Permit. No awning shall be erected or constructed
until a permit has been issued by the Construction Official and the
bond, if required, shall have been filed.
Plans and specifications. Prior to the issuance of
a permit, plans and specifications showing the dimensions, materials
and required details of construction, including loads, stresses and
anchorage, shall be filed with the Construction Official.
Owner's consent. All applications for the erection
or construction of an awning shall be accompanied by the written consent
of the owner or lessee of the premises upon which the awning is to
be erected.
Alterations. No awning shall be enlarged or relocated
except in accordance with the provisions of this chapter. The changing
of movable parts of an approved awning that is designed for such changes
or the repainting or reposting of display matter not been deemed an
alteration, provided that the conditions of the original approval
and the requirements of this chapter are not violated.
Material. All awnings shall be made of canvas, cloth
or similar material and shall be forest green in color as such color
is defined by Pantone Matching System 349. Such awning shall not be
backlighted.