A stormwater pollution prevention plan consistent with the requirements of Article
I of this chapter and Articles
XXI and
XXII of Chapter
265 of this Code shall be required. The SWPPP shall meet the performance and design criteria and standards in Articles
XXI and
XXII of Chapter
265 of this Code. The approved erosion control permit shall be consistent with the provisions of this Code.