No regulated earth disturbance activities within
the Borough shall commence until approval by the Borough of the BMP
operations and maintenance plan which describes how the permanent
(e.g., postconstruction) stormwater BMPs will be properly operated
and maintained.
It shall be unlawful to alter or remove any
permanent stormwater BMP required by an approved BMP operations and
maintenance plan or to allow the property to remain in a condition
which does not conform to an approved BMP operations and maintenance
plan unless an exception is granted in writing by the Borough.
Stormwater management easements shall be provided by the property owner if necessary for access for inspections and maintenance or for preservation of stormwater conveyance, infiltration, detention areas and other BMPs by persons other than the property owner. The purpose of the easement shall be specified in any agreement under §
225-32.