In the event that a person fails to comply with the requirements of this Part
2, or fails to conform to the requirements of any permit issued hereunder, the Township of Exeter will provide notification of the violation. After notice is provided, failure to correct violations in a timely manner may result in additional violations.
The Township Board of Supervisors is hereby authorized and directed to enforce all of the provisions of this Part
2. All inspections regarding compliance with the drainage plan shall be the responsibility of the Township Engineer or other qualified persons designated by the Township of Exeter.
A. No person shall modify, remove, fill, landscape or alter any SWM
BMPs, facilities, areas, or structures, without the written approval
of the Township of Exeter.
B. Upon presentation of proper credentials, the Township may enter at reasonable times upon any property within the Township of Exeter to inspect the condition of the stormwater structures and facilities in regard to any aspect regulated by this Part
2.
C. It shall be unlawful for a person to undertake any regulated activity except as provided in an approved SWM site plan, unless specifically exempted from the requirement to submit a SWM site plan by this Part
2.
D. The developer shall be responsible for providing as-built plans of
all SWM BMPs included in the approved SWM site plan. The as-built
plans and an explanation of any discrepancies with the construction
plans shall be submitted by the developer to the Township of Exeter.
E. The as-built submission shall include a certification of completion
signed by a qualified professional verifying that all permanent SWM
BMPs have been constructed according to the approved plans and specifications.
If any licensed qualified professionals contributed to the construction
plans, then a licensed qualified professional must sign the completion
certificate.
F. After receipt of the completion certificate by the Township of Exeter,
the Township of Exeter may conduct a final inspection.
G. Inspections regarding compliance with the SWM site plan are a responsibility
of the Township of Exeter.
H. The Township of Exeter may withhold an occupancy permit until a certificate
of completion has been provided by the developer.