Whenever a term, word or phrase is used in this chapter and is defined in N.J.S.A. 40:55D-1 et seq., or in Chapter
160, Zoning, of this Code, such term, word or phrase is intended to have the meaning set forth in the definition of such term, word or phrase as found in said statute, or in this Code, unless a contrary intention is clearly expressed from the context of this chapter.
[Amended 3-8-2016 by Ord.
No. 6-2-2016]
A. Prior to the issuance of any permit by the Construction Official
or the Zoning Officer of the Township for clearing, excavation, construction,
renovation, alteration or expansion of any building, structure, or
regulated use within any zoning district within the Township, site
plan approval for the proposed development must be obtained from the
Planning Board or Zoning Board of Adjustment, as the case may be,
if the proposed earthmoving, site work, building, structure, or use
affects drainage, parking layout, parking requirements, internal traffic
circulation, disturbance of existing buffer areas or buffer landscaping,
access to the street or highway, freestanding signage, or significant
changes to lighting. Site plan waiver; requirement for approval: The
reviewing board may waive site plan approval requirements if the construction
or alteration or change of occupancy or use does not affect circulation,
parking demands, drainage, relationships of buildings to each other,
landscaping, buffering, lighting and other considerations of site
plan review. In the event an application is filed for a waiver of
site plan review, sufficient information must be contained within
the application for the Board to grant any such approval.
[Amended 3-10-2021 by Ord. No. 13-3-2021]
B. Site plan approval must also be obtained if any of the following
conditions are met. The determination as to whether any of these conditions
trigger the requirement for a site plan application shall be made
by the Township Manager or his/her designee prior to the issuance
of a zoning permit by the Zoning Officer.
(1) A change of use from one nonresidential use to another; or
(2) If the number of existing parking spaces on the site is less than
the number of spaces required for the proposed use; or
(3) For the conversion of a residential use to a nonresidential use.
C. Site plan approval is not required for single-family detached dwellings
in residential zones, private swimming pools, private garages, or
other accessory buildings on single-family residential lots.
D.
(1) A change of tenant or user for a conforming use, whether or not it
is the same use or a change of use, when the new tenant or user will
occupy 25% or less of the gross floor area (GFA) within a multitenant
shopping center, office building, or industrial building, or for a
single-use building that is less than 8,000 square feet, provided
that there are no other changes proposed to the approved site plan
and provided that the multitenant shopping center or building is at
least fifty-percent occupied (excluding the area subject to the application).
In this case, the zoning permit application will be reviewed by the
Township Manager or his/her designee prior to the issuance of same
by the Zoning Officer. The review will consider whether the current
site conditions are consistent with the approved site plan for the
property, as well as matters of public health, welfare, and safety.
(2) If §
127-2D(1) is satisfied and the only site plan changes proposed relate to the updating of ADA parking and access requirements, repaving, lighting, landscaping, signage, trash enclosures, and/or facade alterations, and if the updating of the parking and access requirements will not create changes to the circulation patterns and will not reduce the total number of parking spaces on the site below the number required by the Zoning Ordinance, then the changes may be reviewed and approved administratively by the Department of Community Development, subject to such conditions as may be reasonably appropriate given the circumstances, prior to the issuance of a zoning permit by the Zoning Officer.
(3) The exception in §
127-2D(1) does not apply if there is no approved site plan on file at the Township.
(4) Within the C-3 Zoning District, when there is a change of tenant
or use for a conforming use, whether or not it is the same use or
a change of use and the building or space consists of 2,500 square
feet or less, provided that a current survey is provided with the
zoning permit application, together with a plan prepared by a professional
engineer. The plan must show any necessary site improvements such
as updating of ADA parking and access requirements, repaving, lighting,
landscaping, signage, trash enclosures, and/or facade alterations,
and must demonstrate that the revisions will not alter access from
the street or highway, and will not reduce the total number of parking
spaces on the site below the number required by a prior site plan
approval or by the zoning ordinance if there is no site plan on file.
In this case, the proposed change of use or change of tenant may be
reviewed and approved administratively by the Department of Community
Development, subject to such conditions as may be reasonably appropriate
given the circumstances, prior to the issuance of a zoning permit
by the Zoning Officer. If stormwater management review is required,
the applicant must make a site plan application.
(5) The review of the zoning permit application in the instances above
shall relate to conformance with the existing approved site plan and
improvements necessary to advance public health, welfare, and safety.
(6) In the event that the permittee fails to meet the conditions set
forth in the zoning permit, and in the further event that the Township
is required to intervene to install improvements, any costs incurred
by the Township in the implementation of the conditions or the construction
of improvements may be imposed as a lien on the subject property.
(7) The cost for the administrative review by the Department of Community
Development shall be the responsibility of the applicant as set forth
in § 94-19B(4) for a minor site plan.
The applicant shall submit, with the original submission of plans and application, a traffic study impact report prepared in accordance with the provisions of Article
VI of Chapter
15, Land Use Administration, of this Code. Said report shall be reviewed and considered by the Board in accordance with the provisions of said Chapter
15, Article
VI.
Approval of the site plan shall be granted by
the Board upon its determination that the site plan complies with
all ordinances of Evesham Township, the Master Plan of Evesham Township
and all other official maps such as the Zoning Map, the Plan of Proposed
Right-of-Way Widths or others as may be in existence at the time of
the application, and with the following standards and regulations:
A. The applicant shall submit a site plan containing
all of the information provided for in this article.
B. The details of the site plan shall be in accordance with the design and construction standards of Evesham Township set forth in Chapter
62, Subdivision and Site Plan Design Standards, of this Code.
C. All parking and traffic problems shall be kept at
a minimum.
D. Soil and subsoil conditions shall be suitable for
excavation and site preparation.
E. The topography of the site and its drainage shall
be suitable for the proposed development and designed to prevent flooding
and erosion.
F. Natural features, such as lakes, streams, rock outcrops,
topsoil, trees and shrubs, shall be preserved where possible and incorporated
into the final landscaping.
G. Skillful treatment of vegetation in the development
of sites shall be required.
H. Trees shall be designated as approved by the Board or in accordance with standards set forth in Chapter
62, Subdivision and Site Plan Design Standards, of this Code.
I. Seeding, sodding, or other planting shall be applied
to stabilize topsoil and enhance the appearance of open areas when
not wooded or naturally covered.
J. Adequate provisions shall be made to prevent any drainage
problems, and, where adequate surface drainage is not possible or
advisable, a supplementary drainage system conforming to Township
standards and approved by the Township Engineer will be required.
K. A landscaped buffer strip shall be established along lot lines which abut a residential district, as required in Chapter
160, Zoning, of this Code.
L. All parking areas and access drives shall be surfaced
and drained in accordance with Township specifications.
M. A maximum of two drives shall be permitted to provide
access to parking areas for each 150 feet of street frontage, except
that no such driveway shall be located closer than 100 feet to the
intersection of any street intersection.
N. All drive openings shall be at least 24 feet but not
more than 40 feet in width.
O. There shall be acceleration and deceleration lanes
as may be required by the Board.
P. Parking lots shall be suitably landscaped both within
the lot and around the perimeter to enhance the appearance of the
total site. Trees shall be provided within the parking lots, as well
as landscape areas and dividers, in order to accomplish this objective.
At least one tree may be required within the parking lot for each
20 parking spaces approved by the Board.
Q. Topsoil shall not be removed from the site during
construction but shall be stored and redistributed to areas most exposed
to view by occupants and the public, and such areas shall be seeded
or planted.
R. Other standards and conditions pertaining to curbing,
driveways, parking areas, pedestrian walks, landscaping and planting
not otherwise specified herein may be attached as conditions by the
Board.
S. Reasonable screening, at all seasons of the year,
of all playgrounds and parking and service areas, from the view of
adjacent properties and streets, including any company office or individual
office, shall be provided, where necessary, for the purpose of protecting
the health, safety, general welfare, comfort, and convenience of the
public.
T. The location, intensity, power, direction and time
of any outdoor lighting shall not have an adverse effect upon any
properties in adjoining residential districts by impairing the established
character of potential use of properties in such districts.
U. The use shall not be detrimental to the public good
and will not substantially impair the intent and purpose of all applicable
ordinances of the Township, including this chapter.
V. The proposed construction submitted for site plan
approval must be completed in all respects, as provided for hereinabove,
within two years from the date of final approval of the site plan
by the Planning Board, or as otherwise directed by the Planning Board.
Failure of the applicant to complete construction within such period
will nullify and void the site approval heretofore granted for the
premises as if no site approval had ever been granted for the plans,
and said applicant will be in violation of this article if any construction
or excavation is undertaken or continued after the expiration of the
approval.
W. Fire hydrant size, type and locations shall be reviewed
by the Evesham Township Bureau of Fire.
X. Parking in any congested areas shall be subject to
review and regulation by the Evesham Township Bureau of Fire.
Y. All plans shall be submitted for review to the Evesham
Township Bureau of Fire for a recommendation in writing to the Board,
for consideration and incorporation in the preliminary and/or final
approval.
Final site plan approval shall be in accordance with the criteria set forth in §§
127-3 and
127-6 with respect to preliminary site plans and shall set forth those conditions and requirements imposed by the Planning Board at the time of preliminary approval.
At the time of the submission of the preliminary and final site plan, the applicant shall pay an application fee and shall deposit the review escrows required by Chapter
94, Land Use Regulations, of this Code. Prior to commencement of construction or as a condition of final approval, the applicant shall deposit, in escrow, the professional inspection funds required by Chapter
94, Land Use Regulations, of this Code.
A public hearing shall be required on all preliminary site plan applications, except minor site plans. A public hearing shall not be required for final site plan applications. Public notice of a required hearing shall be given in the manner prescribed in Chapter
15, Land Use Administration.
In the Pinelands Area of Evesham Township, all applications for development approval reviewed under this article shall comply with the development standards of Chapter
160, Zoning, of the Code of the Township of Evesham and also shall comply with the review procedures of Chapter
15, Land Use Administration, of the Code of Evesham Township.