The time of submission of the preliminary plat
shall be considered to be the date of the regular monthly meeting
of the Planning Board at which time the Planning Board considers the
preliminary plat in final form, which preliminary plat in final form
shall have been submitted to the Village Engineer 14 days prior to
the regular monthly meeting at which it is received by the Planning
Board, complete and accompanied by the required fee, and all data
required by this Part 2 have been filed with the Village Engineer.
If the site borders a county or state road,
copies of the preliminary submission shall be forwarded to the Orange
County Department of Public Works and/or the Regional Office of the
New York State Department of Transportation in time for their comments
to be returned and read into the minutes of the public hearing. If
the site lies within 500 feet of a county or state road, drainage
easement, institution or park or within 500 feet of a municipal boundary,
a copy of the preliminary submission shall be forwarded to the Orange
County Department of Planning in time for their comments to be returned
and read into the minutes of the public hearing.
The Planning Board shall hold a public hearing
within 45 days after the Planning Board receives a preliminary plat
in final form. The hearing shall be advertised at least once in the
official Village newspaper at least five days prior to the hearing
and shall be posted and mailed to the owners of property abutting
the proposed subdivision and to any other persons whom the Planning
Board determines shall have a particular interest in the project.