In considering applications for subdivision of land, the Planning Board shall be guided by the standards set forth hereinafter. Said standards shall be considered to be minimum requirements and shall be waived by the Board only under circumstances set forth in Article
VI herein.
[Added 8-9-1979]
The subdivider may be required to submit evidence
satisfactory to the Planning Board that lots shall be adequate and
suitable for on-site septic system and water supply or that sewage
and water supply can be otherwise adequately and suitably provided.