Preliminary plans for a park, all or part of
which are situated in the Township, shall be reviewed by the Township
Planning Commission and the Centre Regional Planning Commission and
shall be approved or not approved by the Township Council in accordance
with the procedures specified in this article. All plans shall be
reviewed in two stages, preliminary and final.
All plans submitted for preliminary review shall
be drawn to a scale of one inch equals 100 feet or larger (e.g., one
inch equals 30 feet) and shall contain the following information:
A. General data.
(1)
The name of the proposed park.
(3)
A graphic scale and legend describing all symbols
shown on the plan.
(4)
The day, month and year that the plan was prepared
and the date and a description of revisions to the plan occurring
after initial submission.
(5)
The name and address of the owner and deed book
and page numbers of the deeds conveying the property to the owner.
The name of the developer and his billing address if different.
(6)
The name and address of the individual or firm
preparing the plan.
(7)
The names of abutting property owners, their
mailing addresses, tax parcel numbers and deed book and page numbers.
(8)
A key map showing the location of the proposed
development and all roads within 5,000 feet therefrom.
(9)
The Centre County tax parcel numbers of all
parcels included in the planned research and business park development.
B. Existing features:
(1)
Perimeter boundaries of the total property,
showing bearings to the nearest minute and distances to the nearest
hundredth of a foot.
(2)
Total acreage of the property and total square
feet within each lot of the development.
(3)
Natural features:
(a)
Sinkholes, watercourses, tree masses and unique
vegetation or natural features.
(b)
Floodplains and steep slopes, as defined in Chapter
200, Zoning.
(c)
Topographic contour lines at vertical intervals
of two feet for land with average undisturbed slope of 4% or less
and at intervals of five feet for land with average natural slopes
exceeding 4%, including the source of topographic data.
(4)
Approximate location of man-made features in
or within 100 feet of the property, including:
(a)
Sewer lines and laterals.
(b)
Water mains and fire hydrants.
(c)
Electrical lines and poles.
(g)
Streets, including right-of-way and cartway
widths and approximate grades.
C. Proposed development.
(1)
The approximate location, total ground floor
area, total floor area, height and use of buildings and other structures.
(All area dimensions shall be indicated in square feet.)
(2)
The approximate location and area of driveways
and parking and loading areas.
(3)
The property lines of lots to be subdivided,
measured to the nearest foot.
(4)
The approximate locations of sidewalks and walkways,
including widths, surfacing materials and ramps for the handicapped.
(5)
The approximate location of utility and drainage
easements.
(6)
The approximate location and pipe diameter of
sewer and water mains.
(7)
The following regional fire protection requirements.
[Amended 9-4-2003 by Ord. No. O-03-16]
(a)
The applicant shall contact the Water Authority
to obtain fire flow rates for the water system serving the proposed
subdivision or land development. These flow rates shall be provided
as a note on the plan submitted to College Township.
(b)
All plans shall provide the size of all existing
and proposed waterlines and fire hydrants in, and adjacent to, the
proposed subdivision or land development.
(c)
The location, construction detail(s) and ownership
information of any water storage system shall be provided in the plan
detail sheets. (Approved design specifications for underground storage
tanks may be obtained from the Centre Region Fire Administrator.)
(d)
Setbacks and/or building separations shall be
graphically noted on all plans.
(e)
Details for all existing and proposed fire apparatus
access routes.
(f)
Details for all existing and proposed Fire Department
connections and hydrants.
(g)
The plan shall provide a note indicating if
any structure within the proposed development will have a built-in
fire suppression system, including but not limited to automatic fire
sprinkler systems.
(8)
Perimeter setbacks and required buffer yards.
(9)
Street information, including:
(a)
The location and width of right-of-way and cartways.
(c)
Approximate road profiles along the center line
of each proposed street, showing finished grade at a scale of one
inch equals 50 feet horizontal and one inch equals five feet vertical.
(d)
Vegetation to be planted between the curb or
shoulder and the right-of-way line.
(10)
A conceptual landscaping plan indicating the
treatment of materials and landscaping concepts used for private and
common open space.
(11)
A general grading plan showing any major alterations
to the topography of the site.
(12)
Property owners’ association requirements as set forth in §
180-9A(17) of the College Township Code.
[Added 7-21-2005 by Ord. No. O-05-11]
D. Open space.
(1)
The approximate location and area of the proposed
open space.
(2)
The proposed use and improvements of open space.
(3)
The approximate location and use of common recreational
facilities and structures.
(4)
The approximate location and area of land to
be dedicated for public purposes, if any.
E. Density calculation.
(1)
A table shall be included on the plan describing
each phase or section with quantitative data, including the following:
(a)
The total area of the development and approximate
area of each phase.
(b)
The total area devoted to uses, the approximate
number of units, the percentage of each type of use and the total
floor area in the development and in each phase.
(c)
Floor area ratio (FAR) per acre in the development
and each phase.
(d)
The area of streets, parking, sidewalks and
walkways and the total area paved and percent of area paved or covered
by structures in the development and each phase or section.
(e)
The total acreage and percent of acreage in
open space in the development and each phase.
(f)
The total area devoted to planned recreational
use throughout the entire development and in each phase.
(g)
The calculation of impervious surface in the
development and in each phase.
F. Narrative statement. A written statement, including
the following:
(1)
A statement of the ownership of all of the land
included within the development.
(2)
An explanation of the design pattern of the
development.
(3)
A statement describing any proposed innovative
design concepts included in the plan.
(4)
The substance of covenants, grants of easements
or other restrictions proposed to be imposed on the use of land, buildings
and structures, including proposed easements or grants for public
use or utilities.
(5)
A description of the form of organization proposed
to own and maintain the open space, recreational facilities and structures
or other facilities.
(6)
A statement of the proposed use and improvement
of open space and recreational facilities.
(7)
A description of proposals to preserve natural
features and existing amenities and a statement of conceptual landscaping
designs.
(8)
A statement describing the stormwater management
methods to be employed.
G. Development schedule. When a development is proposed
to be submitted for final plan approval in phases over a period of
years, the following shall be included with the application for preliminary
approval:
(1)
The phases in which the development will be
submitted for final plan approval and the approximate date when each
phase will be submitted for final plan approval.
(2)
The approximate date when the development and
each phase will be completed.
H. Preliminary stormwater management plan.
(1)
A preliminary stormwater management plan must be prepared in accordance with the College Township Stormwater Management Ordinance, Chapter
175, although this preliminary plan may have the exceptions described in Subsection
H(2). If these exceptions are taken in the preliminary plan submission, no development shall occur until Township approval is obtained on a stormwater management plan that meets all requirements of Chapter
175.
(2)
The preliminary stormwater management plan for
a planned research and business park may have the following exceptions
from the College Township Stormwater Management Ordinance:
(a)
Calculations for sizing of stormwater piping,
channels and swales are not required. However, the proposed locations
of all stormwater conveyance facilities are required. Construction
specifications are not required.
(b)
Hydrologic routing calculations are not required
for stormwater detention facilities and outlet structures. However,
the amount of storage capacity required for all detention facilities
must be estimated using a method, acceptable to the Township Engineer,
for preliminary sizing of stormwater detention ponds. This estimate
must consider allowable discharge rates from the site, based upon
predevelopment conditions and must also consider downstream constrictions.
The grading plan must demonstrate the size, location and proposed
contours for all detention facilities.
(c)
A soil erosion and sedimentation control plan
is not required.
(d)
A declaration of adequacy is not required from
the Pennsylvania Department of Transportation for use of its stormwater
facilities.
(3)
No other exceptions shall be taken on the preliminary
stormwater management plan without expressed written approval from
the Township Engineer.
I. A transportation impact report, prepared by a qualified
professional shall be submitted and include the following:
(1)
Analysis and description of existing conditions
and traffic volumes for the external road network serving the site.
The external road network to be studied shall be determined by the
municipality prior to the preliminary plan review.
(2)
A base condition analysis shall be prepared
to establish existing levels of service followed by analysis and description
of projected traffic conditions based on the land uses proposed within
the development. Trip generation rates for morning and evening peak
hours of the project shall be prepared, as well as the internal/external
trip distribution and intersection analysis.
(3)
The analysis shall address the traffic impacts
of the proposed development along with surrounding traffic generating
land uses in the area including land use changes. The analysis will
demonstrate the adequacy of the area road network and identify access
and traffic control measure improvements impacted by the proposed
development and surrounding land uses.
(4)
The analysis shall contain recommended internal
and off-site road improvements. These recommended improvements should
be specific as to location and scope of work required along with a
phased schedule for possible implementation. Examples of additional
items that should be included in this section are typical sections
for each category of street and a phasing plan which delineates the
street improvements that will be provided simultaneously with the
construction of each development phase.
(5)
Utilization of alternate modes of transportation
shall be a component of the traffic impact analysis. Evaluation of
traffic mitigation measures as it relates to public transportation
and future site development should also be addressed.
(6)
Revision of the traffic impact study based on
major variations as defined in this chapter, to the approved preliminary
plan shall be required. This shall occur prior to the filing of an
application to amend the preliminary plan, following the procedures
required herein for preliminary plan approval.
J. Signature.
(1)
Signature(s) and seal(s) of a licensed engineer
and/or architect or landscape architect who prepared or supervised
the preparation of the plan.
(2)
Signed, notarized statement by the landowner
certifying ownership of the property.
(3)
Space for approval signatures by the Chairman
and Secretary of the Council and Chairman and Secretary of Planning
Commission, including the date of such approval.
(4)
Add the following note to the plan: "Preliminary
approval shall not authorize construction or the issuance of any building
or zoning permit."
(5)
The Fire Chief's signature.
[Added 9-4-2003 by Ord. No. O-03-16]
K. Fire protection plan procedures.
[Added 9-4-2003 by Ord. No. O-03-16]
(1)
College Township will provide all subdivision
and land development plans, whether preliminary or final, to the Fire
Chief at the time they are provided to the Centre Regional Planning
Agency (CRPA) for review. The deadline for the review and comment
by the Fire Chief shall be the same as the deadline for review and
comment by the College Township Zoning Administrator and the CRPA.
The Fire Chief shall review the plans for the following fire protection
features:
(a)
Fire flow and/or water supply available for
fire fighting.
(b)
The location and available flow of fire hydrants.
(c)
The location, design and capacity of water storage
facilities.
(e)
The location of fire lanes, if needed.
(f)
The location of any Fire Department connections
provided.
(g)
The presence of any built-in fire suppression
systems.
(2)
The Fire Chief shall provide written comments
on the plan to the applicant and College Township within 10 business
days.
(3)
If any revisions are made to the plan following
the Fire Chief's initial review, the plan will be provided to the
Fire Chief three business days prior to the meeting where the plan
will be considered for approval by the College Township Council.
(4)
The Fire Chief shall provide written comments
on any revised plans to the applicant and College Township.
(5)
If the plan is not recommended by the Fire Chief,
the Council may:
(a)
Deny or conditionally approve the plan based
on the conditions listed in the Fire Chiefs comments; or
(b)
Determine that the applicant has adequately
addressed water supply and/or fire apparatus access and approve the
plans.
All record plans shall meet the requirements
of this chapter, as amended, and shall be exact replicas of the final
plan approved by the Township Council.
Plans submitted for land development plan review
shall include all information required in this article.
A. Where applicable, the land development plan shall
meet the plan requirements contained in College Township Ordinance
No. 100, as amended:
(1)
Chapter
180, Subdivision of Land.
(3)
Chapter
175, Stormwater Management.
B. As a condition of approval, the applicant shall permit
the Township to make site inspections of such nature and extent as
is necessary to ensure that the required improvements are being installed
and constructed in conformity with the design standards contained
herein or otherwise specified in the approved plan. The Township shall
make inspections and report on required improvements as specified
in this chapter and shall notify the landowner of the results as specified
therein.
C. In order to guarantee the completion of any public
improvements required as a condition of plan approval, the Council
shall require such financial security as specified by law, prior to
approval of the plan. The Council shall require maintenance as specified
in this chapter.
All record plans shall meet the requirements
of this chapter, as amended and shall be exact replicas of the land
development plan approved by the Township Council.