The contractor, developer and/or the plumber
shall excavate the trench necessary for the installation of the water
line. See § 9.93.
The Township shall make the tap and supply the
meter.
The contractor, developer and/or plumber shall backfill the open trench and shall repair the trench surface in compliance with the ordinance and resolution governing street excavations (Chapter
304, Streets and Sidewalks, Article
III, Street Excavations).
The contractor, developer and/or plumber shall
supply all material necessary except those supplied by the Township.