[Adopted 9-20-2007 by L.L. No. 9-2007]
A survey, sealed by a licensed surveyor, showing the as-built foundation, shall be required to be prepared and delivered to the Building Inspector prior to framing in the following instances:
A. 
Where the proposed construction requires environmental permits for wetlands or steep slopes.
B. 
Where the approved plans show the foundation to be built within two feet of the applicable setback.
C. 
Where the Building Inspector determines such to be necessary based on the particular circumstances of the proposed construction.