[Adopted 6-6-1977 by Ord. No. 5-1977]
In addition to the building permit, the Building Inspector shall
issue a placard which shall be displayed on the premises during the
time construction is in progress. This placard shall show the number
of the building permit and the date of its issuance and shall be signed
by the Building Inspector.