Sewer laterals and water services shall be installed
to the right-of-way (or easement) line for all lots. Each service
shall be located with a stake color coded in conformance with Industrial
Code 53 to denote the type of service they represent.
The monuments shall be installed at those locations
shown on the approved final plan and as located in the field by a
licensed land surveyor. They shall be installed to a depth of at least
30 inches below finished grade with the top surface to be flush with
finished grade. Upon the installation of the monuments the location
shall be certified to the town by a licensed land surveyor as to their
accuracy.
During the time period between initial installation
and testing and acceptance for dedication, debris and/or sediment
may accumulate in the utility systems. The developer shall be responsible
to flush and remove this debris from the system prior to the final
inspection for dedication.