[Adopted 10-5-2005 (Ch. VI, Art. 1, of the 1975 Code)]
No building permit required by the Building Code shall be valid
until the building permit fees have been paid.
Building permit fees are calculated by the Building Official
based on the estimated cost of construction determined in a manner
established by the Board of Selectmen multiplied by a rate established
by the Board of Selectmen.
Town projects are exempt from permit fees but must have permits
as required by the Building Code.
There are no fees charged for certificates of occupancy.