Three copies of said Standards for Individual
Subsurface Sewage Disposal Systems have been placed on file in the
office of the Secretary, Clerk or other similar officer of this Township
Council upon the introduction of this chapter and will remain on file
in said office for the use and examination of the public.
In addition to the standards adopted by reference
herein, no holding tanks shall be installed or placed in use until:
A. The person applying for the permit required in the
code presents a contract with a person or firm licensed by the State
of New Jersey to haul sewage sludge, which indicates that said hauler
has access to primary and secondary sewage disposal facilities. The
Township of Evesham must be named as a party to the contract with
the right to compel enforcement of the contract.
B. The holding tank installed must have a clearly visible
flashing light alarm which flashes when the capacity of the holding
tank is 3/4 full and greater.
The Director of Health may order all further
work in and about any individual sewage disposal system which is being
erected or installed in violation of the code to be stopped forthwith,
except such work as shall be necessary to remedy such violation of
any of the provisions of the code. After issuance of any such order
and the service of a copy thereof upon any person connected with or
working in and about the erection or installation of any such disposal
systems or any part thereof, no further work shall be done thereon,
except as aforesaid.
There shall be an application fee as specified in Chapter
72 of this Code for operating and renewal licenses pursuant to the standards adopted by reference herein.
Any person, persons, firm or corporation violating any requirement of the provisions of the standards adopted by reference herein or of this chapter shall be punishable as provided in Chapter
1, General Provisions, Article
I, of this Code.