Exciting enhancements are coming soon to eCode360! Learn more 🡪
Stephenson County, IL
 
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
[Amended 1-12-1999 by Ord. No. 99-03-240]
Whenever a food establishment is constructed or extensively remodeled, and whenever an existing structure is converted to use as a food establishment, properly prepared plans and specifications for such construction, remodeling, or conversion shall be submitted to the health authority for review and approval before construction, remodeling or conversion is begun. The plans and specifications shall indicate the proposed layout, arrangement, mechanical plans, and construction materials of work areas, and the type and model of proposed fixed equipment and facilities. The health authority shall approve the plans and specifications, if they meet the requirements of this chapter. No food establishment shall be constructed or converted, except in accordance with plans and specifications approved by the health authority. No proposed food service establishment, not on city sewer, will be approved for operation unless the septic system is sized for its seating capacity, according to the rules and regulations of the State of Illinois Department of Public Health. No proposed food establishment water system will be approved unless it conforms to state and local laws.
Whenever plans and specifications are required by § 257-29 of this chapter to be submitted to the health authority, the health authority shall inspect the food establishment prior to the start of operations to determine compliance with the approved plans and specifications and with the requirements of this chapter. No food establishment will be allowed to operate until its operation is approved by the health authority.