home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
note
Notes (29)
pubdocs
Public Documents
Public Documents
Budgets (8)
Comprehensive Plans (2)
Minutes (295)
Resolutions (933)
help_center
Help
Help
About Us
ecode
ecode
search
Login
City of Monroe, WI
chevron_right
2024-04-15
info
chevron_right
Index: C
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
C
add
Cable television
§ 5-3-8 — Institutional land uses.
add
Camping
3-14-1{2} — HOTEL or MOTEL
§ 4-1-4 — Wisconsin administrative code adopted.
4-2-3{22} — MOBILE RECREATIONAL VEHICLE
§ 5-3-12 — Storage land uses.
§ 5-3-18 — Temporary uses.
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){4} — CAMPGROUND
5-6-6(2){5} — CAMPING UNIT
§ 5-7-11 — Off-street parking and traffic circulation.
10-1-1{15} — MOBILE RECREATIONAL VEHICLE
add
Camps
3-14-1{2} — HOTEL or MOTEL
§ 4-1-4 — Wisconsin administrative code adopted.
4-2-3{22} — MOBILE RECREATIONAL VEHICLE
§ 5-3-12 — Storage land uses.
§ 5-3-18 — Temporary uses.
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){4} — CAMPGROUND
5-6-6(2){5} — CAMPING UNIT
§ 5-7-11 — Off-street parking and traffic circulation.
10-1-1{15} — MOBILE RECREATIONAL VEHICLE
add
Campsites
§ 5-3-9 — Commercial land uses.
add
Carbon monoxide
§ 7-2-1 — Wisconsin Administrative Code adopted.
add
Carbon monoxide detectors
§ 7-2-1 — Wisconsin Administrative Code adopted.
add
Carnivals
§ 3-13-9 — Application for permit.
§ 9-2-17 — Animals prohibited.
§ 9-2-18 — Wild animals.
§ 9-4-31 — Fraud on hotel or restaurant keeper, recreational attraction, taxicab operator, or gas station.
add
Cats
§ 5-3-7 — Agricultural land uses.
§ 9-2-6 — Cat license.
§ 9-2-7 — Rabies vaccination.
§ 9-2-9 — Number of animals limited.
§ 9-2-10 — Care and treatment.
§ 9-2-22 — Possessing chickens and rabits.
§ 9-2-24 — Release from impound.
§ 9-2-25 — Rabies quarantine.
§ 9-2-27 — Enforcement.
add
Cemeteries
§ 5-3-8 — Institutional land uses.
§ 9-2-13 — Animals in public places.
§ 9-2-14 — Animals in parks and cemetery.
add
Certificates of compliance
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){6} — CERTIFICATE OF COMPLIANCE
§ 5-8-7 — Installation requirements.
add
Certificates of insurance
§ 3-7-5 — Insurance requirements.
§ 3-9-3 — Sidewalk cafe permit.
§ 3-9-4 — Streatery permit.
§ 3-13-10 — Insurance requirements.
add
Certificates of occupancy
§ 4-1-12 — Inspections.
§ 4-1-13 — Certificate of occupancy.
§ 4-2-10 — Lodging houses; permits.
§ 5-10-28 — Conditional use permit procedures.
§ 5-10-40 — Interpretations.
§ 5-10-42 — Appeals of zoning interpretations.
§ 7-4-1 — Rapid entry key lock box system.
8-7-4{1} — DEVELOPED PROPERTY
add
Cesspools
§ 8-1-8 — Cesspools and privies.
§ 8-1-9 — Sewer and water main connections.
§ 8-5-15 — Amount of sewer service charges.
add
Charges
§ 1-1-4 — Clerk to maintain code.
1-3-2{7} — FEE
1-3-2{15} — OWNER
§ 1-6-4 — City treasurer.
§ 1-13-2 — Delinquent taxes; interest; penalty.
§ 1-13-3 — Service charge on returned checks or drafts.
§ 1-16-5 — Public access to records.
§ 2-9-4 — Duties.
§ 2-13-4 — Duties.
§ 3-1-1 — License required.
§ 3-1-2 — Application for license.
§ 3-1-3 — Issuance of license.
§ 3-4-3 — General licensing requirements.
§ 3-7-7 — Permit fees.
§ 3-9-4 — Streatery permit.
§ 3-10-2 — Application, issuance of license; fees.
3-12-3{1} — COMMERCIAL WEIGHING AND MEASURING DEVICE
§ 3-12-9 — Fee assessment.
§ 3-13-13 — Special events regulations.
3-14-1{1} — GROSS RECEIPTS
§ 3-15-11 — Fees for answering alarms.
§ 4-1-14 — Powers and duties of building inspector.
§ 4-2-6 — Safe and sanitary maintenance of property.
§ 5-2-6 — (RH-35) Rural Holding Zoning District.
§ 5-2-7 — (SR-3) Single Family Residential — 3 Zoning District.
§ 5-2-8 — (SR-4) Single Family Residential — 4 Zoning District.
§ 5-2-9 — (SR-5) Single Family Residential — 5 Zoning District.
§ 5-2-10 — (SR-7) Single Family Residential — 7 Zoning District.
§ 5-2-11 — (DR-8) Duplex Residential — 8 Zoning District.
§ 5-2-12 — (TR-10) One and Two Family Residential — 10 Zoning District.
§ 5-2-13 — (MR-15) Multi-Family Residential — 15 Zoning District.
§ 5-2-14 — (MR-30) Multi-Family Residential — 30 Zoning District.
§ 5-2-15 — (MH-7) Mobile Home Residential — 7 Zoning District.
§ 5-2-21 — (NMU) Neighborhood Mixed Use Zoning District.
§ 5-2-22 — (I) Institutional Zoning District.
§ 5-2-23 — (SMU) Suburban Mixed-Use Zoning District.
§ 5-2-24 — (UMU) Urban Mixed-Use Zoning District.
§ 5-2-25 — (CMU) Central Mixed-Use Zoning District.
§ 5-2-26 — (IOA) Intensive Outdoor Activity Zoning District.
§ 5-2-30 — (BP) Business Park Zoning District.
§ 5-2-31 — (LI) Light Industrial Zoning District.
§ 5-2-32 — (HI) Heavy Industrial Zoning District.
§ 5-2-33 — (EX) Extraction Zoning District.
§ 5-3-5 — Table of Land Uses.
§ 5-3-17 — Accessory land uses and structures.
§ 5-7-46 — Administration and enforcement.
§ 5-9-27 — Sign permit application, enforcement, and revocation.
§ 5-10-43 — Administration and enforcement of performance standards.
§ 5-10-44 — Violations and penalties.
§ 5-11-1 —
§ 6-1-4 — Procedure for subdividing.
§ 6-3-9 — Later sewer hookup costs.
§ 6-3-13 — Extension of improvements not in proposed subdivision.
§ 7-1-8 — General authority; combat fires and related emergencies.
§ 7-2-3 — Dry grass, weeds, bushes or foliage.
§ 8-1-1 — Abatement of nuisances.
§ 8-1-4 — Smoking prohibited.
§ 8-2-12 — Notice of violation and appeal.
§ 8-3-4 — Source separation and preparation required.
§ 8-3-5 — Garbage collection and disposal.
§ 8-3-6 — Collection and transportation of solid waste.
8-4-1{3} — DEDUCT METER
§ 8-4-3 — Connections and installations.
§ 8-4-4 — Cross-connections.
§ 8-4-7 — Billings.
8-5-1{13} — DEDUCT METER
8-5-1{33} — SEWER SERVICE CHARGE
§ 8-5-5 — Sewer construction and connection requirements.
§ 8-5-11 — Industrial wastewater discharge permits.
§ 8-5-12 — Septage disposal permits.
§ 8-5-13 — General regulations.
§ 8-5-14 — Basis for sewer service charges.
§ 8-5-15 — Amount of sewer service charges.
§ 8-5-16 — Billing practice.
§ 8-5-18 — Validity.
§ 8-5-19 — Audit, notification, and records.
§ 8-6-4 — Schedule of charges.
8-7-4{2} — ERU
8-7-4{9} — STORM WATER UTILITY
8-7-4{10} — STORM WATER UTILITY CHARGE
§ 8-7-5 — Basis of storm water utility charges.
§ 8-7-7 — Classifications.
§ 8-7-8 — Storm water utility charge formulas.
§ 8-7-9 — Credits and adjustments.
§ 9-4-15 — Noxious weeds.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 9-4-24 — Unauthorized person prohibited on school grounds.
§ 9-4-28 — Failure to return library materials.
§ 9-4-30 — Obtaining utility service by fraud.
§ 9-4-31 — Fraud on hotel or restaurant keeper, recreational attraction, taxicab operator, or gas station.
§ 10-2-3 — General parking regulations.
§ 10-2-5 — Parking during snow removal.
§ 10-2-8 — Penalties.
§ 10-2-9 — Enforcement.
§ 10-3-4 — Inspection and registration of bicycles.
§ 11-1-8 — Installation of public utility facilities.
§ 11-1-9 — Construction and repair of sidewalks.
§ 11-1-10 — Sidewalk maintenance.
§ 11-2-3 — Numbering plan.
§ 11-3-3 — Dog park provisions.
§ 11-5-6 — Assessment of costs of abatement.
§ 11-6-9 — Leases.
§ 11-6-10 — Airport operation.
§ 11-6-18 — Schedule of charges.
add
Chief of Police
§ 1-6-8 — Building inspector.
§ 1-14-2 — Contents of citation.
§ 1-14-3 — Schedule of deposits.
§ 3-1-2 — Application for license.
§ 3-1-8 — Revocation of license.
§ 3-7-6 — Investigation and issuance.
§ 3-7-9 — Duty of police to report.
§ 3-9-3 — Sidewalk cafe permit.
§ 3-9-4 — Streatery permit.
§ 3-10-3 — Investigation of applicant and premises.
§ 3-10-6 — Power to supervise, close.
§ 3-10-7 — Revocation of license.
§ 3-13-6 — Authority of chief of police.
§ 3-13-7 — Determination of substantial impact.
§ 3-13-9 — Application for permit.
§ 3-13-11 — Investigation and issuance.
§ 3-13-14 — Duty of police to report and enforce.
§ 3-13-15 — Appeal.
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
§ 8-1-2 — Communicable diseases.
§ 8-3-9 — Enforcement.
§ 9-4-6 — Gambling.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 9-5-2 — Impoundment and disposition of abandoned vehicles.
§ 10-2-4 — Parking permits.
§ 10-2-9 — Enforcement.
§ 10-3-4 — Inspection and registration of bicycles.
add
Churches
§ 5-3-8 — Institutional land uses.
§ 5-3-9 — Commercial land uses.
§ 5-4-3 — Exceptions to maximum height regulations.
§ 5-7-11 — Off-street parking and traffic circulation.
§ 6-4-3 — Arrangement of streets.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 9-4-35 — Marijuana, synthetic cannabinoids and drug paraphernalia.
add
Citations
Ch 1-14 — Citations for Code Violations
§ 1-14-1 — Method adopted.
§ 1-14-2 — Contents of citation.
§ 1-14-3 — Schedule of deposits.
§ 1-14-4 — Issuance of citation.
§ 1-14-6 — Nonexclusivity.
§ 1-15-6 — Sanctions.
§ 3-7-9 — Duty of police to report.
§ 3-13-14 — Duty of police to report and enforce.
§ 5-10-10 — Zoning Administrator.
§ 8-1-4 — Smoking prohibited.
§ 9-3-8 — Deposit schedule.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 9-4-34 — Curfew.
§ 10-2-8 — Penalties.
§ 10-2-9 — Enforcement.
add
City Clerk
§ 1-1-4 — Clerk to maintain code.
§ 1-5-8 — Rules of procedure.
§ 1-5-9 — Ordinance procedure.
§ 1-5-12 — Filling vacancies on Common Council
§ 1-6-1 — General provisions and requirements.
§ 1-6-3 — City clerk.
§ 1-8-2 — Official map.
§ 1-11-5 — Determination of ranking.
§ 1-12-2 — Compliance.
§ 1-12-3 — Grievance procedure.
§ 1-16-3 — Duty to maintain records.
§ 1-16-4 — Legal custodian.
§ 1-16-9 — Retention of records.
§ 2-1-5 — Duties and powers.
§ 2-2-1 — Members.
§ 2-5-3 — Rules of board.
§ 3-1-2 — Application for license.
§ 3-1-3 — Issuance of license.
§ 3-1-5 — Transfer of license.
§ 3-1-6 — Posting of license.
§ 3-1-8 — Revocation of license.
§ 3-3-6 — Appeal.
§ 3-4-3 — General licensing requirements.
§ 3-4-5 — Sidewalk cafes.
§ 3-4-7 — General provisions.
§ 3-5-4 — Procedure for revocation or suspension.
§ 3-5-5 — Procedure for refusal to issue or renew license.
§ 3-6-3 — Application.
§ 3-7-2 — Exemptions.
§ 3-7-4 — Application for permit.
§ 3-7-5 — Insurance requirements.
§ 3-7-6 — Investigation and issuance.
§ 3-7-7 — Permit fees.
§ 3-7-8 — Regulation of transient merchants.
§ 3-7-9 — Duty of police to report.
§ 3-8-4 — Taxicab business license.
§ 3-8-6 — Taxicab indemnity bond.
§ 3-8-7 — Provisions, cancellation of undertaking.
§ 3-8-10 — Revocation.
§ 3-9-3 — Sidewalk cafe permit.
§ 3-9-4 — Streatery permit.
§ 3-10-2 — Application, issuance of license; fees.
§ 3-10-3 — Investigation of applicant and premises.
§ 3-10-5 — Posting license.
§ 3-10-7 — Revocation of license.
§ 3-11-2 — Application for license.
§ 3-12-5 — Weights and measures license application.
§ 3-12-6 — Issuance of weights and measures license.
§ 3-12-9 — Fee assessment.
§ 3-13-9 — Application for permit.
§ 3-13-10 — Insurance requirements.
§ 3-13-11 — Investigation and issuance.
§ 3-13-14 — Duty of police to report and enforce.
§ 3-13-15 — Appeal.
§ 3-14-5 — Permit.
§ 3-14-10 — Security required.
§ 3-15-8 — Permits, fees, application.
§ 3-15-9 — Confidentiality and permit distribution.
§ 3-15-12 — Revocation of permits.
§ 4-2-6 — Safe and sanitary maintenance of property.
§ 5-3-17 — Accessory land uses and structures.
§ 5-9-27 — Sign permit application, enforcement, and revocation.
§ 5-10-28 — Conditional use permit procedures.
§ 6-2-3 — Final plat requirements and procedures.
§ 6-2-6 — Final plat filing.
§ 8-1-5 — Slaughterhouses.
§ 8-2-12 — Notice of violation and appeal.
§ 8-2-14 — Appeals.
§ 8-3-6 — Collection and transportation of solid waste.
§ 8-3-10 — Penalty.
§ 8-4-3 — Connections and installations.
§ 8-4-4 — Cross-connections.
§ 8-4-11 — Private well abandonment.
§ 8-5-4 — Records kept.
§ 8-7-9 — Credits and adjustments.
§ 9-1-1 — Creation; appointment of members.
§ 9-2-2 — Licenses and permits.
§ 9-2-20 — Commercial animal establishment permit required.
§ 9-2-22 — Possessing chickens and rabits.
§ 9-2-25 — Rabies quarantine.
§ 9-4-15 — Noxious weeds.
§ 9-4-16 — Fireworks.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 11-1-1 — Improvements; plans and specifications.
§ 11-1-3 — Application for permit.
§ 11-1-4 — Issuance of permit.
§ 11-1-9 — Construction and repair of sidewalks.
§ 11-3-3 — Dog park provisions.
§ 11-3-4 — Park rules.
§ 11-4-1 — Powers of city forester.
§ 11-4-3 — Removal of trees.
§ 11-5-5 — Abatement of nuisances.
§ 11-6-2 — Zones designated.
§ 11-6-3 — Zoning maps.
§ 11-6-7 — Operator licenses; classification and description.
§ 11-6-8 — Operator license application.
§ 11-6-9 — Leases.
§ 11-6-12 — Flying clubs.
§ 11-6-13 — Airport activity clubs.
add
Combustibles
§ 5-7-35 — Glare and heat standards.
§ 5-9-33 — Appearance, construction and maintenance of signage.
§ 7-1-7 — Fire inspection.
§ 7-2-1 — Wisconsin Administrative Code adopted.
7-5-4{11} — OPEN BURNING
7-5-4{13} — OUTDOOR GRILLING
7-5-4{14} — OUTDOOR WOOD-FIRED FURNACE
§ 7-5-7 — Open burning of leaves, brush, clean wood and other vegetative debris.
§ 7-5-8 — Outdoor wood-fired furnaces.
§ 9-4-16 — Fireworks.
9-4-16(B){1} — EXCLUDED COMBUSTIBLE
9-4-16(B){2} — FIREWORKS
§ 11-6-10 — Airport operation.
add
Commercial vehicles
§ 5-3-17 — Accessory land uses and structures.
§ 5-7-11 — Off-street parking and traffic circulation.
add
Communicable diseases
§ 8-1-2 — Communicable diseases.
add
Compensation
§ 1-6-1 — General provisions and requirements.
§ 1-7-1 — Salaries.
§ 1-15-5 — Standards of conduct.
§ 2-3-1 — Commission members, appointment.
§ 2-4-1 — Members and appointment.
§ 2-5-1 — Members.
§ 2-6-2 — Members and appointment.
§ 2-7-1 — Board created.
§ 2-13-4 — Duties.
§ 2-14-1 — Members and appointment.
§ 3-7-5 — Insurance requirements.
4-2-3{18} — LODGING HOUSE
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){30} — FREEBOARD
§ 5-10-33 — Planned development review and approval procedures.
§ 7-1-4 — Compensation.
§ 7-1-7 — Fire inspection.
§ 8-5-14 — Basis for sewer service charges.
§ 9-1-2 — Compensation.
§ 9-1-3 — Restrictions on department members.
§ 9-4-15 — Noxious weeds.
§ 9-4-27 — Retail theft.
add
Comprehensive Plan
§ 2-4-5 — Powers.
§ 5-1-3 — Purpose and intent.
5-1-22{44} — COMPREHENSIVE PLAN
§ 5-2-1 — Purpose.
§ 5-2-34 — (PD) Planned Development Zoning District.
§ 5-3-7 — Agricultural land uses.
§ 5-7-2 — Group and large development standards.
§ 5-7-8 — Design standards in the Historic Preservation Overlay District.
§ 5-8-4 — Landscaping requirements.
§ 5-10-26 — Zoning Ordinance amendment.
§ 5-10-27 — Zoning Map amendment.
§ 5-10-28 — Conditional use permit procedures.
§ 5-10-31 — Site plan review and approval procedures.
§ 5-10-32 — Historic Preservation Overlay District design review.
§ 5-10-33 — Planned development review and approval procedures.
§ 5-10-40 — Interpretations.
§ 5-10-41 — Variances.
§ 5-10-42 — Appeals of zoning interpretations.
5-11-1(3){13} — EROSION AND SEDIMENT CONTROL PLAN
5-11-1(3){45} — STORMWATER MANAGEMENT PLAN
5-11-1(3){47} — STORMWATER MANAGEMENT SYSTEM PLAN
§ 6-1-1 — Title and purpose.
§ 6-2-1 — Preliminary plat procedure.
§ 6-4-1 — General principles.
§ 6-5-1 — Modifications and exceptions.
§ DL-1 — Disposition of legislation.
add
Conditional uses
5-1-22{45} — CONDITIONAL USE
§ 5-2-5 — Description and purpose of zoning districts.
§ 5-2-6 — (RH-35) Rural Holding Zoning District.
§ 5-2-7 — (SR-3) Single Family Residential — 3 Zoning District.
§ 5-2-8 — (SR-4) Single Family Residential — 4 Zoning District.
§ 5-2-9 — (SR-5) Single Family Residential — 5 Zoning District.
§ 5-2-10 — (SR-7) Single Family Residential — 7 Zoning District.
§ 5-2-11 — (DR-8) Duplex Residential — 8 Zoning District.
§ 5-2-12 — (TR-10) One and Two Family Residential — 10 Zoning District.
§ 5-2-13 — (MR-15) Multi-Family Residential — 15 Zoning District.
§ 5-2-14 — (MR-30) Multi-Family Residential — 30 Zoning District.
§ 5-2-15 — (MH-7) Mobile Home Residential — 7 Zoning District.
§ 5-2-21 — (NMU) Neighborhood Mixed Use Zoning District.
§ 5-2-22 — (I) Institutional Zoning District.
§ 5-2-23 — (SMU) Suburban Mixed-Use Zoning District.
§ 5-2-24 — (UMU) Urban Mixed-Use Zoning District.
§ 5-2-25 — (CMU) Central Mixed-Use Zoning District.
§ 5-2-26 — (IOA) Intensive Outdoor Activity Zoning District.
§ 5-2-30 — (BP) Business Park Zoning District.
§ 5-2-31 — (LI) Light Industrial Zoning District.
§ 5-2-32 — (HI) Heavy Industrial Zoning District.
§ 5-2-33 — (EX) Extraction Zoning District.
§ 5-3-1 — Purpose.
§ 5-3-2 — Regulation of allowable uses.
§ 5-3-3 — Regulations applicable to all land uses.
§ 5-3-5 — Table of Land Uses.
§ 5-3-7 — Agricultural land uses.
§ 5-3-9 — Commercial land uses.
§ 5-3-10 — Mixed-use buildings.
§ 5-3-11 — Industrial land uses.
§ 5-3-12 — Storage land uses.
§ 5-3-13 — Transportation land uses.
§ 5-3-16 — Energy production land uses and structures.
§ 5-3-17 — Accessory land uses and structures.
§ 5-3-18 — Temporary uses.
§ 5-5-2 — Nonconforming uses.
§ 5-6-2 — How to use this chapter.
§ 5-6-5 — (AP-O) Airport Overlay Zoning District.
§ 5-7-2 — Group and large development standards.
§ 5-7-3 — Exterior building design standards.
§ 5-7-8 — Design standards in the Historic Preservation Overlay District.
§ 5-7-9 — Vehicle access standards.
§ 5-7-11 — Off-street parking and traffic circulation.
§ 5-7-25 — Exterior lighting standards.
§ 5-7-27 — Fencing standards.
§ 5-8-4 — Landscaping requirements.
§ 5-9-5 — Definitions and rules related to sign groups, sign categories, and sign types.
§ 5-9-8 — Electronic message signs.
§ 5-9-27 — Sign permit application, enforcement, and revocation.
§ 5-10-1 — Purpose.
§ 5-10-10 — Zoning Administrator.
§ 5-10-20 — Review and approval required.
§ 5-10-21 — Notice of public hearings.
§ 5-10-28 — Conditional use permit procedures.
§ 5-10-31 — Site plan review and approval procedures.
§ 5-10-32 — Historic Preservation Overlay District design review.
§ 5-10-40 — Interpretations.
add
Confidentiality
§ 1-15-4 — Responsibility of public office.
§ 1-16-11 — Release of closed meeting records.
§ 2-2-5 — Confidentiality of information provided to Assessor.
§ 2-15-4 — Duties.
§ 3-14-12 — Confidentiality.
§ 3-15-9 — Confidentiality and permit distribution.
7-5-4{4} — CONFIDENTIAL PAPERS
§ 8-3-9 — Enforcement.
add
Construction
§ 1-3-1 — Rules of interpretation.
§ 1-6-6 — Director of public works.
§ 1-6-8 — Building inspector.
§ 1-17-3 — Federal, state and city flags.
§ 2-13-4 — Duties.
§ 3-9-3 — Sidewalk cafe permit.
§ 3-9-4 — Streatery permit.
§ 4-1-2 — Purpose.
§ 4-1-3 — Scope.
§ 4-1-6 — Prohibitions.
§ 4-1-7 — Permits required.
§ 4-1-8 — Plan examination.
§ 4-1-9 — Permits.
§ 4-1-12 — Inspections.
§ 4-1-13 — Certificate of occupancy.
§ 4-1-15 — Zoning restrictions.
§ 4-1-16 — Street encroachments.
§ 4-1-19 — Roofed passageways.
§ 4-1-21 — Unsafe buildings or structures.
4-2-3{4} — BUILDING
4-2-3{14} — IMPERVIOUS TO WATER
§ 4-2-6 — Safe and sanitary maintenance of property.
§ 4-3-1 — Definition.
§ 4-3-2 — Approval.
§ 4-3-3 — Fence requirements, compliance.
§ 5-1-6 — Rules of interpretation.
5-1-22{9} — ADDITION
5-1-22{17} — ALTERATION
5-1-22{41} — CANOPY
5-1-22{51} — DESIGN STANDARDS
5-1-22{53} — DEVELOPMENT
5-1-22{66} — FENCE
5-1-22{67} — FENCE, PICKET
5-1-22{69} — FENCE, WOOD RAIL
5-1-22{114} — MOBILE HOME
5-1-22{143} — POLE BUILDING
5-1-22{168} — START OF CONSTRUCTION
5-1-22{173} — STRUCTURE
§ 5-2-6 — (RH-35) Rural Holding Zoning District.
§ 5-2-7 — (SR-3) Single Family Residential — 3 Zoning District.
§ 5-2-8 — (SR-4) Single Family Residential — 4 Zoning District.
§ 5-2-9 — (SR-5) Single Family Residential — 5 Zoning District.
§ 5-2-10 — (SR-7) Single Family Residential — 7 Zoning District.
§ 5-2-11 — (DR-8) Duplex Residential — 8 Zoning District.
§ 5-2-12 — (TR-10) One and Two Family Residential — 10 Zoning District.
§ 5-2-13 — (MR-15) Multi-Family Residential — 15 Zoning District.
§ 5-2-14 — (MR-30) Multi-Family Residential — 30 Zoning District.
§ 5-2-15 — (MH-7) Mobile Home Residential — 7 Zoning District.
§ 5-2-21 — (NMU) Neighborhood Mixed Use Zoning District.
§ 5-2-22 — (I) Institutional Zoning District.
§ 5-2-23 — (SMU) Suburban Mixed-Use Zoning District.
§ 5-2-24 — (UMU) Urban Mixed-Use Zoning District.
§ 5-2-25 — (CMU) Central Mixed-Use Zoning District.
§ 5-2-26 — (IOA) Intensive Outdoor Activity Zoning District.
§ 5-2-30 — (BP) Business Park Zoning District.
§ 5-2-31 — (LI) Light Industrial Zoning District.
§ 5-2-32 — (HI) Heavy Industrial Zoning District.
§ 5-2-34 — (PD) Planned Development Zoning District.
§ 5-3-3 — Regulations applicable to all land uses.
§ 5-3-5 — Table of Land Uses.
§ 5-3-6 — Residential Land Uses.
§ 5-3-8 — Institutional land uses.
§ 5-3-9 — Commercial land uses.
§ 5-3-11 — Industrial land uses.
§ 5-3-13 — Transportation land uses.
§ 5-3-14 — Telecommunication land uses.
§ 5-3-16 — Energy production land uses and structures.
§ 5-3-17 — Accessory land uses and structures.
§ 5-3-18 — Temporary uses.
§ 5-4-5 — Projections into required yards.
§ 5-6-5 — (AP-O) Airport Overlay Zoning District.
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){6} — CERTIFICATE OF COMPLIANCE
5-6-6(2){11} — DEVELOPMENT
5-6-6(2){14} — EXISTING MANUFACTURED HOME PARK
5-6-6(2){15} — EXPANSION TO MANUFACTURED HOME PARK
5-6-6(2){27} — FLOODPLAIN ZONING VARIANCE
5-6-6(2){39} — NEW CONSTRUCTION
5-6-6(2){49} — START OF CONSTRUCTION
§ 5-7-2 — Group and large development standards.
§ 5-7-3 — Exterior building design standards.
§ 5-7-4 — Design standards for single- and two-family uses.
§ 5-7-5 — Design standards for multifamily uses.
§ 5-7-6 — Design standards for commercial uses and mixed-use buildings.
§ 5-7-8 — Design standards in the Historic Preservation Overlay District.
§ 5-7-11 — Off-street parking and traffic circulation.
§ 5-7-26 — Exterior storage and screening standards.
§ 5-7-27 — Fencing standards.
§ 5-7-31 — Vibration standards.
§ 5-7-33 — Air pollution standards.
§ 5-7-34 — Odor standards.
§ 5-7-35 — Glare and heat standards.
§ 5-8-6 — Standards for rain gardens and bioswales.
§ 5-9-1 — Purpose.
5-9-3(1){1} — SIGN
§ 5-9-5 — Definitions and rules related to sign groups, sign categories, and sign types.
§ 5-9-27 — Sign permit application, enforcement, and revocation.
§ 5-9-33 — Appearance, construction and maintenance of signage.
§ 5-10-2 — Exempt activities.
§ 5-10-28 — Conditional use permit procedures.
§ 5-10-40 — Interpretations.
§ 5-10-44 — Violations and penalties.
Ch 5-11 — Stormwater Management and Construction Site Erosion Control
§ 5-11-1 —
5-11-1(3){5} — CEASE-AND-DESIST ORDER
5-11-1(3){7} — CONSTRUCTION SITE
5-11-1(3){13} — EROSION AND SEDIMENT CONTROL PLAN
5-11-1(3){15} — FINAL STABILIZATION
5-11-1(3){22} — LAND-DISTURBING CONSTRUCTION ACTIVITY
5-11-1(3){33} — PERMIT
5-11-1(3){36} — POST-CONSTRUCTION
5-11-1(3){37} — PRE-DEVELOPMENT
5-11-1(3){42} — SEPARATE STORM SEWER
5-11-1(3){43} — SITE
5-11-1(3){44} — STOP-WORK ORDER
5-11-1(3){45} — STORMWATER MANAGEMENT PLAN
§ 6-1-4 — Procedure for subdividing.
§ 6-2-1 — Preliminary plat procedure.
§ 6-2-2 — Preliminary plat specifications.
§ 6-3-1 — Agreement for installation of improvements.
§ 6-3-4 — Storm sewers.
§ 6-3-7 — Construction and grading plans.
§ 6-3-9 — Later sewer hookup costs.
§ 6-6-6 — Improvements.
§ 7-2-1 — Wisconsin Administrative Code adopted.
§ 7-4-1 — Rapid entry key lock box system.
§ 7-5-2 — Applicability.
7-5-4{10} — NEW OUTDOOR WOOD FIRED FURNACE
7-5-4{15} — REFUSE
§ 7-5-8 — Outdoor wood-fired furnaces.
§ 7-6-1 — Purpose.
§ 8-1-6 — Liquid/solid discharges, dumping or spills prohibited.
§ 8-1-7 — Emptying of drains and sewers.
§ 8-1-8 — Cesspools and privies.
8-2-3{3} — CONSTRUCTION ACTIVITY
8-2-3{9} — MS4
§ 8-2-5 — Illegal connections.
§ 8-2-7 — Industrial or construction activity discharges.
8-3-2{10} — RUBBLE
§ 8-4-3 — Connections and installations.
§ 8-4-11 — Private well abandonment.
8-5-1{26} — PUBLIC SEWER
8-5-1{28} — REPLACEMENT COSTS
§ 8-5-3 — Compliance with state laws.
§ 8-5-5 — Sewer construction and connection requirements.
§ 8-5-6 — Use of the public sewers.
§ 8-5-13 — General regulations.
§ 8-5-15 — Amount of sewer service charges.
§ 8-5-18 — Validity.
§ 8-7-3 — Authority.
8-7-4{1} — DEVELOPED PROPERTY
§ 9-2-22 — Possessing chickens and rabits.
§ 9-4-14 — Barbed wire and electric fences.
§ 9-4-20 — Nuisance noise and sound levels regulation.
9-4-20(B){6} — CONSTRUCTION
§ 11-1-1 — Improvements; plans and specifications.
§ 11-1-2 — Permits required.
§ 11-1-8 — Installation of public utility facilities.
§ 11-1-9 — Construction and repair of sidewalks.
§ 11-4-2 — Planting program.
§ 11-4-4 — Activities of utility companies controlled.
11-6-4{33} — MANAGER
11-6-4{55} — STANDARD CONSTRUCTION SPECIFICATIONS
11-6-4{57} — STRUCTURE
§ 11-6-9 — Leases.
§ 11-6-15 — Vehicular traffic regulation.
§ 11-6-17 — Building regulations.
add
Contagious diseases
§ 8-1-2 — Communicable diseases.
add
Convalescent homes
§ 5-3-8 — Institutional land uses.
add
Corrugated cardboard
§ 7-5-6 — Materials that may not be burned except with permit.
add
Costs and expenses
§ 1-4-2 — Costs.
§ 1-6-1 — General provisions and requirements.
§ 1-6-8 — Building inspector.
§ 1-7-1 — Salaries.
§ 1-15-5 — Standards of conduct.
§ 1-16-5 — Public access to records.
§ 2-1-5 — Duties and powers.
§ 2-2-4 — Taxpayer's duty to provide information.
§ 2-2-5 — Confidentiality of information provided to Assessor.
§ 3-4-3 — General licensing requirements.
§ 3-5-4 — Procedure for revocation or suspension.
§ 3-5-5 — Procedure for refusal to issue or renew license.
§ 3-7-4 — Application for permit.
§ 3-9-4 — Streatery permit.
§ 3-12-9 — Fee assessment.
§ 3-13-9 — Application for permit.
§ 3-13-11 — Investigation and issuance.
§ 3-14-4 — Allocation of tax.
§ 3-15-1 — Declaration of purpose.
§ 3-15-11 — Fees for answering alarms.
§ 3-15-12 — Revocation of permits.
§ 4-1-7 — Permits required.
§ 4-1-14 — Powers and duties of building inspector.
§ 4-1-21 — Unsafe buildings or structures.
§ 4-2-6 — Safe and sanitary maintenance of property.
§ 5-3-14 — Telecommunication land uses.
§ 5-3-16 — Energy production land uses and structures.
§ 5-3-17 — Accessory land uses and structures.
§ 5-5-4 — Nonconforming structures.
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
5-6-6(2){51} — SUBSTANTIAL DAMAGE
§ 5-7-2 — Group and large development standards.
§ 5-7-46 — Administration and enforcement.
§ 5-8-7 — Installation requirements.
§ 5-9-27 — Sign permit application, enforcement, and revocation.
§ 5-9-37 — Removal of sign and sign structures where business is no longer in operation.
§ 5-10-28 — Conditional use permit procedures.
§ 5-10-43 — Administration and enforcement of performance standards.
§ 5-10-44 — Violations and penalties.
§ 5-11-1 —
5-11-1(3){24} — MAXIMUM EXTENT PRACTICABLE
§ 6-2-3 — Final plat requirements and procedures.
§ 6-3-1 — Agreement for installation of improvements.
§ 6-3-3 — Water.
§ 6-3-4 — Storm sewers.
§ 6-3-5 — Sanitary sewers.
§ 6-3-9 — Later sewer hookup costs.
§ 6-3-10 — Reimbursement for sewer lines exceeding requirements.
§ 6-3-11 — Underground installation of utility services.
§ 6-3-13 — Extension of improvements not in proposed subdivision.
§ 6-4-5 — Minimum street surface widths.
§ 7-2-3 — Dry grass, weeds, bushes or foliage.
§ 7-5-12 — Liability.
§ 7-5-14 — Enforcement and penalties.
§ 8-1-1 — Abatement of nuisances.
§ 8-1-9 — Sewer and water main connections.
§ 8-2-8 — Best management practices.
§ 8-2-10 — Access and inspection of properties and facilities.
§ 8-2-12 — Notice of violation and appeal.
§ 8-2-13 — Enforcement and penalties.
§ 8-3-4 — Source separation and preparation required.
§ 8-3-5 — Garbage collection and disposal.
§ 8-4-3 — Connections and installations.
§ 8-4-4 — Cross-connections.
8-5-1{22} — OPERATION AND MAINTENANCE COSTS
8-5-1{28} — REPLACEMENT COSTS
8-5-1{33} — SEWER SERVICE CHARGE
§ 8-5-3 — Compliance with state laws.
§ 8-5-5 — Sewer construction and connection requirements.
§ 8-5-7 — Use of the public storm sewers.
§ 8-5-9 — Special arrangements.
§ 8-5-13 — General regulations.
§ 8-5-14 — Basis for sewer service charges.
§ 8-5-15 — Amount of sewer service charges.
§ 8-5-16 — Billing practice.
§ 8-5-19 — Audit, notification, and records.
§ 8-5-21 — Discharges causing damage.
§ 8-5-22 — Penalty.
§ 8-5-23 — Liability to the city for losses.
8-6-1{1} — CLEANUP COSTS
§ 8-6-3 — Failure to clean up.
§ 8-6-4 — Schedule of charges.
8-7-4{9} — STORM WATER UTILITY
§ 8-7-5 — Basis of storm water utility charges.
§ 8-7-6 — Equivalent runoff unit.
§ 8-7-9 — Credits and adjustments.
§ 8-7-11 — Budget and excess revenues.
§ 9-2-23 — Impoundment of animals.
§ 9-2-24 — Release from impound.
§ 9-3-3 — Class 1 forfeiture.
§ 9-3-4 — Class 2 forfeiture.
§ 9-3-5 — Class 3 forfeiture.
§ 9-3-6 — Class 4 forfeiture.
§ 9-3-7 — Class 5 forfeiture.
§ 9-4-15 — Noxious weeds.
§ 9-4-20 — Nuisance noise and sound levels regulation.
§ 9-4-36 — Truancy, habitual truancy, dropout, and contributing to truancy.
§ 9-5-2 — Impoundment and disposition of abandoned vehicles.
§ 10-2-3 — General parking regulations.
§ 10-2-5 — Parking during snow removal.
§ 10-2-8 — Penalties.
§ 10-2-9 — Enforcement.
§ 10-7-6 — Penalties.
§ 11-1-8 — Installation of public utility facilities.
§ 11-1-10 — Sidewalk maintenance.
§ 11-2-3 — Numbering plan.
§ 11-3-3 — Dog park provisions.
§ 11-4-1 — Powers of city forester.
§ 11-4-3 — Removal of trees.
§ 11-5-5 — Abatement of nuisances.
§ 11-5-6 — Assessment of costs of abatement.
§ 11-6-9 — Leases.
§ 11-6-10 — Airport operation.
§ 11-6-11 — Aircraft operation.
§ 11-6-13 — Airport activity clubs.
§ 11-6-15 — Vehicular traffic regulation.
§ 11-6-17 — Building regulations.
add
Crosswalks
§ 3-7-8 — Regulation of transient merchants.
§ 3-9-3 — Sidewalk cafe permit.
§ 5-3-9 — Commercial land uses.
§ 6-4-2 — Street and block layout.
§ 10-2-6 — Pedestrian safety.
§ 10-3-3 — Bicycle regulations.
§ 11-1-5 — Warning signs, barricades required.
add
Culverts
1-3-2{24} — STRUCTURE
§ 5-6-6 — (FP-O) Floodplain Overlay Zoning District.
§ 5-11-1 —
§ 6-2-2 — Preliminary plat specifications.
§ 6-3-4 — Storm sewers.
§ 11-1-6 — Bridges or platforms in right of way.
add
Curbs
§ 3-9-3 — Sidewalk cafe permit.
§ 3-9-4 — Streatery permit.
§ 4-1-16 — Street encroachments.
5-1-22{172} — STREET TERRACE
§ 5-3-9 — Commercial land uses.
§ 5-3-11 — Industrial land uses.
§ 5-3-17 — Accessory land uses and structures.
§ 5-7-9 — Vehicle access standards.
§ 5-7-11 — Off-street parking and traffic circulation.
§ 5-7-17 — Outdoor recreational space requirements.
§ 5-7-26 — Exterior storage and screening standards.
§ 5-8-4 — Landscaping requirements.
§ 5-9-5 — Definitions and rules related to sign groups, sign categories, and sign types.
§ 5-9-30 — Sign prohibitions and limitations.
§ 5-11-1 —
5-11-1(3){42} — SEPARATE STORM SEWER
§ 6-1-4 — Procedure for subdividing.
§ 6-3-2 — Roadways.
§ 6-4-7 — Intersections.
§ 7-5-7 — Open burning of leaves, brush, clean wood and other vegetative debris.
§ 7-6-3 — Minimum fire hydrant specifications.
8-2-3{9} — MS4
§ 8-3-4 — Source separation and preparation required.
§ 8-3-5 — Garbage collection and disposal.
8-4-1{2} — CURB BOX
8-4-1{4} — LATERAL MAIN
8-4-1{5} — SERVICE PIPE
§ 8-4-3 — Connections and installations.
§ 8-5-2 — Sewer classifications.
§ 8-5-5 — Sewer construction and connection requirements.
10-1-1{5} — BICYCLE LANE
§ 10-2-3 — General parking regulations.
§ 10-2-6 — Pedestrian safety.
§ 10-3-3 — Bicycle regulations.
§ 11-1-6 — Bridges or platforms in right of way.
§ 11-1-8 — Installation of public utility facilities.
§ 11-1-9 — Construction and repair of sidewalks.
§ 11-4-2 — Planting program.
§ 11-5-5 — Abatement of nuisances.
add
Curfew
§ 9-4-34 — Curfew.
9-4-34(A){1} — CURFEW HOURS
§ 9-4-36 — Truancy, habitual truancy, dropout, and contributing to truancy.