Chapter/Type of Fee
|
Fee
| |||
---|---|---|---|---|
Chapter 41, Building Construction
| ||||
Chapter 47, Driveways
[Amended 9-14-1995 by Res. No. 1995-8] | ||||
Temporary driveway permit
|
$25.00
| |||
Temporary driveway permit escrow
|
$200.00
| |||
Permanent driveway escrow
|
$650.00
| |||
Driveway permit fee
|
$50.00
| |||
Chapter 70, Mobile Home Parks
[Added 6-13-1991 by Ord. No. 1991-4;
amended 8-8-1991; 1-27-2005 by Res.
No. 2005-13] | ||||
Issuance of an original permit (mobile home park application
|
$100.00
| |||
Annual license (renewal). In addition to safety and property maintenance
issues, an annual resident update shall be required as a part of the annual
license
|
$25.00
| |||
Annual inspection of a mobile home park, per unit
|
$20.00
| |||
Chapter 85, Peddling and Soliciting
[Amended 5-14-1992 by Res. No. 1992-5] | ||||
License fee
|
$25.00
| |||
License and permit fee, no specific fee mentioned
|
$25.00
| |||
Chapter 88, Property Maintenance
|
See § A137-5
| |||
Chapter 95, Sewers
|
(Fees shall be set by the Municipal Authority; see also § A137-8)
| |||
Chapter 97, Sexually Oriented Business
[Added 1-4-1993 by Res. No. 1993-2] | ||||
Annual permit fee
|
$500.00
| |||
Chapter 99, Stormwater Management
| ||||
Stormwater management permits for activities not associated with a subdivision
or land development plan:
[Amended 1-26-2006 by Res. No. 2006-10] | ||||
0 to 0.99
|
$250
| |||
1 to 4.99
|
$300
| |||
5 to 9.99
|
$350
| |||
10 to 14.99
|
$400
| |||
15 to 21.99
|
$500
| |||
22 to 24.99
|
$600
| |||
25 to 29.99
|
$700
| |||
30 to 39.99
|
$750
| |||
40 to 49.99
|
$800
| |||
50 to 74.99
|
$850
| |||
75 to 99.99
|
$900
| |||
100 and above
|
$900, plus $10 per acre over 100 acres
| |||
Chapter 101, Streets and Sidewalks
| ||||
Article III, Excavations in Streets
[Amended 4-29-2004 by Res. No. 2004-14] | ||||
Issuance of permit
|
$50.00
| |||
Inspection fee, per square foot of opening within Township right-of-way
|
$2.50
| |||
Chapter 107, Subdivision and Land Development
| ||||
Residential subdivision review:
| ||||
1 to 5 lots
|
$275.00, plus $75.00 additional each lot
| |||
6 to 10 lots
|
$525.00, plus $75.00 additional each lot
| |||
11 or more lots
|
$775.00, plus $75.00 additional each lot
| |||
Nonresidential subdivision review:
| ||||
1 to 5 lots
|
$275.00, plus $75.00 additional each lot
| |||
6 to 10 lots
|
$525.00, plus $75.00 additional each lot
| |||
11 or more lots
|
$775.00, plus $75.00 additional each lot
| |||
Nonresidential single-tract subdivision:
| ||||
Commercial and light industrial
|
$275.00, plus $55.00 each 1,000 square feet or portion thereof of total
tract area
| |||
Heavy industrial
|
$300.00, plus $45.00 each 1,000 square feet or portion thereof of building
space or $55.00 per acre or portion thereof of total tract area, whichever
is greater
| |||
Land development
[Amended 5-26-1994 by Res. No. 1994-7] |
$500.00
| |||
Revision to an approved final plan of subdivision or land development
[Added 5-26-1994 by Res. No. 1994-7] | ||||
Ancillary expenses:
| ||||
Engineering and legal services, materials and facilities tests, dedication
and legal agreements and refunds
|
Subdivider, developer or builder must furnish security
| |||
Manufactured home parks:
| ||||
Inspection fee
|
$25.00
| |||
Permit for removal of manufactured home
|
$2.00
| |||
Article III, Admission Privilege Tax
| ||||
Amusement permit fee
|
$250.00
| |||
Amusement permit renewal fee
|
$25.00
| |||
Duplicate amusement permit
|
$25.00
| |||
Tax certifications
[Added 3-10-1994 by Ord. No. 1994-9;
amended 12-21-2006 by Res. No. 2006-23] |
$20
| |||
Ch. 122, Traffic Impact Fees
[Added 5-23-2002 by Res. No. 2002-16] | ||||
TSA West
|
$0
| |||
TSA East
|
$1,011
| |||
Chapter 129, Water
[Amended 1-3-1995 by Res. No. 1995-2] | ||||
Part 1, Public Water System
|
(Fees shall be set by the Municipal Authority)
| |||
Part 2, On-Lot Wells
[Amended 1-2-2001 by Res. No. 2001-7A; 1-6-2003
by Res. No. 2003-7; 1-2-2007 by Res.
No. 2007-8] | ||||
Well permit fee for applications where an on-lot sewage disposal permit
is also required
|
$75.00
| |||
Well permit fee for applications where an on-lot sewage disposal permit
is not required
|
$75.00
| |||
LTL portion
[Added 1-3-2005 by Res. No. 2005-6] |
Billed hourly
| |||
Chapter 131, Zoning
|
Type of Service
|
Fee
| ||
Temporary services
|
$60
| ||
Service not over 200 amp
|
$60
| ||
Over 200 but not over 600 amp
|
$70
| ||
Over 600 but not over 1,000 amp
|
$87.50
| ||
Over 1,000 amp
|
$95
| ||
Additional meters
|
$12
|
Type of Wiring
|
Fee
| |||
---|---|---|---|---|
New single-family dwelling
| ||||
200 amp or less
| ||||
Rough or service (each)
|
$60
| |||
Rough and service at same time
|
$95
| |||
Over 200 amp but not over 600
| ||||
Rough or service (each)
|
$70
| |||
Rough and service at same time
|
$125
|
Type
|
Fee
| |
Special appointments
|
$53
| |
Return trip due to reinspection
|
$53
| |
Duplicate final certificate
|
$7
|
Type
|
Fee
| |
Service
|
$60
| |
Rough
|
$42
| |
Final
|
$30
|
Activity
|
Fee
| ||
---|---|---|---|
Residential repair permit not requiring testing (e.g., failed septic
tank, crushed pipe); includes permit and inspection
|
$125
| ||
Residential repair permits requiring soils testing and perc tests (includes
everything associated with permit: testing, design review, inspections, etc.)
|
$535
| ||
Nonresidential repairs to be billed at the SEO 1 or SEO 2/principal
hourly rate for all time spent on the project
| |||
SEO 1
|
$50
| ||
SEO 2/principal
|
$56.25
| ||
Additional probes (beyond initial 2) (repair)
|
$41
| ||
Additional perc test (repair)
|
$225
| ||
In-ground permit (includes design review, issuing permit and 3 installation
inspections)
|
$325
| ||
Sandmound and drip irrigation permit (includes design review, issuing
permit and 4 installation inspections)
|
$390
| ||
Design review
|
$85
| ||
Issue/transfer permits
|
$52.50
| ||
Inspections, additional
|
$65
| ||
Annual holding tank inspections
|
$51.25
| ||
Other SEO work (hourly rate):
| |||
SEO 1
|
$50
| ||
SEO 2/principal
|
$56.25
| ||
Other SEO work (repair)
|
$28.75
| ||
Administrative costs
|
$40.50
|
Service
|
Fee
| |
---|---|---|
Initial 2 probes
|
$135
| |
Additional probes
|
$67.50
| |
Percolation tests (six-hole perc test)
|
$410
| |
Percolation tests (12-hole double test for primary and alternate areas)
|
$700
|
NOTE: Hourly rate will be billed for planning module review, verification
of prior testing, miscellaneous site visits at property owner's request,
and other items not covered by basic fee schedule.
|
Retail Towing Rates
| ||
---|---|---|
Type
|
Rate
| |
Light duty
(Less than 10,000 GVW)
|
$45/$3 per loaded mile
| |
Medium duty
(10,001 - 16,000 GVW)
|
$55/$3.50 per loaded mile
| |
Heavy duty
(Greater than 16,001 GVW)
|
$100 per hour from shop until return
| |
Super heavy duty
(Greater than 50,000 GVW)
|
$125 per hour from shop until return
|
Retail Road Service Rates
| ||
---|---|---|
Type
|
Rate
| |
Light duty
(Less than 10,000 GVW)
|
$30/$1 per mile after five miles to vehicle
| |
Heavy duty
(Greater than 10,000 GVW)
|
$60 per hour, one-hour minimum
|
Retail Winching Rates
| ||
---|---|---|
Type
|
Rate
| |
Light duty
(Less than 10,000 GVW)
|
$60 per 1/2 hour (minimum 1/2 hour charge)
| |
Medium duty
(10,000 - 16,000 GVW)
|
$85 per 1/2 hour (minimum 1/2 hour charge)
| |
Heavy duty
(Greater than 16,001 GVW)
|
$150 per 1/2 hour (minimum 1/2 hour charge)
|
AAA Towing Rates
| ||
---|---|---|
Type
|
Rate
| |
Light duty
(Less than 10,000 GVW or unloaded dual-wheeled pickup trucks)
|
Refer to AAA road service rates
| |
Anything larger
|
Use appropriate rate schedule
|
Accident Rates
| ||
---|---|---|
Type
|
Rate
| |
Light duty
(Less than 10,000 GVW)
|
$85 (price includes towing back to Berks-Mont Towing)
| |
$25.00 added if vehicle is more than on its side, roof or more than
25 feet from the roadway
| ||
Medium duty
(10,001 - 16,000 GVW)
|
Price is calculated as price per pound using Wreckmaster & Norman
Horton's PPP chart
| |
Heavy duty
(Greater than 16,001)
|
Price is calculated as price per pound using Wreckmaster & Norman
Horton's PPP chart
|
Type
|
Fee
| ||
---|---|---|---|
Permit for sanitary landfill, incinerators or solid waste management
facilities:
| |||
Initial permit
|
$30,000.00
| ||
Deposit (additional)
|
$25,000.00
| ||
Permit renewal
|
$10,000.00
|
Type
|
Fee
| |
---|---|---|
Fee to be paid at the time of the filing of an appeal with the Zoning
Hearing Board of Washington Township from the refusal of the Zoning Officer
to grant a zoning permit and/or a certificate of use and occupancy
|
$600.00
| |
Fee to be paid at the time of the filing of unified appeals before the
Zoning Hearing Board
|
$600.00
| |
Fee to be paid at the time application is made to the Zoning Hearing
Board for a variance
|
$600.00
| |
Fee to be paid at the time application is made to the Zoning Hearing
Board for a special exception
|
$600.00
| |
$1,000.00
| ||
Fee to be paid at the time of filing of applications for curative amendments
before the Board of Supervisors
|
$1,000.00
| |
Fee to be paid at the time of filing an application to the Board of
Supervisors for a conditional use
|
$600.00
|