[Amended 4-22-2019 by L.L. No. 2-2019]
The regulations for each district pertaining to minimum lot width, maximum building coverage, minimum front yard depth, minimum rear yard depth and maximum height shall be as specified in this section, subject to the further provisions of Article
III. The definitions of terms used in these regulations are as follows:
A. Lot width is defined as contiguous linear feet of road frontage.
B. Front setback is the distance from the edge of the right-of-way line
to the closest point of the building.
C. Side setback is the distance from the closest point of the building
to the side property line.
D. Rear setback is the distance from the closest point of the building
to the rear property line.
District
|
Minimum Requirements
|
Maximum Requirements
|
---|
Lot Size*
|
Lot Width
(feet)
|
Front Setback
(feet)
|
Side Setback
(feet)
|
Rear Setback
(feet)
|
Building Height
(feet)
|
---|
Residential (R)
|
12,000 square feet
|
100
|
30
|
10
|
35
|
35
|
Agricultural/Residential (AR)
|
20,000 square feet
|
100
|
30
|
10
|
35
|
35
|
Bay Front (BF)
|
|
|
|
|
|
|
Residential
|
12,000 square feet
|
100
|
30
|
10
|
35
|
35
|
Nonresidential
|
3 acres
|
200**
|
30
|
10
|
35
|
35
|
Central Business (CBD)
|
|
|
|
|
|
|
Residential
|
12,000 square feet
|
100
|
***
|
10
|
35
|
35
|
Nonresidential
|
5,000 square feet
|
50
|
***
|
0
|
0
|
35
|
Special Development (SDD)
|
3 acres
|
100†
|
45†
|
10†
|
35†
|
35†
|
Accessory buildings
|
NA
|
NA
|
Not permitted
|
10
|
10
|
20
|
NOTES:
|
*
|
Subject to approval for waste disposal by County Health Department.
|
**
|
Water frontage.
|
***
|
See build-to line requirements in § 150-8D
|
†
|
These Agricultural/Residential District dimensional requirements
apply to Special Development Districts
|
The provisions of §
150-9 shall not prevent the construction of a single-family dwelling, provided that the yard requirements are observed, on any lot which was lawful when created and which, prior to the effective date of this chapter, was in separate ownership duly recorded by plot or deed.
[Amended 4-22-2019 by L.L. No. 2-2019]
Maximum height regulations shall not apply to farm buildings,
church spires, chimneys or other structures built above the roof and
not devoted to human occupancy.
The erection, construction, alteration or maintenance
by public utilities or Village or other governmental agencies of underground
or overhead gas, electrical or water transmission or distributions
systems or communication systems, including poles, wires, mains, drains,
sewers, pipes, conduits, cables, fire alarm boxes, police call boxes,
traffic signals, hydrants and other similar equipment and accessories
in connection therewith, reasonably necessary for the furnishings
of adequate service by such public utilities or Village or other Village
or other governmental agencies or for the public health or safety
or general welfare will be permitted, but not including buildings.
On a corner lot, the street side yard shall
equal the required front yard for lots facing the street.
[Added 4-22-2019 by L.L.
No. 2-2019]
For all zoning districts, only one principal structure shall
be permitted per parcel of land. Additionally, no permanent accessory
buildings shall be placed on a parcel of land without a principal
structure already present on said parcel of land. A temporary accessory
building may be permitted on a parcel of land without a principal
structure with approval of a special use permit from the Planning
Board. The Planning Board, as part of its approval of the special
use permit, shall establish a time limit for a temporary accessory
building; and at the end of such time a principal building shall be
placed on the parcel of land or the temporary accessory building must
be removed.