permitted and prohibited uses.
§ 144-86.8 — Permitted uses.
add
Library
§ 116-3 — Residency restrictions.
§ 144-21 — Public buildings and utilities.
§ 144-38 — Places of assembly.
§ 144-58 — Permitted and prohibited uses.
§ 144-86.8 — Permitted uses.
add
Licenses and permits
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 7-8 — Compensation; expenses.
§ 10-4 — Filing of claims.
§ 27-1 — Policy.
§ 34-2 — Designation of records access officer; powers and duties.
§ 34-6 — Request for records.
42-2{7} — MASSAGE ESTABLISHMENT
§ 42-3 — Restrictions.
§ 42-4 — Licensing and registration.
§ 43-12 — Penalties for offenses.
§ 48-1 — Authorization for conduct of bingo.
§ 48-2 — Restrictions on conduct of bingo.
§ 48-3 — Investigation of applicants.
§ 48-4 — Issuance of license; fee.
§ 48-5 — Transmittal of certain fees to state.
§ 50-2 — Legislative findings and purposes.
50-3B{3} — AGRICULTURE
50-3B{8} — CERTIFIED APPRAISAL
50-3B{20} — LAND APPLICATION FACILITY
50-3B{30} — SITING AND OPERATING PERMIT
§ 50-5 — Permit requirements; exemptions.
§ 50-6 — Permit application procedures.
§ 50-7 — Permit application contents and permitting fees.
§ 50-8 — Town Board action.
§ 50-9 — Bonds and insurance.
§ 50-10 — Reissuance of permits or extension of facilities.
§ 50-11 — Modification, suspension and revocation of permit.
§ 50-12 — Penalties for offenses.
§ 50-13 — Agent for the Town.
§ 50-14 — Regulations.
§ 50-15 — Special conditions.
§ 52-3 — Building permit fees.
§ 52-4 — Recreation filing fee.
§ 52-5 — Issuance of building permits.
§ 52-6 — Appeal upon denial of permit; fee.
§ 52-9 — Penalties for offenses.
§ 52-11 — Use of spruce in construction.
§ 52-13 — Use of wood foundations.
52-16{2} — BUILDING PERMIT
52-16{14} — OPERATING PERMIT
52-16{16} — PERMIT HOLDER
§ 52-17 — Code Enforcement Officer and inspectors.
§ 52-18 — Building permits.
§ 52-19 — Construction inspections.
§ 52-20 — Stop-work orders.
§ 52-21 — Certificates of occupancy and certificates of compliance.
§ 52-24 — Operating permits.
§ 52-25 — Fire safety and property maintenance inspections.
§ 52-27 — Condition assessments of parking garages.
52-27A{4} — PROFESSIONAL ENGINEER
52-27A{5} — RESPONSIBLE PROFESSIONAL ENGINEER
§ 52-29 — Recordkeeping.
§ 52-30 — Program review and reporting.
§ 52-31 — Remedies; appearance tickets; penalties for offenses; injunctive relief.
§ 52-32 — Fees.
§ 56-7 — Hearing findings.
§ 57-2 — Statutory authority.
§ 59-3 — Shop requirements.
§ 59-7 — Application for permit.
§ 59-8 — Penalties for offenses.
§ 59A-3 — Building permit required; location categories.
§ 59A-4 — Tower special use permits application materials.
§ 59A-5 — Communications facility standards.
§ 59A-7 — Miscellaneous.
§ 59A-8 — Guidelines.
§ 59A-9 — Procedures.
59B-2A{6} — HAZARDOUS FACILITY
§ 59B-3 — Requirements.
§ 60-2 — Dealers.
§ 60-3 — Lots.
§ 60-4 — Compliance required; violations; revocation of permit.
§ 60-7 — Permitted areas.
§ 60-9 — Application; fee; review; determination.
Ch 65 Art I — Dog Licensing
§ 65-1 — Title.
§ 65-2 — Licensing of dogs.
65-4{3} — OWNER
§ 65-5 — Restrictions.
§ 65-7 — Duties of Dog Control Officer; impoundment.
§ 65-9 — Enforcement; right of entry.
§ 65-10 — Penalties for offenses.
§ 65-11 — Liability of Town officials.
§ 68-2 — Use of Town dumps.
§ 68-3 — Hours for dumping; posting.
§ 68-4 — Dumping of certain materials prohibited.
§ 68-7 — Penalties for offenses.
§ 68-8 — Commercial dumping prohibited.
§ 73-1 — License required for live music.
§ 73-2 — Application for license; determination by Town Board.
§ 73-3 — Suspension, revocation, renewal or refusal of license.
§ 73-4 — Fee; term of license; renewal.
§ 75-2 — Compliance with standards required; exceptions.
§ 75-3 — Permit required; application.
§ 75-4 — Sand bank and gravel pits and pit excavations.
§ 75-6 — Bond or deposit required; certificate of completion.
§ 75-7 — Permits; fees.
§ 75-8 — Exemptions from provisions.
§ 75-10 — Penalties for offenses.
§ 77-1 — Drainage plan required.
82-4{25} — LOCAL ADMINISTRATOR
82-4{36} — START OF CONSTRUCTION
82-4{40} — VARIANCE
§ 82-9 — Penalties for noncompliance.
§ 82-10 — Warning and disclaimer of liability.
§ 82-11 — Designation of Local Administrator.
§ 82-12 — Floodplain development permit.
§ 82-13 — Application for permit.
§ 82-14 — Duties and responsibilities of Local Administrator.
§ 82-15 — General standards.
§ 82-16 — Standards for all structures.
§ 82-18 — Nonresidential structures.
§ 82-19 — Manufactured homes and recreational vehicles.
§ 86-2 — Games of chance authorized; license required.
§ 86-5 — Supervision of games.
§ 87-3 — Designation of landmarks or historic districts.
§ 87-6 — Certificate of appropriateness application procedure.
§ 87-9 — Hardship application procedure.
§ 87-11 — Maintenance and repair required.
§ 87-12 — Penalties for offenses.
§ 97-4 — Applicability.
§ 97-8 — General site improvement requirements.
§ 97-9 — Recreation areas.
§ 97-13 — Water supply.
§ 97-16 — Community service facilities.
§ 97-21 — Alterations and additions.
§ 100-2 — Lots of greater than five acres; systems in fill.
§ 100-3 — Lots beyond the four-split rule; systems not in fill or land that percolates.
§ 103-1 — General regulations.
§ 105-1 — Purpose.
105-2{3} — PEDDLING
105-2{5} — REGISTERING
§ 105-3 — Registration and permit requirements.
§ 105-7 — Permit to be carried at all times.
§ 105-8 — Revocation of permit.
§ 105-9 — Issuance of permit; conditions.
§ 105-10 — Records of registration, supervision.
§ 105-11 — Exemptions.
§ 105-12 — Fees.
§ 115-3 — Specific purposes.
115-5{6} — APPLICANT
115-5{21} — CONNECTION CHARGE (TAP FEE)
115-5{22} — CONSTRUCTION ACTIVITY
115-5{47} — ILLICIT CONNECTION
115-5{51} — INDUSTRIAL ACTIVITY
115-5{57} — INTERFERENCE
115-5{62} — NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT
115-5{74} — PASS-THROUGH
115-5{75} — PERMIT
115-5{92} — RECORDS
115-5{113} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MS4s, PERMIT NO GP-02-02
115-5{114} — SPECIAL CONDITIONS
115-5{118} — STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) STORMWATER DISCHARGE PERMIT
115-5{124} — SUPERINTENDENT
115-5{132} — USER
115-5{138} — WASTEWATER
115-5{139} — WASTEWATER DISCHARGE PERMIT
§ 115-8 — Waste disposal unlawful.
§ 115-12 — Building permit allowed only when approved wastewater disposal available.
§ 115-16 — Wastewater from outside POTW service area; intermunicipal agreements.
§ 115-21 — Construction permit application.
§ 115-22 — Construction permit required before construction commencement.
§ 115-25 — Septage removal.
§ 115-26 — Direct connection to new public sewers required.
§ 115-28 — Proper design.
§ 115-29 — New sewers subject to approval, fees, inspection, testing, and reporting.
§ 115-33 — Sewer pipe installation.
§ 115-36 — Infiltration/exfiltration testing.
§ 115-46 — Liability insurance coverage during construction period.
§ 115-47 — Permit required.
§ 115-49 — Sewer lateral permits.
§ 115-55 — Lateral pipe materials.
§ 115-56 — Street lateral to public sewer connection.
§ 115-60 — Sewage lifting.
§ 115-63 — Cast iron pipe poured joints.
§ 115-66 — Building lateral/street lateral connection.
§ 115-68 — Street lateral replacement ownership.
§ 115-70 — Connection inspection.
§ 115-72 — Public safety provisions required; restoration of disturbed areas.
§ 115-80 — Licenses and application.
§ 115-81 — Concurrent requirements.
§ 115-82 — Dumping location and timing.
§ 115-85 — General prohibitions.
§ 115-86 — Concentration based limitations.
§ 115-87 — Modification of limitations.
Ch 115 Art X — Discharge Permits and Pretreatment Requirements
§ 115-93 — Wastewater discharge reports.
§ 115-95 — Wastewater discharges.
§ 115-96 — Wastewater discharge permits required for significant industrial users.
§ 115-97 — Other industrial users.
§ 115-98 — Discharge permits to storm sewers not authorized.
§ 115-99 — Application for wastewater discharge permits.
§ 115-100 — Permit modifications.
§ 115-101 — Permit conditions.
§ 115-102 — Permit duration.
§ 115-103 — Permit reissuance.
§ 115-104 — Permit transfer.
§ 115-105 — Permit revocation.
§ 115-106 — Public notification.
§ 115-107 — Report requirements for permittee.
§ 115-108 — Flow equalization.
§ 115-110 — Proper design and maintenance of facilities and monitoring stations.
§ 115-111 — Vandalism and tampering with measuring devices.
§ 115-113 — Accidental discharges; SPCC plan.
§ 115-116 — Public access to information maintained by Superintendent.
§ 115-117 — Access to property and records.
§ 115-118 — Access to easements.
§ 115-120 — Special agreements.
§ 115-122 — Notification of violation.
§ 115-124 — Administrative or compliance orders.
§ 115-125 — Administrative fines.
§ 115-126 — Cease and desist orders.
§ 115-127 — Termination of permit.
§ 115-128 — Water supply severance.
§ 115-130 — Failure of user to petition Superintendent.
§ 115-133 — Civil actions for penalties.
§ 115-134 — Court orders.
§ 115-135 — Criminal penalties.
§ 115-136 — Additional injunctive relief.
§ 115-139 — Performance bonds.
§ 115-140 — Liability insurance.
§ 115-150 — Pretreatment program costs.
§ 115-159 — Procedural requirements available.
§ 115-165 — Purpose.
§ 115-167 — Discharge prohibitions.
§ 115-168 — Prohibition against activities contaminating stormwater.
§ 115-169 — Prevention, control, and reduction of stormwater contaminants by use of best management practices.
§ 115-170 — Industrial or construction activity discharges.
§ 115-172 — Access and monitoring of discharges.
§ 115-179 — Violations deemed public nuisance.
116-2{1} — CHILD DAY-CARE FACILITY
§ 116-3 — Residency restrictions.
§ 117-1 — Consideration by Planning Board.
§ 117-2 — Sketch plan conference.
§ 117-3 — Application for preliminary site plan approval.
§ 117-6 — Procedure for final detailed site plan approval.
§ 117-7 — Planning Board action on final detailed site plan.
118-4{5} — LOUD OR UNRULY GATHERING
§ 118-5 — Penalties for offenses.
§ 118A-3 — Applicability.
118A-4{7} — ROOFTOP-MOUNTED SOLAR ENERGY SYSTEM
118A-4{8} — SPECIAL USE PERMIT
§ 118A-5 — Use districts.
§ 118A-6 — General regulations.
§ 118A-7 — Roof-mounted solar energy systems.
§ 118A-8 — Building-mounted solar energy systems.
§ 118A-9 — Ground-mounted solar energy systems.
§ 118A-10 — Large utility-scale solar energy systems.
Ch 118A Art II — Special Use Permit Requirements and Procedure
§ 118A-11 — Special use permit requirements.
§ 118A-12 — Transfer of special use permit.
§ 118A-13 — Violations.
§ 118A-14 — Expiration.
§ 118A-15 — Decommissioning plan.
§ 118A-16 — Inspections; continued operation.
Ch 118A Art V — Revocation of Permit
§ 118A-17 — Revocation.
§ 118A-20 — Penalties for offenses.
Ch 119 Art II — Recycling; Licensing of Collectors
119-3{1} — AUTHORIZED COLLECTOR
119-3{14} — INDUSTRIAL PROPERTY
119-3{17} — MOTOR VEHICLE
§ 119-12 — Authorized collectors; license required.
§ 119-13 — Failure to comply; enforcement procedure; inspections and appearance tickets.
§ 119-15 — Penalties for offenses.
120-1{12} — INDUSTRIAL STORMWATER PERMIT
120-1{17} — LICENSED PROFESSIONAL
120-1{27} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITY, PERMIT NO. GP-02-01
120-1{28} — SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s), PERMIT NO. GP-02-02
§ 120-2 — Findings; purpose.
§ 120-3 — General provisions.
§ 120-4 — Procedure.
§ 120-5 — Stormwater pollution prevention plans.
§ 120-8 — Administration and enforcement; penalties for offenses.
§ 121-5 — Permit required; application.
§ 121-6 — Fees; grant or denial of permit.
§ 121-7 — Validity of permit.
§ 121-10 — Number of permits limited.
§ 123-1 — Authorization of subdivision plat approval.
123-4{4} — DESIGNATED TOWN ENGINEER
123-4{21} — SUBDIVISION
123-4{23} — SURVEYOR, LAND
§ 123-5 — Approval required.
§ 123-6 — Preapplication and classification.
§ 123-9 — Major subdivision final plat.
§ 123-16 — General requirements.
§ 123-17 — Design standards.
§ 123-18 — Minor subdivision plat.
§ 123-20 — Major subdivision preliminary plat.
§ 123-21 — Major subdivision final plat.
§ 130-1 — Construction of towers permitted.
§ 130-4 — Use permit required; exceptions.
§ 130-6 — Application for permit.
§ 130-7 — Rules and regulations for maintenance.
§ 130-8 — Location of towers; noise restrictions.
§ 130-10 — Towers permitted in certain areas only.
§ 134-3 — No parking on certain streets.
§ 134-4 — Trailers and vans.
§ 134-7 — Overnight parking.
§ 140-3 — Conformance to provisions required.
Ch 140 Art II — Permits
§ 140-4.1 — Water service; permit requirements.
§ 140-5 — Fees payable prior to issuance.
§ 140-12 — Trenches.
§ 140-24 — Installation and maintenance.
§ 140-29 — Meter reading and maintenance.
§ 140-40 — Fire service connections; lawn sprinkler connections.
§ 140-44 — Meddling with Equipment by unauthorized persons prohibited.
§ 140-46 — Responsibility for certain types of damage.
§ 144-10 — Nonconforming uses, buildings and lots.
§ 144-11 — Sanitation.
§ 144-13 — Roadside stands.
§ 144-15 — Offensive businesses.
§ 144-16 — Construction.
§ 144-21 — Public buildings and utilities.
§ 144-22 — Hospitals.
§ 144-23 — Cemeteries.
§ 144-30 — Uses not specifically permitted.
§ 144-42 — Units of measurement.
§ 144-43 — Accessory uses; joint facilities.
§ 144-44 — Site requirements.
§ 144-45 — Permitted and prohibited uses.
§ 144-50 — Swimming pools.
§ 144-51 — Permitted and prohibited uses.
§ 144-56 — Swimming pools.
§ 144-57 — Boarding- and rooming houses.
§ 144-58 — Permitted and prohibited uses.
§ 144-63 — Swimming pools.
§ 144-64 — Boardinghouses and rooming houses.
§ 144-65 — Farm buildings.
§ 144-66 — Utility permits.
§ 144-67 — Camps.
§ 144-69 — Golf courses.
§ 144-72 — Permit required.
§ 144-74 — Permitted uses.
§ 144-75 — Uses permitted by special use permit.
§ 144-76 — Expansion of existing buildings.
§ 144-77 — Prohibited uses.
§ 144-78 — Bulk requirements.
§ 144-79 — Design standards.
§ 144-82 — Permit required.
§ 144-84 — Permitted uses.
§ 144-85 — Uses permitted by special use permit.
§ 144-86 — Expansion of existing buildings.
§ 144-86.1 — Prohibited uses.
§ 144-86.2 — Bulk requirements.
§ 144-86.3 — Design standards.
§ 144-86.6 — Permit required.
§ 144-86.8 — Permitted uses.
§ 144-86.9 — Uses permitted by special use permit.
§ 144-86.10 — Expansion of existing buildings.
§ 144-86.11 — Prohibited uses.
§ 144-86.12 — Bulk requirements.
§ 144-86.13 — Design standards.
§ 144-87 — Permit required.
§ 144-89 — Prohibited and permitted uses.
§ 144-90 — District regulations.
§ 144-91 — Purpose and applicability of industrial performance standards.
§ 144-92 — Performance standards.
§ 144-93 — Site plan review; enforcement; compliance.
§ 144-93.4 — Permit required.
§ 144-93.6 — Permitted uses.
§ 144-93.7 — Prohibited uses.
§ 144-93.9 — Design standards.
§ 144-100 — Commercial Zone.
§ 144-101 — Restricted Commercial Zone.
§ 144-102.1 — Signs.
144-102.1C(1){2} — TEMPORARY
§ 144-112 — Variances.
§ 144-118 — Petition for change.
§ 144-119 — Interpretation.
§ 144-120 — Enforcement.
Ch 144 Art XV — Permits and Certificates
§ 144-125 — Building permits.
§ 144-126 — Expiration of building permits.
§ 144-127 — Certificates of occupancy.
§ 144-128 — Approval required for change in use.
§ 144-129 — Street frontage requirements.
§ 144-131 — Compliance with Subdivision Regulations required.
§ 144-133 — Building permits for accessory structures.
§ 144-134 — Use permit required.
§ 144-135 — Special use permits.
§ 144-141 — Special procedure for multiple dwellings.
§ 144-142 — Guidelines to be considered.
§ 144-142.5 — Permitted uses.
§ 144-142.7 — Other zoning requirements and design standards.
§ 144-142.12 — Permitted uses.
§ 144-142.14 — Other zoning requirements and design standards.
§ 144-142.19 — Permitted uses.
§ 144-142.21 — Other zoning requirements and design standards.
§ 144-142.26 — Permitted uses.
§ 144-142.28 — Other zoning requirements and design standards.
Ch 144 Art XVII — Transfer of Permitted Development Rights
§ 144-145 — Authorization for transfer.
§ 144-146 — Procedure; fee.
§ 144-147 — General standards.
§ 144-150 — Licenses and permits.
§ 144-151 — Standards for all tanks.
§ 144-153 — Procedure.
§ 144-155 — Exceptions.
add
Liens
§ 59B-4 — Enforcement and penalties for offenses.
§ 118-7 — Billing and collection.
§ 118A-15 — Decommissioning plan.
§ 120-8 — Administration and enforcement; penalties for offenses.
§ 140-37 — Unpaid charges to constitute lien.
add
Lighting
§ 52-19 — Construction inspections.
§ 59A-4 — Tower special use permits application materials.
§ 59A-5 — Communications facility standards.
§ 60-2 — Dealers.
§ 71-3 — Application and certification required for electrical work.
§ 87-4 — Certificate of appropriateness for alteration, demolition or new construction.
§ 87-6 — Certificate of appropriateness application procedure.
§ 97-16 — Community service facilities.
§ 115-72 — Public safety provisions required; restoration of disturbed areas.
§ 117-3 — Application for preliminary site plan approval.
§ 117-4 — Planning Board review of preliminary site plan.
§ 118A-6 — General regulations.
§ 118A-10 — Large utility-scale solar energy systems.
119-3{11} — GLASS
§ 123-21 — Major subdivision final plat.
§ 144-1 — Statutory authority; purpose.
144-2B{20} — LIVABLE FLOOR AREA OR SPACE
§ 144-44 — Site requirements.
§ 144-79 — Design standards.
§ 144-86.3 — Design standards.
§ 144-86.8 — Permitted uses.
§ 144-86.13 — Design standards.
§ 144-88 — Purpose; intent.
§ 144-89 — Prohibited and permitted uses.
§ 144-92 — Performance standards.
§ 144-93.8 — Submission requirements.
§ 144-93.9 — Design standards.
§ 144-102.1 — Signs.
144-102.1H{1} — DIGITAL SIGNS
§ 144-142.6 — Submission requirements.
§ 144-142.7 — Other zoning requirements and design standards.
§ 144-142.13 — Submission requirements.
§ 144-142.14 — Other zoning requirements and design standards.
§ 144-142.20 — Submission requirements.
§ 144-142.21 — Other zoning requirements and design standards.
§ 144-142.27 — Submission requirements.
§ 144-142.28 — Other zoning requirements and design standards.
add
Litter
§ 97-20 — Fire protection.
118-4{5} — LOUD OR UNRULY GATHERING
§ 120-5 — Stormwater pollution prevention plans.
§ 121-8 — Removal of debris required.
add
Littering
§ 97-20 — Fire protection.
118-4{5} — LOUD OR UNRULY GATHERING
§ 120-5 — Stormwater pollution prevention plans.
§ 121-8 — Removal of debris required.
add
Livestock
§ 50-2 — Legislative findings and purposes.
50-3B{3} — AGRICULTURE
120-1{1} — AGRICULTURAL ACTIVITY
144-2B{11} — FARM
§ 144-70 — Agricultural accessory uses.
add
Lots
§ 52-2 — Application for construction of or conversion to residential buildings.
§ 52-4 — Recreation filing fee.
§ 52-6 — Appeal upon denial of permit; fee.
§ 52-18 — Building permits.
§ 59-5 — Location restricted.
59A-2{1} — ACCESSORY STRUCTURE
§ 59A-5 — Communications facility standards.
§ 60-2 — Dealers.
§ 60-3 — Lots.
60-6{1} — AREAS DESIGNATED FOR NEW OR USED CAR LOTS
60-6{2} — NEW OR USED CAR LOT
§ 60-7 — Permitted areas.
§ 60-8 — Requirements.
§ 60-9 — Application; fee; review; determination.
Ch 77 — Filling and Grading
§ 77-1 — Drainage plan required.
82-4{28} — MANUFACTURED HOME PARK OR SUBDIVISION
§ 82-13 — Application for permit.
§ 82-22 — Conditions for variances.
Ch 88 — Industrial Development Agency
§ 97-2 — Design and construction standards.
§ 97-9 — Recreation areas.
§ 97-14 — Sewage disposal.
§ 97-15 — Electrical distribution system.
§ 97-17 — Refuse.
§ 97-19 — Fuel supply and storage.
Ch 100 — Acreage Lot Development
§ 100-1 — Purpose.
§ 100-2 — Lots of greater than five acres; systems in fill.
§ 100-3 — Lots beyond the four-split rule; systems not in fill or land that percolates.
105-2{7} — TRANSIENT RETAIL BUSINESS
115-5{83} — PREMISES
§ 115-21 — Construction permit application.
§ 115-30 — Plans, specifications, and pipe test results required.
§ 115-57 — Future connection locations; as-built drawings.
§ 118A-6 — General regulations.
§ 118A-9 — Ground-mounted solar energy systems.
§ 118A-10 — Large utility-scale solar energy systems.
§ 118A-11 — Special use permit requirements.
§ 118A-15 — Decommissioning plan.
§ 118A-16 — Inspections; continued operation.
Ch 123 — Subdivision of Land
§ 123-2 — Declaration; objectives.
§ 123-3 — Word usage.
123-4{6} — IMPROVEMENT
123-4{21} — SUBDIVISION
§ 123-5 — Approval required.
§ 123-16 — General requirements.
§ 123-17 — Design standards.
§ 123-19 — Major subdivision preapplication.
§ 123-20 — Major subdivision preliminary plat.
§ 123-21 — Major subdivision final plat.
§ 123-22 — Procedure and standards.
§ 130-8 — Location of towers; noise restrictions.
Ch 144 — Zoning
§ 144-1 — Statutory authority; purpose.
§ 144-2 — Definitions and word usage.
144-2B{1} — ACCESSORY BUILDING
144-2B{8} — DEPTH OF LOT
144-2B{21} — LOT
144-2B{22} — LOT WIDTH
144-2B{26} — OLD CAR STORAGE YARD
144-2B{27} — PARKING LOT
144-2B{28} — PLOT
144-2B{32} — SETBACK
144-2B{34} — SINGLE-FAMILY RESIDENTIAL
144-2B{36} — SUBDIVISION
§ 144-8 — Interpretation of boundaries.
§ 144-10 — Nonconforming uses, buildings and lots.
§ 144-17 — Accessory buildings.
§ 144-27 — Utility lines.
§ 144-31 — Lot area.
§ 144-32 — Yards.
§ 144-33 — Driveways.
§ 144-39 — Business or industrial uses.
§ 144-41 — Mixed uses.
§ 144-43 — Accessory uses; joint facilities.
§ 144-44 — Site requirements.
§ 144-45 — Permitted and prohibited uses.
§ 144-47 — Lot size.
§ 144-48 — Trailers (mobile homes).
§ 144-50 — Swimming pools.
§ 144-51 — Permitted and prohibited uses.
§ 144-53 — Lot size.
§ 144-54 — Trailers (mobile homes).
§ 144-56 — Swimming pools.
§ 144-58 — Permitted and prohibited uses.
§ 144-60 — Lot size.
§ 144-61 — Trailers (mobile homes).
§ 144-63 — Swimming pools.
§ 144-77 — Prohibited uses.
§ 144-78 — Bulk requirements.
§ 144-79 — Design standards.
§ 144-84 — Permitted uses.
§ 144-86.2 — Bulk requirements.
§ 144-86.3 — Design standards.
§ 144-86.8 — Permitted uses.
§ 144-86.12 — Bulk requirements.
§ 144-86.13 — Design standards.
§ 144-90 — District regulations.
§ 144-92 — Performance standards.
§ 144-93.9 — Design standards.
§ 144-95 — Building height.
§ 144-96 — Corner lots.
§ 144-97 — Residential A Zone.
§ 144-98 — Residential B Zone.
§ 144-99 — Residential C and Agricultural Zone.
§ 144-100 — Commercial Zone.
§ 144-101 — Restricted Commercial Zone.
§ 144-102 — Industrial Zone.
§ 144-102.1 — Signs.
§ 144-119 — Interpretation.
§ 144-129 — Street frontage requirements.
§ 144-130 — Changes in zone requirements.
§ 144-131 — Compliance with Subdivision Regulations required.
§ 144-132 — Corner lots.
§ 144-142.5 — Permitted uses.
§ 144-142.7 — Other zoning requirements and design standards.
§ 144-142.12 — Permitted uses.
§ 144-142.14 — Other zoning requirements and design standards.
§ 144-142.19 — Permitted uses.
§ 144-142.21 — Other zoning requirements and design standards.
§ 144-142.26 — Permitted uses.
§ 144-142.28 — Other zoning requirements and design standards.
144-144{2} — RECEIVING DISTRICT
144-144{3} — SENDING DISTRICT
§ 144-147 — General standards.