home
Home
code
Code
Code
Index
law
Laws (9)
New Laws (9)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Westfield, NY
chevron_right
2018-07-11
info
chevron_right
Part II, General Legislation
chevron_right
Chapter 132 Sewers
chevron_right
Part 2 Sewer Use
Part I, Administrative Legislation
Ch 1
General Provisions
Ch 5
Auxiliary Police
Ch 9
Cable Access Advisory Committee
Ch 14
Defense and Indemnification
Ch 19
Ethics, Code of
Ch 27
Investment Policy
Ch 33
(Reserved)
Ch 37
Procurement Policy
Ch 41
Records
Ch 44
Terms of Office
Part II, General Legislation
Ch 52
Alcoholic Beverages
Ch 56
Animals
Ch 61
Bingo
Ch 65
Boats, Mooring of
Ch 70
Buildings, Numbering of
Ch 74
Buildings, Unsafe
Ch 92
Fire Prevention and Building Construction
Ch 96
Flood Damage Prevention
Ch 101
Games of Chance
Ch 104
Highways
Ch 106
Junkyards
Ch 111
Littering
Ch 113
Mobile Food Vending
Ch 115
Mobile and Modular Homes
Ch 121
Parks and Recreation Areas
Ch 132
Sewers
Ch 132 Pt 2
Sewer Use
Ch 132 Pt 2 Art II
Title and Purpose
§ 132-3
Short title.
§ 132-4
General purpose.
§ 132-5
Specific purposes.
Ch 132 Pt 2 Art III
Definitions
§ 132-6
Terms defined.
Ch 132 Pt 2 Art IV
Use of Public Sewers
§ 132-7
Waste disposal unlawful.
§ 132-8
Wastewater discharge unlawful.
§ 132-9
Wastewater disposal required for building permit.
§ 132-10
Private wastewater disposal unlawful.
§ 132-11
Connection to public sewer required.
§ 132-12
Limitation on use of public sewers.
§ 132-13
Wastewater from outside POTW service area; intermunicipal agreements.
§ 132-14
Moratorium.
§ 132-15
Basis of sewer use requirement.
§ 132-16
Connecting private sewage system to storm sewer.
§ 132-17
Discharge of sewage into wells.
Ch 132 Pt 2 Art V
Private Wastewater Disposal
§ 132-18
Public sewer unavailable; private wastewater disposal required.
§ 132-19
Construction permit application.
§ 132-20
Construction permit; inspections.
§ 132-21
Preventing nuisances; rehabilitation required.
§ 132-22
Sanitary operation required.
§ 132-23
Septage removal.
§ 132-24
Direct connection to new public sewers required.
§ 132-25
Connection of two buildings to same septic tank.
§ 132-26
Additional requirements.
Ch 132 Pt 2 Art VI
New Sewers or Sewer Extensions
§ 132-27
Proper design.
§ 132-28
Approval; costs; inspections of new sewers.
§ 132-29
Plans, specification and pipe test results required.
§ 132-30
Sewer pipe.
§ 132-31
Safety and load factors.
§ 132-32
Sewer pipe installation.
§ 132-33
Manhole installation.
§ 132-34
Infiltration/exfiltration testing.
§ 132-35
Test section.
§ 132-36
Test period.
§ 132-37
Pipe lamping.
§ 132-38
Deflection testing.
§ 132-39
Air testing alternative.
§ 132-40
Force mains.
§ 132-41
Final acceptance and warranty/surety.
§ 132-42
Liability insurance coverage during construction.
Ch 132 Pt 2 Art VII
Building Laterals and Street Laterals
§ 132-43
Permit required for sewer connections.
§ 132-44
Inflow/infiltration prohibited.
§ 132-45
Sewer lateral permits.
§ 132-46
New building laterals.
§ 132-47
Laterals serving several buildings.
§ 132-48
Laterals serving complexes.
§ 132-49
Dry sewers.
§ 132-50
Existing building laterals.
§ 132-51
Lateral pipe materials.
§ 132-52
Street lateral to public sewer connection.
§ 132-53
Future connection locations; as-built drawings.
§ 132-54
Special manhole requirements.
§ 132-55
Laterals at the near buildings.
§ 132-56
Sewer lifting.
§ 132-57
Lateral pipe installation.
§ 132-58
Watertight joints.
§ 132-59
Cast-iron pipe poured joints.
§ 132-60
Cast-iron push joints.
§ 132-61
PVC push joints.
§ 132-62
Building lateral/street lateral connection.
§ 132-63
Cleanout repair or replacement.
§ 132-64
Street lateral replacement; ownership.
§ 132-65
Testing.
§ 132-66
Connection inspection.
§ 132-67
Trench inspections.
§ 132-68
Public safety; restoration of disturbed areas.
§ 132-69
Interior cleanout.
§ 132-70
Costs borne by owner.
Ch 132 Pt 2 Art VIII
Inflow
§ 132-71
New inflow sources prohibited.
§ 132-72
Existing inflow sources disconnected.
§ 132-73
Disconnection of inflow sources when property sold.
§ 132-74
No reconnection of inflow source allowed.
§ 132-75
Charges for inflow.
Ch 132 Pt 2 Art IX
Scavenger Wastes
§ 132-76
Licenses and application.
§ 132-77
Concurrent requirements.
§ 132-78
Dumping location and timing.
§ 132-79
Notification of dumping.
Ch 132 Pt 2 Art X
Discharge Restrictions
§ 132-80
Pretreatment restrictions.
§ 132-81
General prohibitions.
§ 132-82
Concentration-based limitations.
§ 132-83
Mass-discharge-based limitations.
§ 132-84
Modification of limitations.
§ 132-85
Dilution.
§ 132-86
Grease, oil and sand interceptors.
Ch 132 Pt 2 Art XI
Discharge Permits and Pretreatment Requirements
§ 132-87
Wastewater discharge reports.
§ 132-88
Notification to industrial users.
§ 132-89
Wastewater discharges.
§ 132-90
Wastewater discharge permits for significant industrial users.
§ 132-91
Other industrial users.
§ 132-92
Discharge permits to storm sewers.
§ 132-93
Application for wastewater discharge permits.
§ 132-94
Permit modifications.
§ 132-95
Permit conditions.
§ 132-96
Permit duration.
§ 132-97
Permit reissuance.
§ 132-98
Permit transfer.
§ 132-99
Permit revocation.
§ 132-100
Public notification.
§ 132-101
Reporting requirements for permittee.
§ 132-102
Flow equalization.
§ 132-103
Monitoring stations; control manholes.
§ 132-104
Design and maintenance of facilities and monitoring stations.
§ 132-105
Vandalism; tampering with measuring devices.
§ 132-106
Sampling and analysis.
§ 132-107
Accidental discharges.
§ 132-108
Posting notices.
§ 132-109
Sample splitting.
§ 132-110
Access to information.
§ 132-111
Access to property.
§ 132-112
Access to easements.
§ 132-113
Liability of property owner.
§ 132-114
Special agreements.
Ch 132 Pt 2 Art XII
Enforcement and Penalties
§ 132-115
Enforcement response plan.
§ 132-116
Administrative remedies.
§ 132-117
Judicial remedies.
§ 132-118
Delinquent payments.
§ 132-119
Performance bonds; letters of credit.
§ 132-120
Liability insurance.
Ch 132 Pt 2 Art XIII
Charges
§ 132-121
Charges for Westfield Sanitary Sewer Improvement No. 1.
§ 132-122
Sewer use charge.
§ 132-123
Maintenance charge.
§ 132-124
Capital charge.
§ 132-125
Measurement of flow.
§ 132-126
Abnormal sewage charge.
§ 132-127
Billing period.
§ 132-128
Collection of charges.
§ 132-129
Fiscal year for system.
§ 132-130
Use of revenues.
§ 132-131
Records and accounts.
§ 132-132
Unit for billing purposes.
Ch 132 Pt 2 Art XIV
Public Disclosure of POTW Operations
§ 132-133
POTW operations open to the public.
§ 132-134
Procedural requirements available.
§ 132-135
Validity through public inspection.
Ch 139
Snowmobiles
Ch 143
Solid Waste
Ch 148
Streets and Sidewalks
Ch 151
Subdivision of Land
Ch 156
Taxation
Ch 165
Vehicles and Traffic
Ch 175
Water
Ch 185
Zoning
Appendix
Ch A191
Drug and Alcohol Testing
Disposition List
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Part 2
Sewer Use
[Adopted
2-3-1993
by
L.L. No. 1-1993
]
Article II
Title and Purpose
chevron_right
§ 132-3
Short title.
chevron_right
§ 132-4
General purpose.
chevron_right
§ 132-5
Specific purposes.
chevron_right
Article III
Definitions
chevron_right
§ 132-6
Terms defined.
chevron_right
Article IV
Use of Public Sewers
chevron_right
§ 132-7
Waste disposal unlawful.
chevron_right
§ 132-8
Wastewater discharge unlawful.
chevron_right
§ 132-9
Wastewater disposal required for building permit.
chevron_right
§ 132-10
Private wastewater disposal unlawful.
chevron_right
§ 132-11
Connection to public sewer required.
chevron_right
§ 132-12
Limitation on use of public sewers.
chevron_right
§ 132-13
Wastewater from outside POTW service area; intermunicipal agreements.
chevron_right
§ 132-14
Moratorium.
chevron_right
§ 132-15
Basis of sewer use requirement.
chevron_right
§ 132-16
Connecting private sewage system to storm sewer.
chevron_right
§ 132-17
Discharge of sewage into wells.
chevron_right
Article V
Private Wastewater Disposal
chevron_right
§ 132-18
Public sewer unavailable; private wastewater disposal required.
chevron_right
§ 132-19
Construction permit application.
chevron_right
§ 132-20
Construction permit; inspections.
chevron_right
§ 132-21
Preventing nuisances; rehabilitation required.
chevron_right
§ 132-22
Sanitary operation required.
chevron_right
§ 132-23
Septage removal.
chevron_right
§ 132-24
Direct connection to new public sewers required.
chevron_right
§ 132-25
Connection of two buildings to same septic tank.
chevron_right
§ 132-26
Additional requirements.
chevron_right
Article VI
New Sewers or Sewer Extensions
chevron_right
§ 132-27
Proper design.
chevron_right
§ 132-28
Approval; costs; inspections of new sewers.
chevron_right
§ 132-29
Plans, specification and pipe test results required.
chevron_right
§ 132-30
Sewer pipe.
chevron_right
§ 132-31
Safety and load factors.
chevron_right
§ 132-32
Sewer pipe installation.
chevron_right
§ 132-33
Manhole installation.
chevron_right
§ 132-34
Infiltration/exfiltration testing.
chevron_right
§ 132-35
Test section.
chevron_right
§ 132-36
Test period.
chevron_right
§ 132-37
Pipe lamping.
chevron_right
§ 132-38
Deflection testing.
chevron_right
§ 132-39
Air testing alternative.
chevron_right
§ 132-40
Force mains.
chevron_right
§ 132-41
Final acceptance and warranty/surety.
chevron_right
§ 132-42
Liability insurance coverage during construction.
chevron_right
Article VII
Building Laterals and Street Laterals
chevron_right
§ 132-43
Permit required for sewer connections.
chevron_right
§ 132-44
Inflow/infiltration prohibited.
chevron_right
§ 132-45
Sewer lateral permits.
chevron_right
§ 132-46
New building laterals.
chevron_right
§ 132-47
Laterals serving several buildings.
chevron_right
§ 132-48
Laterals serving complexes.
chevron_right
§ 132-49
Dry sewers.
chevron_right
§ 132-50
Existing building laterals.
chevron_right
§ 132-51
Lateral pipe materials.
chevron_right
§ 132-52
Street lateral to public sewer connection.
chevron_right
§ 132-53
Future connection locations; as-built drawings.
chevron_right
§ 132-54
Special manhole requirements.
chevron_right
§ 132-55
Laterals at the near buildings.
chevron_right
§ 132-56
Sewer lifting.
chevron_right
§ 132-57
Lateral pipe installation.
chevron_right
§ 132-58
Watertight joints.
chevron_right
§ 132-59
Cast-iron pipe poured joints.
chevron_right
§ 132-60
Cast-iron push joints.
chevron_right
§ 132-61
PVC push joints.
chevron_right
§ 132-62
Building lateral/street lateral connection.
chevron_right
§ 132-63
Cleanout repair or replacement.
chevron_right
§ 132-64
Street lateral replacement; ownership.
chevron_right
§ 132-65
Testing.
chevron_right
§ 132-66
Connection inspection.
chevron_right
§ 132-67
Trench inspections.
chevron_right
§ 132-68
Public safety; restoration of disturbed areas.
chevron_right
§ 132-69
Interior cleanout.
chevron_right
§ 132-70
Costs borne by owner.
chevron_right
Article VIII
Inflow
chevron_right
§ 132-71
New inflow sources prohibited.
chevron_right
§ 132-72
Existing inflow sources disconnected.
chevron_right
§ 132-73
Disconnection of inflow sources when property sold.
chevron_right
§ 132-74
No reconnection of inflow source allowed.
chevron_right
§ 132-75
Charges for inflow.
chevron_right
Article IX
Scavenger Wastes
chevron_right
§ 132-76
Licenses and application.
chevron_right
§ 132-77
Concurrent requirements.
chevron_right
§ 132-78
Dumping location and timing.
chevron_right
§ 132-79
Notification of dumping.
chevron_right
Article X
Discharge Restrictions
chevron_right
§ 132-80
Pretreatment restrictions.
chevron_right
§ 132-81
General prohibitions.
chevron_right
§ 132-82
Concentration-based limitations.
chevron_right
§ 132-83
Mass-discharge-based limitations.
chevron_right
§ 132-84
Modification of limitations.
chevron_right
§ 132-85
Dilution.
chevron_right
§ 132-86
Grease, oil and sand interceptors.
chevron_right
Article XI
Discharge Permits and Pretreatment Requirements
chevron_right
§ 132-87
Wastewater discharge reports.
chevron_right
§ 132-88
Notification to industrial users.
chevron_right
§ 132-89
Wastewater discharges.
chevron_right
§ 132-90
Wastewater discharge permits for significant industrial users.
chevron_right
§ 132-91
Other industrial users.
chevron_right
§ 132-92
Discharge permits to storm sewers.
chevron_right
§ 132-93
Application for wastewater discharge permits.
chevron_right
§ 132-94
Permit modifications.
chevron_right
§ 132-95
Permit conditions.
chevron_right
§ 132-96
Permit duration.
chevron_right
§ 132-97
Permit reissuance.
chevron_right
§ 132-98
Permit transfer.
chevron_right
§ 132-99
Permit revocation.
chevron_right
§ 132-100
Public notification.
chevron_right
§ 132-101
Reporting requirements for permittee.
chevron_right
§ 132-102
Flow equalization.
chevron_right
§ 132-103
Monitoring stations; control manholes.
chevron_right
§ 132-104
Design and maintenance of facilities and monitoring stations.
chevron_right
§ 132-105
Vandalism; tampering with measuring devices.
chevron_right
§ 132-106
Sampling and analysis.
chevron_right
§ 132-107
Accidental discharges.
chevron_right
§ 132-108
Posting notices.
chevron_right
§ 132-109
Sample splitting.
chevron_right
§ 132-110
Access to information.
chevron_right
§ 132-111
Access to property.
chevron_right
§ 132-112
Access to easements.
chevron_right
§ 132-113
Liability of property owner.
chevron_right
§ 132-114
Special agreements.
chevron_right
Article XII
Enforcement and Penalties
chevron_right
§ 132-115
Enforcement response plan.
chevron_right
§ 132-116
Administrative remedies.
chevron_right
§ 132-117
Judicial remedies.
chevron_right
§ 132-118
Delinquent payments.
chevron_right
§ 132-119
Performance bonds; letters of credit.
chevron_right
§ 132-120
Liability insurance.
chevron_right
Article XIII
Charges
chevron_right
§ 132-121
Charges for Westfield Sanitary Sewer Improvement No. 1.
chevron_right
§ 132-122
Sewer use charge.
chevron_right
§ 132-123
Maintenance charge.
chevron_right
§ 132-124
Capital charge.
chevron_right
§ 132-125
Measurement of flow.
chevron_right
§ 132-126
Abnormal sewage charge.
chevron_right
§ 132-127
Billing period.
chevron_right
§ 132-128
Collection of charges.
chevron_right
§ 132-129
Fiscal year for system.
chevron_right
§ 132-130
Use of revenues.
chevron_right
§ 132-131
Records and accounts.
chevron_right
§ 132-132
Unit for billing purposes.
chevron_right
Article XIV
Public Disclosure of POTW Operations
chevron_right
§ 132-133
POTW operations open to the public.
chevron_right
§ 132-134
Procedural requirements available.
chevron_right
§ 132-135
Validity through public inspection.
chevron_right