[Amended 12-14-1998 by L.L. No. 10-1998]
A. Before any permit for the erection of a structure in a proposed subdivision shall be granted, the subdivider or its duly authorized agent shall apply for approval of such proposed subdivision in accordance with the following procedure, which procedure includes steps as set forth in §§
93-6 through
93-9 and Chapter
105, Article
XXV, §
105-233 et seq., when applicable.
B. Site plan review in accordance with Chapter
105, Article
XXV §
105-233 et seq., shall be required if the applicant seeks to create three or more lots.
The Board shall study the sketch layout as to whether it meets the requirements
of this chapter, and, to the extent it does not, the Board shall make specific
suggestions as to changes to be incorporated in the preliminary plat. At the
time that the informal sketch is submitted to the Planning Board, the applicant
shall also submit an application and filing fee.