[HISTORY: Adopted by the Mayor and Council of the Borough of Metuchen 12-27-1976 by Ord. No. 76-33. Amendments noted where applicable.]
A. 
There is hereby established in the Borough of Metuchen, a State Uniform Construction Code enforcing agency to be known as the Code Enforcement Agency, consisting of a Construction Code Official, Building Subcode Official, Plumbing Subcode Official, Electrical Subcode Official, and/or agency, Fire Protection Subcode Official and such other subcode officials for such additional subcodes as the Commissioner of the Department of Community Affairs of the State of New Jersey shall hereafter adopt as part of the State Uniform Construction Code. The Construction Code Official shall be the chief administrator of the enforcing agency. In lieu of an appointment of an Electrical Subcode Official or a contract with an electrical on-site inspection agency, the existing electrical inspection authorities may continue to operate as per N.J.A.C. 14:5-71.1 et seq. until the Borough of Metuchen directly contracts with same, but in no case shall such existing electrical inspection authorities continue after January 1, 1978, except in conformity with Article 36 of the Regulations of the New Jersey Administrative Code. The Plumbing Inspector currently employed by the Metuchen Board of Health shall be removed therefrom and shall assume the position of Plumbing Subcode Official pursuant to the law made and provided therefor, and under the terms and conditions hereof.
[Amended 9-15-1997 by Ord. No. 97-20]
B. 
Each official position created in Subsection A hereof shall be filled by a person qualified for such position pursuant to N.J.S.A. 52:27D-119 et seq., as amended, and N.J.A.C. 5:23, provided that in lieu of any particular subcode official, an on-site inspection agency may be retained by contract pursuant to N.J.A.C. 5:23. More than one such official position may be held by the same person, provided that such person is qualified pursuant to N.J.S.A. 52:27D-119 et seq. and N.J.A.C. 5:23 to hold each such position.
C. 
The public shall have the right to do business with the Code Enforcement Agency at Borough Hall, corner of Main Street and Middlesex Avenue, Metuchen, New Jersey, except for emergencies and unforeseen or unavoidable circumstances.
[Last amended 9-13-2021 by Ord. No. 2021-16]
A. 
Definitions. Unless defined herein, all terms shall have the meanings described in the State Uniform Construction Code or as commonly understood in the construction industry unless the context indicates a different meaning.
COLLECTION OF FEES
All fees required for plan review and for the issuance of any permit or certificate shall be collected prior to the issuance of the permit or certificate. Fees shall be computed in accordance with the requirements and standards set in the State Uniform Construction Code and in accordance with the following fee schedule.
COMMERCIAL
All other use groups which are not R-5 use group, including but not limited to A-1, A-2, A-3, A-4, A-5, B, E, F-1, F-2, H-1, H-2, H-3, H-4, H-5, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, S-1, S-2, U.
CONSTRUCTION PERMIT
The fee for a construction permit shall be the sum of the subcode fees, certificate fees, state fees, etc.
PLAN REVIEW FEE
Twenty percent of the construction permit fee shall be deemed to be the plan review fee. Plan review fees shall not be refundable.
RESIDENTIAL
Only use group R-5.
B. 
Construction fees.
(1) 
Plan review fees (N.J.A.C. 5:23-4.18).
(a) 
The fee for a construction permit shall be as follows, and shall be paid before issuance of the construction permit:
[1] 
DCA training fees: In accordance with N.J.A.C. 5:23-4.19(b) per the State Uniform Construction Code.
(b) 
Twenty percent to be paid for plan review and prototype plans is nonrefundable.
(c) 
Request for permit refund. The amount paid as the plan review fee will be deducted from the total permit fee upon issuance. The plan review fee of 20% is nonrefundable.
(2) 
Variation fees.
(a) 
N.J.A.C. 5:23-2.10 application for variation for:
[1] 
Use group R-5: $120 per subcode.
[2] 
All other use groups: $500 per subcode.
(3) 
Certificate of occupancy (CO).
(a) 
Use group R-5: $100.
(b) 
All other use groups: $200.
(c) 
Continued use of occupancy (CCO).
[1] 
Use group R-5: $50 per subcode.
[2] 
All other use groups: $75 per subcode; $50 per subcode for reinspection.
(d) 
Change of use.
[1] 
All use groups: $75 per subcode; $50 per subcode for reinspection.
(e) 
Temporary use/structure.
[1] 
Use group R-5: $100.
[2] 
All other use groups: $200.
(f) 
Temporary trailer.
[1] 
Use group R-5: $100.
[2] 
All other use groups: $150.
(g) 
Temporary certificate of occupancy.
[1] 
All use groups: $30.
(4) 
Building subcode fee schedule:
(a) 
New construction.
[1] 
Use group R-5: basic volume multiplied by 0.030: cubic feet x 0.030.
[2] 
All other use groups: basic volume multiplied by 0.035: cubic feet x 0.035.
(b) 
Footing and foundation partial release all use groups: cubic feet x 0.035.
(c) 
Open area buildings as per the Uniform Construction Code 5:23-4.18(c)1vi: cubic volume x 0.024.
(d) 
For alterations, repairs, renovations, reconstruction, or work that cubic volume cannot be calculated, the fee will be based on cost of the work.
[1] 
Use group R-5: $30 x $1,000.
[2] 
All other use groups: $35 x $1,000.
(e) 
Antenna, dish, etc.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $250.
(f) 
Asbestos removal, administrative fee: $120.
[1] 
For educational and public buildings subject to the provisions of Subchapter 8 plus certificate of occupancy: $24.
(g) 
Demolition.
[1] 
Residential structures.
[a] 
Use group R-5: $500.
[b] 
Garages, decks, pools, utility sheds: $100.
[2] 
All commercial structures and other groups: $1,500.
(h) 
Fences.
[1] 
Residential R-5: $75.
[2] 
All other use groups over six feet or pool barriers: $35 per $1,000.
(i) 
Pool.
[1] 
Private, above ground: $75.
[2] 
Private, in-ground: $150.
[3] 
Public: $250.
(j) 
Roofing and siding.
[1] 
Use group R-5: $30 per $1,000.
[2] 
All other use groups: $35 per $1,000, contract required.
(k) 
Shed.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $150.
(l) 
Signs.
[1] 
All use groups: $3.50 per square foot or minimum fee of $75.
(m) 
Tent, temporary structure.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $150.
(n) 
Temporary trailer.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $250.
(o) 
Fireplace, woodstove, fire pits.
[1] 
Use group R-5: $100.
[2] 
All other use groups: $200.
(p) 
Change of contractor.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $125.
(q) 
Minimum fee.
[1] 
Use group R-5: $75.
[2] 
All other use groups: $125.
(r) 
For items not listed above, fee shall be based on cost of alterations/installation at $30 per $1,000 with a minimum fee of $75 for R-5 and $35 per $1,000 with a minimum fee of $125 for all other Use groups, including, but not limited to, A-1, A-2, A-3, A-4, A-5, B, E, F-1, F-2, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, S-1, S-2, and U.
[1] 
Special inspection request on off-duty hours: $250.
(5) 
Elevator devices (N.J.A.C. 5:23-12.4). New elevator and elevator test shall be performed by a State Subcode Department of Community Affairs (DCA) Inspector by approved resolution and in accordance with N.J.A.C. 5:23.12.
(6) 
Electrical subcode fee schedule.
(a) 
Devices.
Number of Devices
Use Group R-5
All Other Use Groups
1 to 10
$50
$100
11 to 50
$100
$150
Add $25 per each group of 25 devices, or fraction thereof, over 51 count
(b) 
Electrical services.
Amperes
Use Group R-5
All Other Use Groups
Up to 100 AMPS
$100
$125
101 to 200 AMPS
$125
$150
201 to 300 AMPS
$150
$200
301 to 400 AMPS
$200
$300
401 to 800 AMPS
$300
$400
Over 800 AMPS: add $100 per each additional 100 AMPS, or fraction thereof.
Reconnect service
$75
$100
(c) 
Subpanels, disconnects and control panels.
Amperes
Use Group R-5
All Other Use Groups
Up to 100 AMPS
$50
$100
101 to 200 AMPS
$75
$125
Over 200 AMPS: add $25 per each 100 AMPS, or fraction thereof.
Meter change only
$75
$125
(d) 
Feeders.
Action
Use Group R-5
All Other Use Groups
Relocate, replace or add new
$50
$75
(e) 
Pools.
Type/Action
Use Group R-5
All Other Use Groups
Aboveground
$75
$125
In-ground
$150
$250
Over 1,200 square feet
$250
$500
Bonding
$75
$125
Annual pool inspection
One pool
$200
Additional pool
$100
Spa-hot tub
$100
$150
Fish pond
$100
$150
Hydro tub
$75
$150
(f) 
Transformers.
Kilovolts
Use Group R-5
All Other Use Groups
Up to 10 KVA
$75
$100
11 to 45 KVA
$100
$125
46 to 112.5 KVA
$200
113 to 500 KVA
$500
Add $50 for each 100 KVA or fraction thereof over 500 KVA.
(g) 
Motors.
Horsepower
Fee
Less than 1 HP
$10
1 to 5 HP
$40
6 to 25 HP
$75
26 to 50 HP
$100
51 to 100 HP
$150
Add $50 for each 50 HP or fraction thereof over 100 HP
(h) 
Automatic transfer switches.
Amperes
Use Group R-5
All Other Use Groups
Up to 100 AMPS
$50
$100
101 to 200 AMPS
$75
$125
201 to 400 AMPS
$100
$150
401 AMPS up add $50 for each 100 AMPS or part
(i) 
Generators.
Kilowatts
Use Group R-5
All Other Use Groups
Up to 10 KW
$50
$100
11 to 25 KW
$100
$150
26 to 50 KW
$150
$250
51 to 100 KW
$200
$300
101 to 300 KW
$500
Add $100 for each 100 KW or fraction thereof over 300 KW
(j) 
Light poles (each).
[1] 
Use Group R-5: $50.
[2] 
All other use groups: $125.
(k) 
Equipment.
Type
Use Group R-5
All Other Use Groups
A/C and air handler
$75
$125
Boilers/furnaces
$75
$125
Radon fan
$75
$125
HVAC CU
$75
$125
Kitchen appliances
(fixed in place)
$75
$125
Electric water heater
$75
$125
Battery chargers
$75
$125
Signs (each)
$125
(l) 
Solar systems.
Kilowatts
Use Group R-5
All Other Use Groups
1 to 50 KW
$75
$125
51 to 100 KW
$250
Over 101 KW
$500
Utility grid tie
$75
$125
(All related equipment to be itemized for fees)
(m) 
Alarm systems (burglar, fire, CCTV, access, etc.).
Note: R-5 alarm systems exempt 3-5-2018.
Number of Devices
Use Group R-5
All Other Use Groups
1 to 15 devices
$50
$75
Add $5 for each additional 5 devices or fraction thereof over 15
Alarm panels
$50
$125
(n) 
Irrigation systems: $125.
Note: R-5 irrigation systems exempt 3-5-2018.
(o) 
Minimum fee.
[1] 
Use Group R-5: $75.
[2] 
All other use groups: $125.
(p) 
Change of contractor.
[1] 
Use Group R-5: $75.
[2] 
All other use groups: $125.
(q) 
Voltages in excess of 600 volts AC fees shall be $ 75 per $1,000 of estimated job costs (with a minimum fee of $500).
(r) 
Plan review fee shall be 20% of electrical subcode fees, and nonrefundable. (Fee is subject to percentage of estimated costs, or itemized listing fees.)
(s) 
Fee for devices not listed above shall be based on cost of alterations/installation at $30 per $1,000 with a minimum fee of $75 for R-5 and $35 per $1,000 with a minimum fee of $125 for all other use groups, including, but not limited to, A-1, A-2, A-3, A-4, A-5, B, E, F-1, F-2, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, S-1, S-2, and U. Special inspection request on off-duty hours $250.
(7) 
Plumbing subcode fee schedule.
Type
Use Group R-5
All Other Use Groups
Bathtub
$20
$30
Condensate line
$20
$30
Dishwasher
$20
$30
Drinking fountain
$20
$30
Fixtures
$20
$30
Floor drain
$20
$30
Garbage disposal
$20
$30
Hose bib/hydrant
$20
$30
Humidifier
$20
$30
Ice maker
$20
$30
Lavatory
$20
$30
Medical gas points
$20
$30
Removal or capping of fixture
$20
$30
Roof drain
$20
$30
Shower
$20
$30
Sink
$20
$30
Stack
$20
$30
Trap primer
$20
$30
Urinal or bidet
$20
$30
Washing machine
$20
$30
Water closet
$20
$30
Similar device or fixture
$20
$30
Air-conditioning system
$75
$125
Backflow preventer
$75
$125
Backflow preventer yearly test/certification
$125
Backwater valve
$75
$125
Cooling tower
$75
$125
Fuel oil piping
$75
$125
Fuel piping
$75
$125
Furnace
$75
$125
Gas fire appliance/equipment
$75
$125
Gas piping
$75
$125
Generator
$75
$125
Grease trap
$75
$125
Hot water boiler
$75
$125
Interceptor/separator
$75
$125
Irrigation system
$75
$125
Lawn sprinkler
$75
$125
Oil separator
$75
$125
Pool heater
$75
$125
Pressure test
$75
$125
Refrigeration unit
$75
$125
Removal of equipment
$75
$125
Rooftop units
$75
$125
Sewer backflow valve
$75
$125
Sewer cap
$75
$125
Sewer connection
$75
$125
Sewer ejector
$75
$125
Sewer pump
$75
$125
Steam boiler
$75
$125
Sump pump
$75
$125
Warm-air heating unit
$75
$125
Water connection
$75
$125
Water-cooled air conditioner
$75
$125
Water heater
$75
$125
Similar equipment or devices
$75
$125
Minimum fee
$75
$125
Change of contractor
$75
$125
Fee for items not listed above shall be based on cost of alterations/installation at $30 per $1,000 with a minimum fee of $75 for R-5 and $35 per $1,000 with a minimum fee of $125 for all other use groups, including, but not limited to, A-1, A-2, A-3, A-4, A-5, B, E, F-1, F-2, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, S-1, S-2, and U. Special inspection request on off-duty hours: $250.
(8) 
Mechanical fees.
(a) 
Existing R-3 and R-5 replacement.
Type of Equipment/Service
Fee
A/C unit condenser
$75
Air handler
$75
A/C with air handler
$125
Appliance, conversion of oil to gas
$125
Backflow preventer
$75
Boiler with gas piping
$125
Boiler, steam
$75
Boiler, hot water
$75
Chimney liner
$75
Condensate line
$20
Ductwork
$75
Fireplace
$75
Fireplace with gas
$125
Fireplace insert
$75
Fuel oil piping
$75
Furnace
$75
Furnace with ductwork
$150
Gas piping
$75
Generator
$125
Grease trap
$75
Irrigation
$75
Kitchen hood systems
$125
Kitchen, gas appliance
$75
LP, gas tank
$75
Makeup air-ventilation system
$75
Oil to gas conversion
$75
Oil separator
$75
Pool heater
$75
Pressure test
$75
Refrigeration unit
$75
Sewer ejector
$75
Split system
$125
Steam generator
$75
Sump pump
$75
Tankless water heater
$75
Water heater
$75
Similar equipment
$75
Change of contractor
$75
Minimum fee
$75
(9) 
Fire subcode fee schedule.
(a) 
Gas- or oil-fired appliances.
Type
Use Group R-5
All Other Use Groups
Appliance venting
$75
$125
Boiler
$75
$125
Chimney/chimney liner
$75
$125
Fireplace/wood stove
$75
$125
Gas fireplace insert
$75
$125
Furnace
$75
$125
Generator
$75
$125
Tankless water heater
$75
$125
Water heater
$75
$125
Solar
$75
$125
(b) 
Sprinklers and other equipment.
Type
All Use Groups
1 to 20 heads
$150
21 to 100 heads
$200
101 to 400 heads
$400
400 to 600 heads
$600
Each additional head over 600 add $5
Sprinkler riser
$100
Spray booth
$250
Standpipe riser
$225
Fire pump
$300
Hydraulically designed system calculation
$75
Water storage tank for fire protection system
$400
Fire flow test
$125
Site fire protection, underground and mains
$200
Hydrants
$125
Fire Department connection
$125
Main sprinkler alarm valve replacement
$75
Post-indicator control valve (PIV valve)
$75
Range hood extinguishing system
Wet chemical
$125
Dry chemical
$125
CO2 suppression
$125
Hood exhaust system
Type 1
$125
Type 2
$125
Exhaust systems (gas, vapor and smoke)
$125
Foam fire suppression system
$150
Preengineered fire suppression system
$125
Automatic fire alarm system
$150
Central station alarm
$75
Manuel fire alarm system
$75
Fire alarm device (horn, strobes, pull station and signaling devices)
1 to 5
$75
6 to 20
$100
Over 20, lots of 20, or part of
$150
Duct smoke detector
1 to 5
$75
6 to 20
$100
Over 20, lots of 20, or part of
$150
(c) 
Smoke and carbon monoxide detectors.
Type/Number
Use Group R-5
All Other Use Groups
Smoke detectors
1 to 5
$50
$125
6 to 20
$75
$150
Over 20, lots of 20, or part of
$100
$200
CO detectors
1 to 5
$50
$125
6 to 20
$75
$150
Over 20, lots of 20, or part of
$100
$200
 
(d) 
Additional equipment and services.
Type/Number
All Use Groups
Flame or beam smoke detector
1 to 5
$75
6 to 20
$100
Over 20, lots of 20, or part of
$150
Heat detector
1 to 5
$75
6 to 20
$100
Over 20, lots of 20, or part of
$150
Smoke/fire damper
$75
Security locks to fire system
$75
Smoke control/removal system
$400
Elevator recall
$150
Plan review of emergency lights, exit signs (each 5 or part of)
$75
Tank installation, removal, abandon or replace
0 to 500
$100
501 to 1,000
$200
1,001 to 2,000
$300
2,001 to 5,000
$400
5,001 to 10,000
$500
10,001 to 20,000
$600
20,001 to 50,000
$700
50,001 and up
$1,000
Fuel dispenser
$150
Vapor recovery system
$150
Shear valves/connection
$150
Fuel piping and valve
$150
Fire protection backflow preventer
$150
Incinerator and crematorium
$400
Witnessing of test
$300
(e) 
Minimum fee.
[1] 
Use Group R-5: $75.
[2] 
All other use groups: $125.
(f) 
Change of contractor.
[1] 
Use Group R-5: $75.
[2] 
All other use groups: $125.
(g) 
Fee for systems and devices not listed above shall be based on cost of alterations/installation at $30 per $1,000 with a minimum fee of $75 for R-5 and $35 per $1,000 with a minimum fee of $125 for all other use groups, including, but not limited to, A-1, A-2, A-3, A-4, A-5, B, E, F-1, F-2, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, R-1, R-2, R-3, R-4, S-1, S-2, and U. Special inspection request on off-duty hours: $250.
Pursuant to N.J.A.C. 5:23, the fire limits of the borough are hereby established as the lines designating the B-1 and B-2 districts as set forth in Chapter 110, Land Development.
The Construction Code Official shall prepare and submit to the Mayor and Council biannually, a report reevaluating the delineation of the fire limits. This report shall indicate the recommendations of the Construction Code Official, the Building Subcode Official and the Fire Subcode Official regarding those areas which should be designated as within fire limits, with the reasons therefor.