[HISTORY: Adopted by the Board of Trustees of the Village of Rye Brook 4-28-1987 by L.L. No. 2-1987. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 91.
Subdivision of land — See Ch. 219.
Zoning — See Ch. 250.
[1]
Editor's Note: Former § 100-1, Filing of certified bill of costs, amended 9-9-2008 by L.L. No. 9-2008, and 10-28-2014 by L.L. No. 9-2014, was repealed 12-13-2022 by L.L. No. 7-2022.
A. 
Said bill of costs shall be certified by a licensed engineer or architect in charge of the project.
B. 
If there is no engineer or architect, the individual in charge of construction shall make the certification.
If the estimated cost listed in the building permit was underestimated, the building permit fee shall be corrected upon receipt of the certified bill of costs.
[Added 11-28-2006 by L.L. No. 20-2006]
A certified copy of any Board of Trustees or Planning Board approval or resolution granting site plan approval, a special use permit, a wetland permit, a steep slope permit or a erosion and sediment control permit shall be provided to the Building Inspector by the approving authority within a reasonable period of time. The Building Inspector shall attach the aforementioned duplicate to the copy of the building permit maintained in the Building Department's files and to the certificate of occupancy and make a notation on the certificate of occupancy indicating the date of the approval authority's resolution and the type of approval(s) granted.